{"title":"将客户中断成本整合到中断管理系统中","authors":"Josh A. Schellenberg, Barney Speckman, J. Eto","doi":"10.1109/TDC.2016.7519888","DOIUrl":null,"url":null,"abstract":"Utilities have increasingly been applying customer interruption costs to reliability and resiliency planning, using tools such as the Interruption Cost Estimate (ICE) Calculator. Furthermore, applications of value-based reliability planning can be found in the industry and academic literature for generation, transmission and distribution planning and at the federal policy-making level. With the wealth of guidance documentation and planning examples that is now available, the utility industry is positioned to further expand upon the application of value-based reliability planning by integrating customer interruption costs into outage management systems (OMS) and their associated business processes. This paper summarizes how (and why) to integrate customer interruption costs into OMS and discusses how utilities can act on customer interruption cost information to provide more value to customers.","PeriodicalId":6497,"journal":{"name":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"53 1","pages":"1-4"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrating customer interruption costs into outage management systems\",\"authors\":\"Josh A. Schellenberg, Barney Speckman, J. Eto\",\"doi\":\"10.1109/TDC.2016.7519888\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Utilities have increasingly been applying customer interruption costs to reliability and resiliency planning, using tools such as the Interruption Cost Estimate (ICE) Calculator. Furthermore, applications of value-based reliability planning can be found in the industry and academic literature for generation, transmission and distribution planning and at the federal policy-making level. With the wealth of guidance documentation and planning examples that is now available, the utility industry is positioned to further expand upon the application of value-based reliability planning by integrating customer interruption costs into outage management systems (OMS) and their associated business processes. This paper summarizes how (and why) to integrate customer interruption costs into OMS and discusses how utilities can act on customer interruption cost information to provide more value to customers.\",\"PeriodicalId\":6497,\"journal\":{\"name\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"volume\":\"53 1\",\"pages\":\"1-4\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2016.7519888\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2016.7519888","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

公用事业公司越来越多地使用中断成本估算(ICE)计算器等工具,将客户中断成本应用到可靠性和弹性规划中。此外,基于价值的可靠性规划的应用可以在工业和学术文献中找到,用于发电,输电和配电规划以及联邦政策制定层面。现在有了丰富的指导文档和规划示例,公用事业行业可以通过将客户中断成本集成到中断管理系统(OMS)及其相关业务流程中,进一步扩展基于价值的可靠性规划的应用。本文总结了如何(以及为什么)将客户中断成本集成到OMS中,并讨论了公用事业如何根据客户中断成本信息采取行动,为客户提供更多价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Integrating customer interruption costs into outage management systems
Utilities have increasingly been applying customer interruption costs to reliability and resiliency planning, using tools such as the Interruption Cost Estimate (ICE) Calculator. Furthermore, applications of value-based reliability planning can be found in the industry and academic literature for generation, transmission and distribution planning and at the federal policy-making level. With the wealth of guidance documentation and planning examples that is now available, the utility industry is positioned to further expand upon the application of value-based reliability planning by integrating customer interruption costs into outage management systems (OMS) and their associated business processes. This paper summarizes how (and why) to integrate customer interruption costs into OMS and discusses how utilities can act on customer interruption cost information to provide more value to customers.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fast evaluation of probabilistic total transfer capability considering multiple wind farms An automated model based fault locating method for distribution systems Fault location identification of a hybrid HVDC-VSC system containing cable and overhead line segments using transient data Conductor corrosion inspection of aluminum conductor steel reinforced transmission lines Microgrid load management and control strategies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1