{"title":"解决多个供应商61850实现的挑战","authors":"Anthony Eshpeter","doi":"10.1109/TDC.2016.7519867","DOIUrl":null,"url":null,"abstract":"To be designed for a self-monitoring protection and control system that would minimize wiring and troubleshooting, a 345kV Substation for a US Transmission Company for had to interoperate with multiple vendors' relays. An IEC 61850 based solution was chosen to facilitate multi-vendor compatibility. Interestingly, IEC 61850 interoperability turned out to be a major challenge as different vendors IEC 61850 software settings and implementations differ significantly. The project reinforces the importance of considering the initial cost of deployment but also the costs of potential upgrade paths as technology continues to improve.","PeriodicalId":6497,"journal":{"name":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"34 1","pages":"1-7"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Resolving the challenges of multiple vendor 61850 implementations\",\"authors\":\"Anthony Eshpeter\",\"doi\":\"10.1109/TDC.2016.7519867\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To be designed for a self-monitoring protection and control system that would minimize wiring and troubleshooting, a 345kV Substation for a US Transmission Company for had to interoperate with multiple vendors' relays. An IEC 61850 based solution was chosen to facilitate multi-vendor compatibility. Interestingly, IEC 61850 interoperability turned out to be a major challenge as different vendors IEC 61850 software settings and implementations differ significantly. The project reinforces the importance of considering the initial cost of deployment but also the costs of potential upgrade paths as technology continues to improve.\",\"PeriodicalId\":6497,\"journal\":{\"name\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"volume\":\"34 1\",\"pages\":\"1-7\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2016.7519867\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2016.7519867","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Resolving the challenges of multiple vendor 61850 implementations
To be designed for a self-monitoring protection and control system that would minimize wiring and troubleshooting, a 345kV Substation for a US Transmission Company for had to interoperate with multiple vendors' relays. An IEC 61850 based solution was chosen to facilitate multi-vendor compatibility. Interestingly, IEC 61850 interoperability turned out to be a major challenge as different vendors IEC 61850 software settings and implementations differ significantly. The project reinforces the importance of considering the initial cost of deployment but also the costs of potential upgrade paths as technology continues to improve.