泰国湾海上气田防砂策略

Normawani Kerya, D. Leong, Sippakorn Apiwathanasorn
{"title":"泰国湾海上气田防砂策略","authors":"Normawani Kerya, D. Leong, Sippakorn Apiwathanasorn","doi":"10.4043/31499-ms","DOIUrl":null,"url":null,"abstract":"\n \n \n This paper examines the sand production management strategies practised by Carigali-PTTEPI Operating Company (CPOC) to minimize the impact of excessive sand production on the processing facilities and well integrity as sand production from producing wells continues to increase. Sudden well interruptions could jeopardise the daily production delivery hence require all risks to be mitigated at early stage includes risk from sand production.\n \n \n \n Gas reservoirs in CPOC operated fields were developed with monobore completions without active sand control. CPOC adopts the passive sand management approach, where sand is allowed to be produced to surface and later managed on the top-side facilities. The objective is to manage the produced sand using existing facilities and minimize the process upset/downtime.\n CPOC Sand Production Management consists of two main parts, Monitoring and Remediation. Two types of monitoring are done: Sand Production Monitoring and Corrosion/Erosion Monitoring. Ultrasonic Sand Detector has been used as the main tool for Sand Production Monitoring. Ultrasonic Testing (UT) has been carried out for all production flowlines as part of Corrosion/Erosion monitoring. Effective monitoring has become the enabler for proactive remediation actions. The remediation focuses on two areas: minimize sand production from wells (via MSFR/MASR-Maximum Sand Free Rate/Maximum Allowable Sand Rate), carry out water shut off, sand failure analysis etc.) and improve the integrity and reliability of processing facilities through upgrading activities.\n \n \n \n The interpretation of sand production from Ultrasonic Sand Detector allows qualitative and quantitative assessments of sand production and operational instruction for flowing wells via MSFR/MASR. In addition, UT survey is used to estimate the flowline remaining life. Proactive remediation of topside equipment is done in a timely and effective manner using Ultrasonic Sand Detector's data together with other inspection data. CPOC has also upgraded several topside equipment to improve the efficiency of sand removal, equipment integrity and reliability. This topside upgrade includes main processing platform sand removal upgrade, slug catcher cleaning, flowline wrapping, etc. This multidisciplinary collaboration since 2014, which integrate the monitoring of sand production from the wellbore with remediation activities of the downstream processes, has allowed CPOC to safely operate and achieve production target without loss of containment.\n \n \n \n The sand production management strategies practised by CPOC not only allows the company to safely operate and achieve production target, it also enables the use of \"slimhole monobore\" completion which is economical and practical well design without the need for conventional downhole sand control, and results in well cost of <10 MMUS. This type of field development and sand production management has become a standard technology in the Gulf of Thailand.\n","PeriodicalId":11011,"journal":{"name":"Day 3 Thu, March 24, 2022","volume":"26 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Sand Management Strategy in Offshore Gas Field in the Gulf of Thailand\",\"authors\":\"Normawani Kerya, D. Leong, Sippakorn Apiwathanasorn\",\"doi\":\"10.4043/31499-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n \\n \\n This paper examines the sand production management strategies practised by Carigali-PTTEPI Operating Company (CPOC) to minimize the impact of excessive sand production on the processing facilities and well integrity as sand production from producing wells continues to increase. Sudden well interruptions could jeopardise the daily production delivery hence require all risks to be mitigated at early stage includes risk from sand production.\\n \\n \\n \\n Gas reservoirs in CPOC operated fields were developed with monobore completions without active sand control. CPOC adopts the passive sand management approach, where sand is allowed to be produced to surface and later managed on the top-side facilities. The objective is to manage the produced sand using existing facilities and minimize the process upset/downtime.\\n CPOC Sand Production Management consists of two main parts, Monitoring and Remediation. Two types of monitoring are done: Sand Production Monitoring and Corrosion/Erosion Monitoring. Ultrasonic Sand Detector has been used as the main tool for Sand Production Monitoring. Ultrasonic Testing (UT) has been carried out for all production flowlines as part of Corrosion/Erosion monitoring. Effective monitoring has become the enabler for proactive remediation actions. The remediation focuses on two areas: minimize sand production from wells (via MSFR/MASR-Maximum Sand Free Rate/Maximum Allowable Sand Rate), carry out water shut off, sand failure analysis etc.) and improve the integrity and reliability of processing facilities through upgrading activities.\\n \\n \\n \\n The interpretation of sand production from Ultrasonic Sand Detector allows qualitative and quantitative assessments of sand production and operational instruction for flowing wells via MSFR/MASR. In addition, UT survey is used to estimate the flowline remaining life. Proactive remediation of topside equipment is done in a timely and effective manner using Ultrasonic Sand Detector's data together with other inspection data. CPOC has also upgraded several topside equipment to improve the efficiency of sand removal, equipment integrity and reliability. This topside upgrade includes main processing platform sand removal upgrade, slug catcher cleaning, flowline wrapping, etc. This multidisciplinary collaboration since 2014, which integrate the monitoring of sand production from the wellbore with remediation activities of the downstream processes, has allowed CPOC to safely operate and achieve production target without loss of containment.