{"title":"配送设施中具有拣货任务的劳动力调度","authors":"Arpan Rijal, Marco Bijvank, A. Goel, R. Koster","doi":"10.1287/TRSC.2020.1029","DOIUrl":null,"url":null,"abstract":"Scheduling the availability of order pickers is crucial for effective operations in a distribution facility with manual order pickers. When order-picking activities can only be performed in specific time windows, it is essential to jointly solve the order picker shift scheduling problem and the order picker planning problem of assigning and sequencing individual orders to order pickers. This requires decisions regarding the number of order pickers to schedule, shift start and end times, break times, as well as the assignment and timing of order-picking activities. We call this the order picker scheduling problem and present two formulations. A branch-and-price algorithm and a metaheuristic are developed to solve the problem. Numerical experiments illustrate that the metaheuristic finds near-optimal solutions at 80% shorter computation times. A case study at the largest supermarket chain in The Netherlands shows the applicability of the solution approach in a real-life business application. In particular, different shift structures are analyzed, and it is concluded that the retailer can increase the minimum compensated duration for employed workers from six hours to seven or eight hours while reducing the average labor cost with up to 5% savings when a 15-minute flexibility is implemented in the scheduling of break times.","PeriodicalId":23247,"journal":{"name":"Transp. Sci.","volume":"57 1","pages":"725-746"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"Workforce Scheduling with Order-Picking Assignments in Distribution Facilities\",\"authors\":\"Arpan Rijal, Marco Bijvank, A. Goel, R. Koster\",\"doi\":\"10.1287/TRSC.2020.1029\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Scheduling the availability of order pickers is crucial for effective operations in a distribution facility with manual order pickers. When order-picking activities can only be performed in specific time windows, it is essential to jointly solve the order picker shift scheduling problem and the order picker planning problem of assigning and sequencing individual orders to order pickers. This requires decisions regarding the number of order pickers to schedule, shift start and end times, break times, as well as the assignment and timing of order-picking activities. We call this the order picker scheduling problem and present two formulations. A branch-and-price algorithm and a metaheuristic are developed to solve the problem. Numerical experiments illustrate that the metaheuristic finds near-optimal solutions at 80% shorter computation times. A case study at the largest supermarket chain in The Netherlands shows the applicability of the solution approach in a real-life business application. In particular, different shift structures are analyzed, and it is concluded that the retailer can increase the minimum compensated duration for employed workers from six hours to seven or eight hours while reducing the average labor cost with up to 5% savings when a 15-minute flexibility is implemented in the scheduling of break times.\",\"PeriodicalId\":23247,\"journal\":{\"name\":\"Transp. Sci.\",\"volume\":\"57 1\",\"pages\":\"725-746\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-03-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transp. Sci.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1287/TRSC.2020.1029\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transp. Sci.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1287/TRSC.2020.1029","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

摘要

安排订单选取器的可用性对于使用人工订单选取器的配送设施的有效操作至关重要。当拣货活动只能在特定的时间窗口内进行时,需要共同解决拣货人的班次调度问题和拣货人的计划问题,即将单个订单分配给拣货人并进行排序。这就需要决定要安排的拣单员的数量、轮班开始和结束时间、休息时间,以及拣单活动的分配和时间。我们称此为拣单调度问题,并给出两种表述。提出了分支定价算法和元启发式算法来解决这一问题。数值实验表明,元启发式算法以缩短80%的计算时间找到接近最优解。在荷兰最大的连锁超市进行的一个案例研究显示了该解决方案方法在实际业务应用程序中的适用性。特别是,对不同的轮班结构进行了分析,得出的结论是,当在休息时间调度中实施15分钟的灵活性时,零售商可以将受雇工人的最低补偿时间从6小时增加到7或8小时,同时降低平均劳动力成本,节省高达5%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Workforce Scheduling with Order-Picking Assignments in Distribution Facilities
Scheduling the availability of order pickers is crucial for effective operations in a distribution facility with manual order pickers. When order-picking activities can only be performed in specific time windows, it is essential to jointly solve the order picker shift scheduling problem and the order picker planning problem of assigning and sequencing individual orders to order pickers. This requires decisions regarding the number of order pickers to schedule, shift start and end times, break times, as well as the assignment and timing of order-picking activities. We call this the order picker scheduling problem and present two formulations. A branch-and-price algorithm and a metaheuristic are developed to solve the problem. Numerical experiments illustrate that the metaheuristic finds near-optimal solutions at 80% shorter computation times. A case study at the largest supermarket chain in The Netherlands shows the applicability of the solution approach in a real-life business application. In particular, different shift structures are analyzed, and it is concluded that the retailer can increase the minimum compensated duration for employed workers from six hours to seven or eight hours while reducing the average labor cost with up to 5% savings when a 15-minute flexibility is implemented in the scheduling of break times.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Effects of Air Quality on Housing Location: A Predictive Dynamic Continuum User-Optimal Approach Transportation in the Sharing Economy Scheduling Vehicles with Spatial Conflicts Differentiated Pricing of Shared Mobility Systems Considering Network Effects Using COVID-19 Data on Vaccine Shipments and Wastage to Inform Modeling and Decision-Making
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1