{"title":"基于原子搜索优化的径向配电网和网状配电网电压分布优化","authors":"Gunjesh Tahiliani, A. Gupta","doi":"10.4314/ijest.v14i3.13s","DOIUrl":null,"url":null,"abstract":"Recent years have seen a considerable increase in the generation of power using renewable energy sources. This paper deals with the allocation of distributed generations (DG) in radial as well as mesh distribution network (RDSm&MDSm, respectively). The allocation of DG is been done through a meta-heuristic technique known as Atom Search Optimisation. In the paper, the power loss is reduced, along with simultaneous improvement of voltage profile of the system. The proposed algorithm has been tested on IEEE 33 & 69 radial and weakly meshed system with 5 tie lines is considered for power loss minimisation using single and multiple DGs. Two power factors are considered for the simulation 0.8 lag and 0.9 pf lag. The simulation results are carried out in MATLAB.","PeriodicalId":14145,"journal":{"name":"International journal of engineering science and technology","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Voltage Profile improvement by optimal DG allocation using atom search optimisation in radial and mesh distribution system\",\"authors\":\"Gunjesh Tahiliani, A. Gupta\",\"doi\":\"10.4314/ijest.v14i3.13s\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Recent years have seen a considerable increase in the generation of power using renewable energy sources. This paper deals with the allocation of distributed generations (DG) in radial as well as mesh distribution network (RDSm&MDSm, respectively). The allocation of DG is been done through a meta-heuristic technique known as Atom Search Optimisation. In the paper, the power loss is reduced, along with simultaneous improvement of voltage profile of the system. The proposed algorithm has been tested on IEEE 33 & 69 radial and weakly meshed system with 5 tie lines is considered for power loss minimisation using single and multiple DGs. Two power factors are considered for the simulation 0.8 lag and 0.9 pf lag. The simulation results are carried out in MATLAB.\",\"PeriodicalId\":14145,\"journal\":{\"name\":\"International journal of engineering science and technology\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International journal of engineering science and technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4314/ijest.v14i3.13s\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International journal of engineering science and technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4314/ijest.v14i3.13s","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Voltage Profile improvement by optimal DG allocation using atom search optimisation in radial and mesh distribution system
Recent years have seen a considerable increase in the generation of power using renewable energy sources. This paper deals with the allocation of distributed generations (DG) in radial as well as mesh distribution network (RDSm&MDSm, respectively). The allocation of DG is been done through a meta-heuristic technique known as Atom Search Optimisation. In the paper, the power loss is reduced, along with simultaneous improvement of voltage profile of the system. The proposed algorithm has been tested on IEEE 33 & 69 radial and weakly meshed system with 5 tie lines is considered for power loss minimisation using single and multiple DGs. Two power factors are considered for the simulation 0.8 lag and 0.9 pf lag. The simulation results are carried out in MATLAB.