提高13E21 PT燃气轮机可靠性的预充模式优化[j]

Endrik Purbo Yunastyo, D. Yulianto, A. Hidayat, K. Gunawan, T. R. Biyanto
{"title":"提高13E21 PT燃气轮机可靠性的预充模式优化[j]","authors":"Endrik Purbo Yunastyo, D. Yulianto, A. Hidayat, K. Gunawan, T. R. Biyanto","doi":"10.9790/1684-1403071318","DOIUrl":null,"url":null,"abstract":"Muara Tawar block V is constructed by PT. PLN (Persero) Power Plant Master Project of Java, Bali and Nusa Tenggara Networks based on contract No. 261. PJ / 041 / DIR / 2007 (Concerning Gas Fired Power Plant Extension Project). The plant use gas turbine type 13E2. Operational concept of gas turbine type 13E2 is regulating the amount of fuel that is divided from three fuel control valves and the operating pattern is in an area known as the pilot valve and premix valve which must be maintained stability of combustion shown by pulsation parameters. The prefill concept is used to avoid flame off when gas turbine loading often passes over point switch or back point switch. Prefill itself will momentary activate a pilot valve to fill the Fuel Distribution System (FDS) line from MBP43. However, prefill gives effect of high pulsation that trigger Gas Turbine experiencing PLS or derating. This effect can be overcome by improving the prefill concept and modifying the prefill system through Logic Advant, resulting in a more stable burning in the gas turbine burner.","PeriodicalId":14565,"journal":{"name":"IOSR Journal of Mechanical and Civil Engineering","volume":"43 1","pages":"13-18"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimization of Prefill Mode to Increase Reliability of Gas Turbin 13E21 PT. PJB UP Muara Tawar\",\"authors\":\"Endrik Purbo Yunastyo, D. Yulianto, A. Hidayat, K. Gunawan, T. R. Biyanto\",\"doi\":\"10.9790/1684-1403071318\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Muara Tawar block V is constructed by PT. PLN (Persero) Power Plant Master Project of Java, Bali and Nusa Tenggara Networks based on contract No. 261. PJ / 041 / DIR / 2007 (Concerning Gas Fired Power Plant Extension Project). The plant use gas turbine type 13E2. Operational concept of gas turbine type 13E2 is regulating the amount of fuel that is divided from three fuel control valves and the operating pattern is in an area known as the pilot valve and premix valve which must be maintained stability of combustion shown by pulsation parameters. The prefill concept is used to avoid flame off when gas turbine loading often passes over point switch or back point switch. Prefill itself will momentary activate a pilot valve to fill the Fuel Distribution System (FDS) line from MBP43. However, prefill gives effect of high pulsation that trigger Gas Turbine experiencing PLS or derating. This effect can be overcome by improving the prefill concept and modifying the prefill system through Logic Advant, resulting in a more stable burning in the gas turbine burner.\",\"PeriodicalId\":14565,\"journal\":{\"name\":\"IOSR Journal of Mechanical and Civil Engineering\",\"volume\":\"43 1\",\"pages\":\"13-18\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IOSR Journal of Mechanical and Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.9790/1684-1403071318\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IOSR Journal of Mechanical and Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9790/1684-1403071318","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Muara Tawar V区块由PT. PLN (Persero)电厂总项目爪哇,巴厘岛和努沙登加拉网络根据第261号合同建造。PJ / 041 / DIR / 2007(关于燃气电厂扩建工程)。该厂使用13E2型燃气轮机。13E2型燃气轮机的运行概念是调节燃料量,由三个燃料控制阀划分,操作模式是在一个称为先导阀和预混阀的区域,必须保持脉动参数显示的燃烧稳定性。当燃气轮机负荷经常通过点开关或后点开关时,采用预充概念来避免火焰熄灭。预填充本身将瞬间激活一个先导阀,从MBP43填充燃油分配系统(FDS)管线。然而,预充给高脉动的影响,触发燃气轮机经历PLS或降额。这种影响可以通过改进预充概念和通过Logic Advant修改预充系统来克服,从而使燃气轮机燃烧器的燃烧更加稳定。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimization of Prefill Mode to Increase Reliability of Gas Turbin 13E21 PT. PJB UP Muara Tawar
Muara Tawar block V is constructed by PT. PLN (Persero) Power Plant Master Project of Java, Bali and Nusa Tenggara Networks based on contract No. 261. PJ / 041 / DIR / 2007 (Concerning Gas Fired Power Plant Extension Project). The plant use gas turbine type 13E2. Operational concept of gas turbine type 13E2 is regulating the amount of fuel that is divided from three fuel control valves and the operating pattern is in an area known as the pilot valve and premix valve which must be maintained stability of combustion shown by pulsation parameters. The prefill concept is used to avoid flame off when gas turbine loading often passes over point switch or back point switch. Prefill itself will momentary activate a pilot valve to fill the Fuel Distribution System (FDS) line from MBP43. However, prefill gives effect of high pulsation that trigger Gas Turbine experiencing PLS or derating. This effect can be overcome by improving the prefill concept and modifying the prefill system through Logic Advant, resulting in a more stable burning in the gas turbine burner.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An Evaluation OfSoil Condition And Flood Risk For Road Network Of Bangladesh—Compiled From Engineering Soil Maps And Digital Elevation Model Improved Limiting Criteria for Deflection in Multi-Story Buildings Subjected to Aerodynamic Load Study on Eco-Friendly Concrete Blocks without Cement and Curing Evaluation of High Performance Concrete by Partial Replacement of Cement with Silica Fume Natural Sand and Manufactured Sand Multi Response Optimization TIG welding parameters for dissimilar weld of MONEL 400 and AISI 304 using RSM
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1