{"title":"项目特定的AUT自动超声波测试验证,以确定管道环焊缝ECA验收标准的高度尺寸精度。","authors":"Dinesh Putsherry, D. Misra","doi":"10.2118/193170-MS","DOIUrl":null,"url":null,"abstract":"\n Objective of project specific AUT (Automated Ultrasonic Testing using Zonal Discrimination) Procedure validation is to verify that the implementation of pre-qualified AUT system performance for the inspection of project specific Pipeline girth welds without changing any essential parameter of system qualification processes.\n As per the requirement of DNV-OS-F101, the purpose of the project specific AUT validation is not to perform any new PoD (Probability of detection) analysis. However, to verify the reliability aspects of the system in terms of HSA (height sizing accuracy) to meet the AUT system qualification requirement is to ascertain the project specific AUT procedure adequately capable of detecting and sizing of the smallest critical defects. This is achieved through a detailed validation programme using the project specific welding procedure and pipe material representing actual pipelay scenario.","PeriodicalId":11079,"journal":{"name":"Day 4 Thu, November 15, 2018","volume":"58 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Project Specific AUT Automatic Ultrasonic Testing Validation to Determine Height Sizing Accuracy for Pipeline Girth Weld ECA Acceptance Criteria.\",\"authors\":\"Dinesh Putsherry, D. Misra\",\"doi\":\"10.2118/193170-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Objective of project specific AUT (Automated Ultrasonic Testing using Zonal Discrimination) Procedure validation is to verify that the implementation of pre-qualified AUT system performance for the inspection of project specific Pipeline girth welds without changing any essential parameter of system qualification processes.\\n As per the requirement of DNV-OS-F101, the purpose of the project specific AUT validation is not to perform any new PoD (Probability of detection) analysis. However, to verify the reliability aspects of the system in terms of HSA (height sizing accuracy) to meet the AUT system qualification requirement is to ascertain the project specific AUT procedure adequately capable of detecting and sizing of the smallest critical defects. This is achieved through a detailed validation programme using the project specific welding procedure and pipe material representing actual pipelay scenario.\",\"PeriodicalId\":11079,\"journal\":{\"name\":\"Day 4 Thu, November 15, 2018\",\"volume\":\"58 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, November 15, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/193170-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, November 15, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193170-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Project Specific AUT Automatic Ultrasonic Testing Validation to Determine Height Sizing Accuracy for Pipeline Girth Weld ECA Acceptance Criteria.
Objective of project specific AUT (Automated Ultrasonic Testing using Zonal Discrimination) Procedure validation is to verify that the implementation of pre-qualified AUT system performance for the inspection of project specific Pipeline girth welds without changing any essential parameter of system qualification processes.
As per the requirement of DNV-OS-F101, the purpose of the project specific AUT validation is not to perform any new PoD (Probability of detection) analysis. However, to verify the reliability aspects of the system in terms of HSA (height sizing accuracy) to meet the AUT system qualification requirement is to ascertain the project specific AUT procedure adequately capable of detecting and sizing of the smallest critical defects. This is achieved through a detailed validation programme using the project specific welding procedure and pipe material representing actual pipelay scenario.