低约束旋旋桩与承台连接的位移延性评价

IF 1.4 4区 管理学 Q2 ENGINEERING, MULTIDISCIPLINARY International Journal of Technology Management Pub Date : 2023-06-28 DOI:10.14716/ijtech.v14i4.5889
M. Orientilize, W. Prakoso, Y. Lase, Sidiq Purnomo, Ignatius Harry Sumartono, Winda Agustin
{"title":"低约束旋旋桩与承台连接的位移延性评价","authors":"M. Orientilize, W. Prakoso, Y. Lase, Sidiq Purnomo, Ignatius Harry Sumartono, Winda Agustin","doi":"10.14716/ijtech.v14i4.5889","DOIUrl":null,"url":null,"abstract":". Experimental study was carried out on three low confinement spun piles to pile cap connections. The detail followed the typically fixed connection in Indonesia. Reinforced concrete was filled to the spun pile to strengthen the connection region, except SPPC01. Different concrete types were used, shrinkage and non-shrinkage for SPPC02 and SPPC03, respectively. SPPC02 and SPPC03 could reach the targeted drift of 3.5% whereas SPPC01 was stopped at a drift of 2.75%. There was no shear failure detected during the test. The connection behaved as a fixed connection indicated by the fracture failure of the prestressed bars near the connection region. Analysis of the test results focused on displacement ductility. Two definitions of yield and ultimate displacement were employed to seek the possible ductility values. It varied from 3.05 to 6.04 for SPPC01 and from 3.01 to 4.95 for SPPC02 and SPPC03. The non-shrinkage concrete did not affect the strength of the connection but slightly improved the post-peak behavior. The ductility is 6 – 12% higher than spun piles with ordinary concrete. According to the limited ductility referring to ATC 96, JRA 2002, and AASHTO 2011, all specimens could achieve target ductility 3. Hence, it can be concluded that the low confinement spun pile connections performed well in displacement ductility.","PeriodicalId":50285,"journal":{"name":"International Journal of Technology Management","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2023-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Evaluation of Displacement Ductility of Low Confinement Spun Pile to Pile Cap Connections\",\"authors\":\"M. Orientilize, W. Prakoso, Y. Lase, Sidiq Purnomo, Ignatius Harry Sumartono, Winda Agustin\",\"doi\":\"10.14716/ijtech.v14i4.5889\",\"DOIUrl\":null,\"url\":null,\"abstract\":\". Experimental study was carried out on three low confinement spun piles to pile cap connections. The detail followed the typically fixed connection in Indonesia. Reinforced concrete was filled to the spun pile to strengthen the connection region, except SPPC01. Different concrete types were used, shrinkage and non-shrinkage for SPPC02 and SPPC03, respectively. SPPC02 and SPPC03 could reach the targeted drift of 3.5% whereas SPPC01 was stopped at a drift of 2.75%. There was no shear failure detected during the test. The connection behaved as a fixed connection indicated by the fracture failure of the prestressed bars near the connection region. Analysis of the test results focused on displacement ductility. Two definitions of yield and ultimate displacement were employed to seek the possible ductility values. It varied from 3.05 to 6.04 for SPPC01 and from 3.01 to 4.95 for SPPC02 and SPPC03. The non-shrinkage concrete did not affect the strength of the connection but slightly improved the post-peak behavior. The ductility is 6 – 12% higher than spun piles with ordinary concrete. According to the limited ductility referring to ATC 96, JRA 2002, and AASHTO 2011, all specimens could achieve target ductility 3. Hence, it can be concluded that the low confinement spun pile connections performed well in displacement ductility.\",\"PeriodicalId\":50285,\"journal\":{\"name\":\"International Journal of Technology Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2023-06-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Technology Management\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.14716/ijtech.v14i4.5889\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Technology Management","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.14716/ijtech.v14i4.5889","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

. 对3种低约束旋压桩与承台连接进行了试验研究。细节遵循印度尼西亚典型的固定连接。除SPPC01外,在旋桩内填充钢筋混凝土加固连接区域。采用不同的混凝土类型,SPPC02和SPPC03分别为收缩和不收缩混凝土。SPPC02和SPPC03可以达到3.5%的目标漂移,而SPPC01在2.75%的漂移时停止。试验过程中未检测到剪切破坏。连接区域附近预应力杆的断裂破坏表明该连接为固定连接。对试验结果进行了位移延性分析。采用屈服和极限位移两种定义来寻求可能的延性值。SPPC01为3.05 ~ 6.04,SPPC02和SPPC03为3.01 ~ 4.95。不收缩混凝土不影响连接的强度,但略有改善峰后性能。其延性比普通混凝土旋打桩高6 ~ 12%。根据ATC 96、JRA 2002和AASHTO 2011的有限延性标准,所有试件均可达到目标延性3。由此可见,低约束桩连接具有良好的位移延性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Evaluation of Displacement Ductility of Low Confinement Spun Pile to Pile Cap Connections
. Experimental study was carried out on three low confinement spun piles to pile cap connections. The detail followed the typically fixed connection in Indonesia. Reinforced concrete was filled to the spun pile to strengthen the connection region, except SPPC01. Different concrete types were used, shrinkage and non-shrinkage for SPPC02 and SPPC03, respectively. SPPC02 and SPPC03 could reach the targeted drift of 3.5% whereas SPPC01 was stopped at a drift of 2.75%. There was no shear failure detected during the test. The connection behaved as a fixed connection indicated by the fracture failure of the prestressed bars near the connection region. Analysis of the test results focused on displacement ductility. Two definitions of yield and ultimate displacement were employed to seek the possible ductility values. It varied from 3.05 to 6.04 for SPPC01 and from 3.01 to 4.95 for SPPC02 and SPPC03. The non-shrinkage concrete did not affect the strength of the connection but slightly improved the post-peak behavior. The ductility is 6 – 12% higher than spun piles with ordinary concrete. According to the limited ductility referring to ATC 96, JRA 2002, and AASHTO 2011, all specimens could achieve target ductility 3. Hence, it can be concluded that the low confinement spun pile connections performed well in displacement ductility.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Technology Management
International Journal of Technology Management 管理科学-工程:综合
CiteScore
2.70
自引率
3.60%
发文量
45
审稿时长
6-12 weeks
期刊介绍: The IJTM aims to provide a refereed and authoritative source of information in the field of managing with technology, and the management of engineering, science and technology. It seeks to establish channels of communication between government departments, technology executives in industry, commerce and related business, and academic experts in the field.
期刊最新文献
Study of Solid–Liquid Extraction Kinetics of Oil from Dried Avocado (Persea Americana) Flesh Using Hexane as A Solvent High-Bit-Rate Transmission in Visible Light Communication System Based on Adaptive Successive Interference Cancellation Technique Tobacco Extract for Inhibition of Carbon Steel Corrosion in H2S-contained NaCl Solution Role of Brand Trust in Private Label Adoption Model- an Affective and Trust-based Innovation Characteristic A Novel Hybrid Spotted Hyena Optimizer: An Algorithm for Fuel Consumption Capacitated Vehicle Routing Problem
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1