{"title":"Buzios领域的流量保证:主要挑战和实施解决方案","authors":"I. Noville, Milena da Silva Maciel, Anna Luiza de Moraes y blanco de Mattos, João Gabriel Carvalho de Siqueira","doi":"10.4043/31277-ms","DOIUrl":null,"url":null,"abstract":"\n This article's goal is to present some of the main flow assurance challenges faced by PETROBRAS in the Buzios oil field, from its early design stages to full operation, up to this day. These challenges include: hydrate formation in WAG (Water Alternating Gas) operations; reliability of the chemical injection system to prevent scale deposition; increasing GLR (Gas Liquid Ratio) management and operations with extremely high flowrates.\n Flow assurance experience amassed in Buzios and in other pre-salt oil fields, regarding all these presented issues, is particularly relevant for the development of future projects with similar characteristics, such as high liquid flow rate, high CO2 content and high scaling potential.","PeriodicalId":11072,"journal":{"name":"Day 1 Mon, August 16, 2021","volume":"45 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Flow Assurance in Buzios Field: Key Challenges and Implemented Solutions\",\"authors\":\"I. Noville, Milena da Silva Maciel, Anna Luiza de Moraes y blanco de Mattos, João Gabriel Carvalho de Siqueira\",\"doi\":\"10.4043/31277-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This article's goal is to present some of the main flow assurance challenges faced by PETROBRAS in the Buzios oil field, from its early design stages to full operation, up to this day. These challenges include: hydrate formation in WAG (Water Alternating Gas) operations; reliability of the chemical injection system to prevent scale deposition; increasing GLR (Gas Liquid Ratio) management and operations with extremely high flowrates.\\n Flow assurance experience amassed in Buzios and in other pre-salt oil fields, regarding all these presented issues, is particularly relevant for the development of future projects with similar characteristics, such as high liquid flow rate, high CO2 content and high scaling potential.\",\"PeriodicalId\":11072,\"journal\":{\"name\":\"Day 1 Mon, August 16, 2021\",\"volume\":\"45 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Mon, August 16, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31277-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, August 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31277-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

本文的目的是介绍巴西石油公司在Buzios油田从早期设计阶段到全面投产至今所面临的一些主要流动保障挑战。这些挑战包括:WAG(水交替气)作业中的水合物形成;注化学剂系统防止结垢的可靠性;提高了GLR(气液比)的管理和极高流量的操作。在Buzios和其他盐下油田积累的流动保障经验,对于所有这些问题,对于具有类似特征的未来项目的开发,如高液体流量、高二氧化碳含量和高结垢潜力,具有特别重要的意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Flow Assurance in Buzios Field: Key Challenges and Implemented Solutions
This article's goal is to present some of the main flow assurance challenges faced by PETROBRAS in the Buzios oil field, from its early design stages to full operation, up to this day. These challenges include: hydrate formation in WAG (Water Alternating Gas) operations; reliability of the chemical injection system to prevent scale deposition; increasing GLR (Gas Liquid Ratio) management and operations with extremely high flowrates. Flow assurance experience amassed in Buzios and in other pre-salt oil fields, regarding all these presented issues, is particularly relevant for the development of future projects with similar characteristics, such as high liquid flow rate, high CO2 content and high scaling potential.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Drilling Fluids Project Engineering Guidance and Most Common Fluids Related Challenges for Deepwater and HPHT Offshore Wells Empirical Design of Optimum Frequency of Well Testing for Deepwater Operation Sustaining Oil and Gas Fields by Using Multiphase Gas Compression to Increase Production and Reserves, and Lower Operating Costs and Environmental Emissions Footprint Structural Digital Twin of FPSO for Monitoring the Hull and Topsides Based on Inspection Data and Load Measurement Application of LWD Multipole Sonic for Quantitative Cement Evaluation – Well Integrity in the Norwegian Continental Shelf
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1