{"title":"列宁格勒核电站1、2号机组退役后加力燃烧的计算模拟","authors":"Yu. A. Alimov, N. Galeyeva, A. Zhirnov, P. Kuznetsov, I. Rozhdestvenskiy","doi":"10.55176/2414-1038-2020-3-68-71","DOIUrl":null,"url":null,"abstract":"The RBMK-1000 reactor operates in a continuous refueling mode. The reactor core comprises FAs across the burn-up spectrum, from fresh fuel assemblies to the most burnt-up ones. Following the reactor shutdown for decommissioning, the majority of irradiated fuel assemblies (IFA) have the potential for further use (the so-called afterburning) at operating NPP units. Most of the irradiated fuel assemblies have a burn-up fraction, which is far from the specified threshold value. The neutron multiplication factor in the cell exceeds the core average value and, therefore, the IFA loading makes it possible to increase the reactivity margin to the desired value. Reuse of spent fuel assemblies in reactors at other power units offers a number of advantages. In economic terms, afterburning is able to reduce the use of fresh fuel assemblies (FFA). In terms of radioactive waste handling, afterburning is able to reduce the number of irradiated fuel assemblies, which require long-time storage in a spent nuclear fuel repository thus reducing the IFA and radioactive waste disposal loads. JSC NIKIET has proposed the use of irradiated fuel assemblies from units 1 and 2 of Leningrad NPP shut down after decommissioning in reactors at units 3 and 4 of the same NPP.","PeriodicalId":20426,"journal":{"name":"PROBLEMS OF ATOMIC SCIENCE AND TECHNOLOGY. SERIES: NUCLEAR AND REACTOR CONSTANTS","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"COMPUTATIONAL SIMULATION OF POST-DECOMMISSIONING AFTERBURNING OF FAS FROM UNITS 1 AND 2 OF LENINGRAD NPP\",\"authors\":\"Yu. A. Alimov, N. Galeyeva, A. Zhirnov, P. Kuznetsov, I. Rozhdestvenskiy\",\"doi\":\"10.55176/2414-1038-2020-3-68-71\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The RBMK-1000 reactor operates in a continuous refueling mode. The reactor core comprises FAs across the burn-up spectrum, from fresh fuel assemblies to the most burnt-up ones. Following the reactor shutdown for decommissioning, the majority of irradiated fuel assemblies (IFA) have the potential for further use (the so-called afterburning) at operating NPP units. Most of the irradiated fuel assemblies have a burn-up fraction, which is far from the specified threshold value. The neutron multiplication factor in the cell exceeds the core average value and, therefore, the IFA loading makes it possible to increase the reactivity margin to the desired value. Reuse of spent fuel assemblies in reactors at other power units offers a number of advantages. In economic terms, afterburning is able to reduce the use of fresh fuel assemblies (FFA). In terms of radioactive waste handling, afterburning is able to reduce the number of irradiated fuel assemblies, which require long-time storage in a spent nuclear fuel repository thus reducing the IFA and radioactive waste disposal loads. JSC NIKIET has proposed the use of irradiated fuel assemblies from units 1 and 2 of Leningrad NPP shut down after decommissioning in reactors at units 3 and 4 of the same NPP.\",\"PeriodicalId\":20426,\"journal\":{\"name\":\"PROBLEMS OF ATOMIC SCIENCE AND TECHNOLOGY. SERIES: NUCLEAR AND REACTOR CONSTANTS\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PROBLEMS OF ATOMIC SCIENCE AND TECHNOLOGY. SERIES: NUCLEAR AND REACTOR CONSTANTS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55176/2414-1038-2020-3-68-71\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PROBLEMS OF ATOMIC SCIENCE AND TECHNOLOGY. SERIES: NUCLEAR AND REACTOR CONSTANTS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55176/2414-1038-2020-3-68-71","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

RBMK-1000反应堆在连续换料模式下运行。反应堆堆芯由从新鲜燃料组件到最燃尽燃料组件的各种燃料组成。在反应堆关闭退役后,大多数辐照燃料组件(IFA)在运行中的核电站机组中有进一步使用的潜力(所谓的加力燃烧)。大多数辐照燃料组件都有燃耗分数,燃耗分数远低于规定的阈值。电池中的中子倍增系数超过堆芯平均值,因此,IFA负载使得将反应性裕度提高到所需值成为可能。在其他动力装置的反应堆中重复使用乏燃料组件有许多优点。在经济方面,加力燃烧能够减少新燃料组件(FFA)的使用。在放射性废物处理方面,加力燃烧能够减少辐照燃料组件的数量,这些组件需要在乏核燃料储存库中长期储存,从而减少了放射性废物处理负荷。JSC NIKIET提议使用列宁格勒核电站3号和4号反应堆退役后关闭的1号和2号机组的辐照燃料组件。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
COMPUTATIONAL SIMULATION OF POST-DECOMMISSIONING AFTERBURNING OF FAS FROM UNITS 1 AND 2 OF LENINGRAD NPP
The RBMK-1000 reactor operates in a continuous refueling mode. The reactor core comprises FAs across the burn-up spectrum, from fresh fuel assemblies to the most burnt-up ones. Following the reactor shutdown for decommissioning, the majority of irradiated fuel assemblies (IFA) have the potential for further use (the so-called afterburning) at operating NPP units. Most of the irradiated fuel assemblies have a burn-up fraction, which is far from the specified threshold value. The neutron multiplication factor in the cell exceeds the core average value and, therefore, the IFA loading makes it possible to increase the reactivity margin to the desired value. Reuse of spent fuel assemblies in reactors at other power units offers a number of advantages. In economic terms, afterburning is able to reduce the use of fresh fuel assemblies (FFA). In terms of radioactive waste handling, afterburning is able to reduce the number of irradiated fuel assemblies, which require long-time storage in a spent nuclear fuel repository thus reducing the IFA and radioactive waste disposal loads. JSC NIKIET has proposed the use of irradiated fuel assemblies from units 1 and 2 of Leningrad NPP shut down after decommissioning in reactors at units 3 and 4 of the same NPP.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
POSSIBILITY OF APPLICATION OF ZrO2-MgO-CaO CRUCIBLES FOR PRODUCING ALLOY U-10 % Zr CALCULATION ESTIMATION OF THE REQUIRED HEAT GENERATION IN TESTING FUEL ELEMENTS TO ACHIEVE SUPERCRITICAL PARAMETERS OF THE COOLANT UNDER IRRADIATION IN THE RESEARCH NUCLEAR REACTOR FEATURES OF THERMAL HYDRAULICS OF ACTIVE ZONES OF FAST LOW-POWER AND HIGH-POWER SODIUM PRODUCTION REACTORS FOR A CLOSED FUEL CYCLE SYSTEM CALCULATION OF THE STRUCTURAL MATERIALS ACTIVATION BY A FUSION NEUTRON FLUX WITH BPSD CODE HEAT PIPES IN NUCLEAR ENGINEERING
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1