{"title":"Buzios领域的流量保证:主要挑战和实施解决方案","authors":"I. Noville, Milena da Silva Maciel, Anna Luiza de Moraes y blanco de Mattos, João Gabriel Carvalho de Siqueira","doi":"10.4043/31277-ms","DOIUrl":null,"url":null,"abstract":"\n This article's goal is to present some of the main flow assurance challenges faced by PETROBRAS in the Buzios oil field, from its early design stages to full operation, up to this day. These challenges include: hydrate formation in WAG (Water Alternating Gas) operations; reliability of the chemical injection system to prevent scale deposition; increasing GLR (Gas Liquid Ratio) management and operations with extremely high flowrates.\n Flow assurance experience amassed in Buzios and in other pre-salt oil fields, regarding all these presented issues, is particularly relevant for the development of future projects with similar characteristics, such as high liquid flow rate, high CO2 content and high scaling potential.","PeriodicalId":11072,"journal":{"name":"Day 1 Mon, August 16, 2021","volume":"45 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Flow Assurance in Buzios Field: Key Challenges and Implemented Solutions\",\"authors\":\"I. Noville, Milena da Silva Maciel, Anna Luiza de Moraes y blanco de Mattos, João Gabriel Carvalho de Siqueira\",\"doi\":\"10.4043/31277-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This article's goal is to present some of the main flow assurance challenges faced by PETROBRAS in the Buzios oil field, from its early design stages to full operation, up to this day. These challenges include: hydrate formation in WAG (Water Alternating Gas) operations; reliability of the chemical injection system to prevent scale deposition; increasing GLR (Gas Liquid Ratio) management and operations with extremely high flowrates.\\n Flow assurance experience amassed in Buzios and in other pre-salt oil fields, regarding all these presented issues, is particularly relevant for the development of future projects with similar characteristics, such as high liquid flow rate, high CO2 content and high scaling potential.\",\"PeriodicalId\":11072,\"journal\":{\"name\":\"Day 1 Mon, August 16, 2021\",\"volume\":\"45 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Mon, August 16, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31277-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, August 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31277-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Flow Assurance in Buzios Field: Key Challenges and Implemented Solutions
This article's goal is to present some of the main flow assurance challenges faced by PETROBRAS in the Buzios oil field, from its early design stages to full operation, up to this day. These challenges include: hydrate formation in WAG (Water Alternating Gas) operations; reliability of the chemical injection system to prevent scale deposition; increasing GLR (Gas Liquid Ratio) management and operations with extremely high flowrates.
Flow assurance experience amassed in Buzios and in other pre-salt oil fields, regarding all these presented issues, is particularly relevant for the development of future projects with similar characteristics, such as high liquid flow rate, high CO2 content and high scaling potential.