\\n \\n \\n \\n The sand production management strategies practised by CPOC not only allows the company to safely operate and achieve production target, it also enables the use of \\\"slimhole monobore\\\" completion which is economical and practical well design without the need for conventional downhole sand control, and results in well cost of <10 MMUS. This type of field development and sand production management has become a standard technology in the Gulf of Thailand.\\n\",\"PeriodicalId\":11011,\"journal\":{\"name\":\"Day 3 Thu, March 24, 2022\",\"volume\":\"26 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, March 24, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31499-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, March 24, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31499-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文研究了Carigali-PTTEPI运营公司(CPOC)实施的出砂管理策略,以最大限度地减少生产井出砂量持续增加对加工设施和井完整性的影响。井的突然中断可能会危及每日的生产交付,因此需要在早期降低所有风险,包括出砂风险。在CPOC操作的油田中,气藏的开发采用单孔完井,没有主动防砂。CPOC采用被动出砂管理方法,允许出砂到地面,然后在顶部设施进行管理。目标是利用现有设施管理出砂,最大限度地减少工艺中断/停机时间。CPOC出砂管理主要由监测和整治两部分组成。进行两种类型的监测:出砂监测和腐蚀/侵蚀监测。超声波出砂探测仪已成为油井出砂监测的主要工具。作为腐蚀/侵蚀监测的一部分,超声波测试(UT)已在所有生产流水线上进行。有效的监控已经成为主动补救行动的推动者。补救措施主要集中在两个方面:减少油井出砂(通过MSFR/ masr -最大无砂率/最大允许出砂率),进行堵水、出砂破坏分析等),并通过升级活动提高处理设施的完整性和可靠性。通过MSFR/MASR,超声波探砂仪可以对出砂量进行定性和定量评估,并指导出砂井的操作。此外,UT测量还用于估算管线剩余寿命。利用超声波探砂仪的数据和其他检测数据,可以及时有效地对上部设备进行主动修复。CPOC还升级了几台上层设备,以提高除砂效率、设备完整性和可靠性。上层改造包括主处理平台除砂升级、段塞流捕集器清洗、管线包裹等。自2014年以来,这一多学科合作将井筒出砂监测与下游工艺的修复活动相结合,使CPOC能够安全运行并实现生产目标,而不会失去控制。CPOC采用的出砂管理策略不仅使公司能够安全作业并实现生产目标,而且还可以使用“小井眼单孔”完井,这是一种经济实用的井设计,无需常规的井下防砂,并且井成本低于10 MMUS。这种类型的油田开发和出砂管理已经成为泰国湾的标准技术。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Sand Management Strategy in Offshore Gas Field in the Gulf of Thailand
This paper examines the sand production management strategies practised by Carigali-PTTEPI Operating Company (CPOC) to minimize the impact of excessive sand production on the processing facilities and well integrity as sand production from producing wells continues to increase. Sudden well interruptions could jeopardise the daily production delivery hence require all risks to be mitigated at early stage includes risk from sand production. Gas reservoirs in CPOC operated fields were developed with monobore completions without active sand control. CPOC adopts the passive sand management approach, where sand is allowed to be produced to surface and later managed on the top-side facilities. The objective is to manage the produced sand using existing facilities and minimize the process upset/downtime. CPOC Sand Production Management consists of two main parts, Monitoring and Remediation. Two types of monitoring are done: Sand Production Monitoring and Corrosion/Erosion Monitoring. Ultrasonic Sand Detector has been used as the main tool for Sand Production Monitoring. Ultrasonic Testing (UT) has been carried out for all production flowlines as part of Corrosion/Erosion monitoring. Effective monitoring has become the enabler for proactive remediation actions. The remediation focuses on two areas: minimize sand production from wells (via MSFR/MASR-Maximum Sand Free Rate/Maximum Allowable Sand Rate), carry out water shut off, sand failure analysis etc.) and improve the integrity and reliability of processing facilities through upgrading activities. The interpretation of sand production from Ultrasonic Sand Detector allows qualitative and quantitative assessments of sand production and operational instruction for flowing wells via MSFR/MASR. In addition, UT survey is used to estimate the flowline remaining life. Proactive remediation of topside equipment is done in a timely and effective manner using Ultrasonic Sand Detector's data together with other inspection data. CPOC has also upgraded several topside equipment to improve the efficiency of sand removal, equipment integrity and reliability. This topside upgrade includes main processing platform sand removal upgrade, slug catcher cleaning, flowline wrapping, etc. This multidisciplinary collaboration since 2014, which integrate the monitoring of sand production from the wellbore with remediation activities of the downstream processes, has allowed CPOC to safely operate and achieve production target without loss of containment. The sand production management strategies practised by CPOC not only allows the company to safely operate and achieve production target, it also enables the use of "slimhole monobore" completion which is economical and practical well design without the need for conventional downhole sand control, and results in well cost of <10 MMUS. This type of field development and sand production management has become a standard technology in the Gulf of Thailand.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Integrated Advance Petrophysical Evaluation for Heterolithic Clastics Reservoir Characterization Optimization in Malay Basin The Transformation Journey and Key Critical Success Factors of Turbomachinery Digital Remote Monitoring Biggest Wells Plug and Abandonment Campaign – Effective Management & Best Practices Implementation Zawtika Deferment Management Enhancement: A Systematic Way to Unlock Gas Potential for Optimized Operations Breakthrough Integration of 3-1/2? Tubing in 8-1/2? Hole Cemented Monobore for Successful Tubing Stem Test TST
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1