{"title":"地下细菌产生h2s并绊倒控制面板","authors":"T. Subramanian, Khaled M. Adel, I. A. Awadhi","doi":"10.2118/177798-PA","DOIUrl":null,"url":null,"abstract":"The building, having approximate dimensions of 42-m length, 9.7-m width, and 5.2-m height, is constructed of reinforced concrete walls and roof, and is designed to be blast resistant. There are four rooms in the building: the control room, which houses the instrumentation panels; the uninterrupted-power-supply (UPS) room, which houses the UPS equipment; the battery room; and the HVAC room. The panels in the equipment room are mounted on raised access flooring (false floor), having space for cables running underneath. The plan view of the building is shown in Fig. 1. The panels in this building tripped frequently, leading to unplanned plant outages, and thereby posing a risk to overall plant operations and integrity. It was observed that tripping of panels was mainly caused by failure of the electronic cards in the panels. Multiple cards had to be replaced, depending on the failure, and the rate of replacement was once in an approximately 1-month interval. Visual inspection of the cards did not indicate any defect. Site survey observations indicated a mild odor of H2S prevalent in the vicinity of the building and in areas under the false floor, discoloration of soil surrounding the building, high groundwater levels, and damages to building cable-entry sealants. To investigate the root cause and provide remedial measures, a technical study involving several testing techniques was carried out and the root cause was identified. Remedial measures were proposed to overcome the issue and were implemented at site. This paper presents the tests carried out during the study, the test results, and the recommended remedial measures and their implementation and effectiveness, which enabled mitigation of the failure of the control panels.","PeriodicalId":19446,"journal":{"name":"Oil and gas facilities","volume":"54 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2016-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Underground Bacteria Generates H 2 S and Trips Control Panels\",\"authors\":\"T. Subramanian, Khaled M. Adel, I. A. Awadhi\",\"doi\":\"10.2118/177798-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The building, having approximate dimensions of 42-m length, 9.7-m width, and 5.2-m height, is constructed of reinforced concrete walls and roof, and is designed to be blast resistant. There are four rooms in the building: the control room, which houses the instrumentation panels; the uninterrupted-power-supply (UPS) room, which houses the UPS equipment; the battery room; and the HVAC room. The panels in the equipment room are mounted on raised access flooring (false floor), having space for cables running underneath. The plan view of the building is shown in Fig. 1. The panels in this building tripped frequently, leading to unplanned plant outages, and thereby posing a risk to overall plant operations and integrity. It was observed that tripping of panels was mainly caused by failure of the electronic cards in the panels. Multiple cards had to be replaced, depending on the failure, and the rate of replacement was once in an approximately 1-month interval. Visual inspection of the cards did not indicate any defect. Site survey observations indicated a mild odor of H2S prevalent in the vicinity of the building and in areas under the false floor, discoloration of soil surrounding the building, high groundwater levels, and damages to building cable-entry sealants. To investigate the root cause and provide remedial measures, a technical study involving several testing techniques was carried out and the root cause was identified. Remedial measures were proposed to overcome the issue and were implemented at site. This paper presents the tests carried out during the study, the test results, and the recommended remedial measures and their implementation and effectiveness, which enabled mitigation of the failure of the control panels.\",\"PeriodicalId\":19446,\"journal\":{\"name\":\"Oil and gas facilities\",\"volume\":\"54 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Oil and gas facilities\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/177798-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Oil and gas facilities","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/177798-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

该建筑的尺寸约为42米长,9.7米宽,5.2米高,由钢筋混凝土墙和屋顶构成,并设计为防爆。大楼里有四个房间:控制室,里面放着仪表面板;UPS (uninterrupted power supply)机房,存放UPS设备;蓄电池室;和暖通空调房间。机房内的面板安装在架空通道地板(假地板)上,下方有空间供电缆运行。建筑平面视图如图1所示。该建筑的面板经常跳闸,导致工厂计划外停机,从而对整个工厂的运营和完整性构成风险。据观察,面板跳闸主要是由面板中的电子卡故障引起的。根据故障情况,必须更换多张卡片,更换频率大约为1个月一次。对卡片的目视检查没有发现任何缺陷。现场调查结果显示,建筑物附近和假地板下区域普遍存在轻微的H2S气味,建筑物周围土壤变色,地下水位高,建筑物电缆入口密封剂损坏。为了调查根本原因并提供补救措施,进行了一项涉及几种测试技术的技术研究,并确定了根本原因。为了克服这个问题,我们提出了补救措施,并在现场实施。本文介绍了在研究期间进行的测试、测试结果、建议的补救措施及其实施和有效性,从而减轻了控制面板的故障。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Underground Bacteria Generates H 2 S and Trips Control Panels
The building, having approximate dimensions of 42-m length, 9.7-m width, and 5.2-m height, is constructed of reinforced concrete walls and roof, and is designed to be blast resistant. There are four rooms in the building: the control room, which houses the instrumentation panels; the uninterrupted-power-supply (UPS) room, which houses the UPS equipment; the battery room; and the HVAC room. The panels in the equipment room are mounted on raised access flooring (false floor), having space for cables running underneath. The plan view of the building is shown in Fig. 1. The panels in this building tripped frequently, leading to unplanned plant outages, and thereby posing a risk to overall plant operations and integrity. It was observed that tripping of panels was mainly caused by failure of the electronic cards in the panels. Multiple cards had to be replaced, depending on the failure, and the rate of replacement was once in an approximately 1-month interval. Visual inspection of the cards did not indicate any defect. Site survey observations indicated a mild odor of H2S prevalent in the vicinity of the building and in areas under the false floor, discoloration of soil surrounding the building, high groundwater levels, and damages to building cable-entry sealants. To investigate the root cause and provide remedial measures, a technical study involving several testing techniques was carried out and the root cause was identified. Remedial measures were proposed to overcome the issue and were implemented at site. This paper presents the tests carried out during the study, the test results, and the recommended remedial measures and their implementation and effectiveness, which enabled mitigation of the failure of the control panels.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Odor-Treatment Technology for Recovered Hydrocarbons From Oily Waste in a Thermal-Desorption Unit Spatial Analysis of Horizontal-Shale-Well Water Production in the Wattenberg Field Ecological and Environmental Management During the Hail 3D Transition-Zone Survey: Safe Working Practices Within a UNESCO World-Biosphere Reserve Case History of Dehydration-Technology Improvement for HCPF Production in the Daqing Oil Field Thermal Regime Effect on Gas-Transport Lines in the Persian Gulf
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1