{"title":"风电场优化设计中的综合布局与电缆布线","authors":"Martina Fischetti, M. Fischetti","doi":"10.1287/mnsc.2022.4470","DOIUrl":null,"url":null,"abstract":"We address a very important problem in offshore wind farm design, namely, the combined optimization of the turbine location and of the connection cables required to bring the electrical power produced by the turbines to a given substation, and eventually to shore. We first describe a mixed-integer linear programming model that combines previous proposals from the literature. Then we improve it by a number of additional inequalities intended to strengthen its linear programming relaxation. In particular, we propose new classes of Benders-like cuts derived from an induced-clique substructure of the problem. The validity of these cuts is established in a purely combinatorial way, without resorting to Benders’s standard duality theory, and efficient separation procedures are proposed. The practical effectiveness of the proposed cuts is established through computational tests, showing that they do improve very significantly the dual bound provided by the standard model. We also present an exact branch-and-cut solver for the problem, which separates the new cuts at run time. Computational results confirm that the new cuts are instrumental for the success of our exact solver. This paper was accepted by Chung-Piaw Teo, optimization.","PeriodicalId":18208,"journal":{"name":"Manag. Sci.","volume":"20 1","pages":"2147-2164"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Integrated Layout and Cable Routing in Wind Farm Optimal Design\",\"authors\":\"Martina Fischetti, M. Fischetti\",\"doi\":\"10.1287/mnsc.2022.4470\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We address a very important problem in offshore wind farm design, namely, the combined optimization of the turbine location and of the connection cables required to bring the electrical power produced by the turbines to a given substation, and eventually to shore. We first describe a mixed-integer linear programming model that combines previous proposals from the literature. Then we improve it by a number of additional inequalities intended to strengthen its linear programming relaxation. In particular, we propose new classes of Benders-like cuts derived from an induced-clique substructure of the problem. The validity of these cuts is established in a purely combinatorial way, without resorting to Benders’s standard duality theory, and efficient separation procedures are proposed. The practical effectiveness of the proposed cuts is established through computational tests, showing that they do improve very significantly the dual bound provided by the standard model. We also present an exact branch-and-cut solver for the problem, which separates the new cuts at run time. Computational results confirm that the new cuts are instrumental for the success of our exact solver. This paper was accepted by Chung-Piaw Teo, optimization.\",\"PeriodicalId\":18208,\"journal\":{\"name\":\"Manag. Sci.\",\"volume\":\"20 1\",\"pages\":\"2147-2164\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Manag. Sci.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1287/mnsc.2022.4470\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Manag. Sci.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1287/mnsc.2022.4470","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

我们解决了海上风电场设计中一个非常重要的问题,即涡轮机位置和连接电缆的组合优化,这些连接电缆需要将涡轮机产生的电力输送到给定的变电站,并最终输送到岸上。我们首先描述了一个混合整数线性规划模型,该模型结合了以前文献中的建议。然后我们通过一些额外的不等式来改进它,以增强它的线性规划松弛性。特别地,我们提出了从问题的诱导团子结构衍生出的类benders切割的新类别。这些切割的有效性是建立在一个纯粹的组合方式,而不是诉诸于Benders的标准对偶理论,并提出了有效的分离程序。通过计算试验证明了所提出的切割方法的实际有效性,表明它们确实大大改善了标准模型提供的对偶界。我们还为该问题提供了一个精确的分支-切割求解器,它在运行时分离新的切割。计算结果证实了新的切割对精确解算器的成功是有帮助的。本文被张忠平(Chung-Piaw Teo)接受,优化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Integrated Layout and Cable Routing in Wind Farm Optimal Design
We address a very important problem in offshore wind farm design, namely, the combined optimization of the turbine location and of the connection cables required to bring the electrical power produced by the turbines to a given substation, and eventually to shore. We first describe a mixed-integer linear programming model that combines previous proposals from the literature. Then we improve it by a number of additional inequalities intended to strengthen its linear programming relaxation. In particular, we propose new classes of Benders-like cuts derived from an induced-clique substructure of the problem. The validity of these cuts is established in a purely combinatorial way, without resorting to Benders’s standard duality theory, and efficient separation procedures are proposed. The practical effectiveness of the proposed cuts is established through computational tests, showing that they do improve very significantly the dual bound provided by the standard model. We also present an exact branch-and-cut solver for the problem, which separates the new cuts at run time. Computational results confirm that the new cuts are instrumental for the success of our exact solver. This paper was accepted by Chung-Piaw Teo, optimization.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Disclosure in Incentivized Reviews: Does It Protect Consumers? Can Blockchain Technology Help Overcome Contractual Incompleteness? Evidence from State Laws Utility Tokens, Network Effects, and Pricing Power Decentralized Platforms: Governance, Tokenomics, and ICO Design The Conceptual Flaws of Decentralized Automated Market Making
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1