{"title":"提高13E21 PT燃气轮机可靠性的预充模式优化[j]","authors":"Endrik Purbo Yunastyo, D. Yulianto, A. Hidayat, K. Gunawan, T. R. Biyanto","doi":"10.9790/1684-1403071318","DOIUrl":null,"url":null,"abstract":"Muara Tawar block V is constructed by PT. PLN (Persero) Power Plant Master Project of Java, Bali and Nusa Tenggara Networks based on contract No. 261. PJ / 041 / DIR / 2007 (Concerning Gas Fired Power Plant Extension Project). The plant use gas turbine type 13E2. Operational concept of gas turbine type 13E2 is regulating the amount of fuel that is divided from three fuel control valves and the operating pattern is in an area known as the pilot valve and premix valve which must be maintained stability of combustion shown by pulsation parameters. The prefill concept is used to avoid flame off when gas turbine loading often passes over point switch or back point switch. Prefill itself will momentary activate a pilot valve to fill the Fuel Distribution System (FDS) line from MBP43. However, prefill gives effect of high pulsation that trigger Gas Turbine experiencing PLS or derating. This effect can be overcome by improving the prefill concept and modifying the prefill system through Logic Advant, resulting in a more stable burning in the gas turbine burner.","PeriodicalId":14565,"journal":{"name":"IOSR Journal of Mechanical and Civil Engineering","volume":"43 1","pages":"13-18"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimization of Prefill Mode to Increase Reliability of Gas Turbin 13E21 PT. PJB UP Muara Tawar\",\"authors\":\"Endrik Purbo Yunastyo, D. Yulianto, A. Hidayat, K. Gunawan, T. R. Biyanto\",\"doi\":\"10.9790/1684-1403071318\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Muara Tawar block V is constructed by PT. PLN (Persero) Power Plant Master Project of Java, Bali and Nusa Tenggara Networks based on contract No. 261. PJ / 041 / DIR / 2007 (Concerning Gas Fired Power Plant Extension Project). The plant use gas turbine type 13E2. Operational concept of gas turbine type 13E2 is regulating the amount of fuel that is divided from three fuel control valves and the operating pattern is in an area known as the pilot valve and premix valve which must be maintained stability of combustion shown by pulsation parameters. The prefill concept is used to avoid flame off when gas turbine loading often passes over point switch or back point switch. Prefill itself will momentary activate a pilot valve to fill the Fuel Distribution System (FDS) line from MBP43. However, prefill gives effect of high pulsation that trigger Gas Turbine experiencing PLS or derating. This effect can be overcome by improving the prefill concept and modifying the prefill system through Logic Advant, resulting in a more stable burning in the gas turbine burner.\",\"PeriodicalId\":14565,\"journal\":{\"name\":\"IOSR Journal of Mechanical and Civil Engineering\",\"volume\":\"43 1\",\"pages\":\"13-18\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IOSR Journal of Mechanical and Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.9790/1684-1403071318\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IOSR Journal of Mechanical and Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.9790/1684-1403071318","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
Muara Tawar V区块由PT. PLN (Persero)电厂总项目爪哇,巴厘岛和努沙登加拉网络根据第261号合同建造。PJ / 041 / DIR / 2007(关于燃气电厂扩建工程)。该厂使用13E2型燃气轮机。13E2型燃气轮机的运行概念是调节燃料量,由三个燃料控制阀划分,操作模式是在一个称为先导阀和预混阀的区域,必须保持脉动参数显示的燃烧稳定性。当燃气轮机负荷经常通过点开关或后点开关时,采用预充概念来避免火焰熄灭。预填充本身将瞬间激活一个先导阀,从MBP43填充燃油分配系统(FDS)管线。然而,预充给高脉动的影响,触发燃气轮机经历PLS或降额。这种影响可以通过改进预充概念和通过Logic Advant修改预充系统来克服,从而使燃气轮机燃烧器的燃烧更加稳定。
Optimization of Prefill Mode to Increase Reliability of Gas Turbin 13E21 PT. PJB UP Muara Tawar
Muara Tawar block V is constructed by PT. PLN (Persero) Power Plant Master Project of Java, Bali and Nusa Tenggara Networks based on contract No. 261. PJ / 041 / DIR / 2007 (Concerning Gas Fired Power Plant Extension Project). The plant use gas turbine type 13E2. Operational concept of gas turbine type 13E2 is regulating the amount of fuel that is divided from three fuel control valves and the operating pattern is in an area known as the pilot valve and premix valve which must be maintained stability of combustion shown by pulsation parameters. The prefill concept is used to avoid flame off when gas turbine loading often passes over point switch or back point switch. Prefill itself will momentary activate a pilot valve to fill the Fuel Distribution System (FDS) line from MBP43. However, prefill gives effect of high pulsation that trigger Gas Turbine experiencing PLS or derating. This effect can be overcome by improving the prefill concept and modifying the prefill system through Logic Advant, resulting in a more stable burning in the gas turbine burner.