利用自主流量控制装置提高高粘度油开发效率。西西伯利亚案例研究。

T. Solovyev
{"title":"利用自主流量控制装置提高高粘度油开发效率。西西伯利亚案例研究。","authors":"T. Solovyev","doi":"10.2118/196851-ms","DOIUrl":null,"url":null,"abstract":"\n Most of the new fields in Western Siberia have unfavorable conditions for the development of the field, such as the presence of an extensive gas cap, the low power of oil-saturated oil rim thicknesses, and the underlying water. The field is also characterized by weakly consolidated sandstone and high-viscosity oil. For the deposition of an early breakthrough of water or gas into the wellbore, it was decided to conduct a pilot stage of project on the use of various types of completion (autonomous inflow control devices), which allow controlling the inflow along the wellbore. Formation of completion strategy requires continuous monitoring of wells, evaluation of the effectiveness of cleaning intervals after drilling, interval flow along the wellbore, as well as the detection of water or gas breakthrough areas to identify the ineffective placement of AFCD.\n This article presents the results of the use of autonomous flow control devices, an assessment of their effectiveness according to PLT and well logs interpretation and intellectual tracers, as well as analytical methods.\n The article also describes general information about the inflow control devices technology, their characteristics and problems that the operators user may encounter when using one or another element of high-tech completion, gives reasons for the use of autonomous inflow control devices at the considered development object.\n Analysis of field data and PLT and well logs results revealed that the devices actually work and help to limit water and gas compared to wells that are equipped only with wire filters without inflow control, and also begin to form a unified strategy and concept of well completion based on the data\n The results of the work show that currently the use of AFCD for the project is favorable, and the completion of wells without flow control in these conditions is impractical.","PeriodicalId":10977,"journal":{"name":"Day 2 Wed, October 23, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-10-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Enhancing Efficiency of High-Viscosity Oil Development with Using Autonomous Flow Control Devices. Case Study in Western Siberia.\",\"authors\":\"T. Solovyev\",\"doi\":\"10.2118/196851-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Most of the new fields in Western Siberia have unfavorable conditions for the development of the field, such as the presence of an extensive gas cap, the low power of oil-saturated oil rim thicknesses, and the underlying water. The field is also characterized by weakly consolidated sandstone and high-viscosity oil. For the deposition of an early breakthrough of water or gas into the wellbore, it was decided to conduct a pilot stage of project on the use of various types of completion (autonomous inflow control devices), which allow controlling the inflow along the wellbore. Formation of completion strategy requires continuous monitoring of wells, evaluation of the effectiveness of cleaning intervals after drilling, interval flow along the wellbore, as well as the detection of water or gas breakthrough areas to identify the ineffective placement of AFCD.\\n This article presents the results of the use of autonomous flow control devices, an assessment of their effectiveness according to PLT and well logs interpretation and intellectual tracers, as well as analytical methods.\\n The article also describes general information about the inflow control devices technology, their characteristics and problems that the operators user may encounter when using one or another element of high-tech completion, gives reasons for the use of autonomous inflow control devices at the considered development object.\\n Analysis of field data and PLT and well logs results revealed that the devices actually work and help to limit water and gas compared to wells that are equipped only with wire filters without inflow control, and also begin to form a unified strategy and concept of well completion based on the data\\n The results of the work show that currently the use of AFCD for the project is favorable, and the completion of wells without flow control in these conditions is impractical.\",\"PeriodicalId\":10977,\"journal\":{\"name\":\"Day 2 Wed, October 23, 2019\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, October 23, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/196851-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, October 23, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/196851-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

西西伯利亚大部分新油田的开发条件都比较不利,例如存在大面积的气顶,油饱和油环厚度的低功率,以及下面的水。该油田还具有弱胶结砂岩和高粘度油的特点。为了防止水或气体在井筒中形成早期突破,决定在项目的试点阶段使用各种类型的完井装置(自主流入控制装置),这些装置可以控制沿井筒的流入。完井策略的制定需要对井进行持续监测,评估钻井后清洗段的有效性,井段沿井筒的流动情况,以及检测水或气的突破区域,以确定AFCD的无效放置。本文介绍了自主流量控制装置的使用结果,根据PLT和测井解释、智能示踪剂以及分析方法对其有效性进行了评估。本文还介绍了流入控制装置技术的一般信息,它们的特点以及操作人员在使用高科技完井元件时可能遇到的问题,并给出了在考虑的开发对象上使用自主流入控制装置的原因。分析现场数据和PLT测井结果表明设备实际工作和帮助限制水和天然气井相比,只装备线过滤器没有流入控制,并开始形成一个统一的策略和概念基于数据的完井工作的结果表明,目前使用的渔护署项目优惠,和完成井没有流控制在这些条件是不切实际的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Enhancing Efficiency of High-Viscosity Oil Development with Using Autonomous Flow Control Devices. Case Study in Western Siberia.
Most of the new fields in Western Siberia have unfavorable conditions for the development of the field, such as the presence of an extensive gas cap, the low power of oil-saturated oil rim thicknesses, and the underlying water. The field is also characterized by weakly consolidated sandstone and high-viscosity oil. For the deposition of an early breakthrough of water or gas into the wellbore, it was decided to conduct a pilot stage of project on the use of various types of completion (autonomous inflow control devices), which allow controlling the inflow along the wellbore. Formation of completion strategy requires continuous monitoring of wells, evaluation of the effectiveness of cleaning intervals after drilling, interval flow along the wellbore, as well as the detection of water or gas breakthrough areas to identify the ineffective placement of AFCD. This article presents the results of the use of autonomous flow control devices, an assessment of their effectiveness according to PLT and well logs interpretation and intellectual tracers, as well as analytical methods. The article also describes general information about the inflow control devices technology, their characteristics and problems that the operators user may encounter when using one or another element of high-tech completion, gives reasons for the use of autonomous inflow control devices at the considered development object. Analysis of field data and PLT and well logs results revealed that the devices actually work and help to limit water and gas compared to wells that are equipped only with wire filters without inflow control, and also begin to form a unified strategy and concept of well completion based on the data The results of the work show that currently the use of AFCD for the project is favorable, and the completion of wells without flow control in these conditions is impractical.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Practical Application of the Fluorescent Microspheres Method Technology in Horizontal Wells of the Upper Salym Oil Field: Efficiency of the Method, Technology and Approach Evolution of Horizontal Wells Production Logging Using Markers Successful Implementation of Managed Pressure Drilling Technology Under the Conditions of Catastrophic Mud Losses in the Kuyumbinskoe Field Completion Design Optimization for Unconventional Wells Using Large Scale Computational Science Assessing Efficiency of Multiwell Retrospective Testing MRT in Analysis of Cross-Well Interference and Prediction of Formation and Bottom- Hole Pressure Dynamics
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1