{"title":"电力部门产能规划中政策不确定性的成本:对工具选择的影响","authors":"B. Leibowicz","doi":"10.1016/J.TEJ.2017.12.001","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":22425,"journal":{"name":"The Electricity Journal","volume":"8 1","pages":"33-41"},"PeriodicalIF":0.0000,"publicationDate":"2017-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"15","resultStr":"{\"title\":\"The cost of policy uncertainty in electric sector capacity planning: Implications for instrument choice\",\"authors\":\"B. Leibowicz\",\"doi\":\"10.1016/J.TEJ.2017.12.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":22425,\"journal\":{\"name\":\"The Electricity Journal\",\"volume\":\"8 1\",\"pages\":\"33-41\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"15\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Electricity Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1016/J.TEJ.2017.12.001\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Electricity Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1016/J.TEJ.2017.12.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 15