阿联酋首个基于端到端标准化工作流程的大型天然气生产资产数字化转型:经验教训和未来发展方向

A. Alsaeedi, M. Elabrashy, M. Alzeyoudi, M. Albadi, Sandeep Soni, Jose Isambertt, Deepak Tripathi
{"title":"阿联酋首个基于端到端标准化工作流程的大型天然气生产资产数字化转型:经验教训和未来发展方向","authors":"A. Alsaeedi, M. Elabrashy, M. Alzeyoudi, M. Albadi, Sandeep Soni, Jose Isambertt, Deepak Tripathi","doi":"10.2118/205851-ms","DOIUrl":null,"url":null,"abstract":"\n The concept of integrated modeling and digital transformation has grown within the oil and gas industry over the past decade and every such digital transformation has its own set of challenges from which significant learnings can be derived to enhance the knowledge base of the industry. This paper encompasses the successful achievement journey from the UAE's first end to end standardized workflow- based digital transformation in a giant gas producing asset, where several key challenges and learnings have been summarized that are originated from a unique project for a giant gas-condensate asset.\n The role and importance from multiple business stakeholders such as the planning, engineering, operations and performance teams was imperative to establish a collaborative working philosophy and a detailed specification document, the end-to-end solution, functional and non-functional requirements were captured and aligned with end-user needs.\n Firstly, a detailed offline phase along with focused efforts in understanding data-quality and establishing representative base-models, was key to enhance the benefit-realization of the integrated platform. Secondly, the online implementation helped in achieving significant process efficiency improvement as inbuilt data validation features significantly improved the confidence of the output.\n The diagnostic workflows replaced the conventional spreadsheet-based approach. The digital platform works as a common reference of \"truth\" for everyone across the organization. It helped to produce several the business KPIs to assist the engineers in emphasizing on the problem area, such as improved well test planning.","PeriodicalId":10928,"journal":{"name":"Day 2 Wed, September 22, 2021","volume":"11 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"UAE's First End to End Standardized Workflow-Based Digital Transformation in a Giant Gas Producing Asset - Lessons Learned and Way Forward\",\"authors\":\"A. Alsaeedi, M. Elabrashy, M. Alzeyoudi, M. Albadi, Sandeep Soni, Jose Isambertt, Deepak Tripathi\",\"doi\":\"10.2118/205851-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The concept of integrated modeling and digital transformation has grown within the oil and gas industry over the past decade and every such digital transformation has its own set of challenges from which significant learnings can be derived to enhance the knowledge base of the industry. This paper encompasses the successful achievement journey from the UAE's first end to end standardized workflow- based digital transformation in a giant gas producing asset, where several key challenges and learnings have been summarized that are originated from a unique project for a giant gas-condensate asset.\\n The role and importance from multiple business stakeholders such as the planning, engineering, operations and performance teams was imperative to establish a collaborative working philosophy and a detailed specification document, the end-to-end solution, functional and non-functional requirements were captured and aligned with end-user needs.\\n Firstly, a detailed offline phase along with focused efforts in understanding data-quality and establishing representative base-models, was key to enhance the benefit-realization of the integrated platform. Secondly, the online implementation helped in achieving significant process efficiency improvement as inbuilt data validation features significantly improved the confidence of the output.\\n The diagnostic workflows replaced the conventional spreadsheet-based approach. The digital platform works as a common reference of \\\"truth\\\" for everyone across the organization. It helped to produce several the business KPIs to assist the engineers in emphasizing on the problem area, such as improved well test planning.\",\"PeriodicalId\":10928,\"journal\":{\"name\":\"Day 2 Wed, September 22, 2021\",\"volume\":\"11 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, September 22, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/205851-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, September 22, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/205851-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在过去的十年中,集成建模和数字化转型的概念在石油和天然气行业得到了发展,每一次这样的数字化转型都有自己的一系列挑战,从中可以获得重要的学习经验,以增强行业的知识基础。本文涵盖了阿联酋在大型天然气生产资产中第一次基于端到端标准化工作流程的数字化转型的成功成就之旅,其中总结了来自大型凝析气资产独特项目的几个关键挑战和经验。来自多个业务涉众(如计划、工程、运营和性能团队)的角色和重要性对于建立协作工作理念和详细的规范文档、端到端解决方案、功能性和非功能性需求被捕获并与最终用户需求保持一致是必不可少的。首先,细化线下阶段,重点了解数据质量,建立具有代表性的基础模型,是提高综合平台效益实现的关键。其次,在线实施有助于实现显着的流程效率改进,因为内置的数据验证功能显着提高了输出的置信度。诊断工作流程取代了传统的基于电子表格的方法。数字平台作为整个组织中每个人的“真相”的共同参考。它帮助生成了几个业务kpi,以帮助工程师强调问题领域,例如改进试井计划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
UAE's First End to End Standardized Workflow-Based Digital Transformation in a Giant Gas Producing Asset - Lessons Learned and Way Forward
The concept of integrated modeling and digital transformation has grown within the oil and gas industry over the past decade and every such digital transformation has its own set of challenges from which significant learnings can be derived to enhance the knowledge base of the industry. This paper encompasses the successful achievement journey from the UAE's first end to end standardized workflow- based digital transformation in a giant gas producing asset, where several key challenges and learnings have been summarized that are originated from a unique project for a giant gas-condensate asset. The role and importance from multiple business stakeholders such as the planning, engineering, operations and performance teams was imperative to establish a collaborative working philosophy and a detailed specification document, the end-to-end solution, functional and non-functional requirements were captured and aligned with end-user needs. Firstly, a detailed offline phase along with focused efforts in understanding data-quality and establishing representative base-models, was key to enhance the benefit-realization of the integrated platform. Secondly, the online implementation helped in achieving significant process efficiency improvement as inbuilt data validation features significantly improved the confidence of the output. The diagnostic workflows replaced the conventional spreadsheet-based approach. The digital platform works as a common reference of "truth" for everyone across the organization. It helped to produce several the business KPIs to assist the engineers in emphasizing on the problem area, such as improved well test planning.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Dynamics of Wettability Alteration from Alkali/Nanoparticles/Polymer Flooding - Integrating Data of Imbibition, Contact Angle and Interfacial-Tension to Screen Injection Agents Benchmarking and Field-Testing of the Distributed Quasi-Newton Derivative-Free Optimization Method for Field Development Optimization Aplicability of an Innovative and Light Seismic Approach to Monitor SAGD Operations in Surmont: A Blind Test Four Simple Questions: Decision-Centered Risk and Project Management Gas Migration in Wellbores During Pressurized Mud Cap Drilling PMCD
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1