通过新技术试验MFC工具,沥青质管理显著减少生产延迟

T. Narwal, Kamlesh Kumar, Z. Alias, P. Agrawal, Zahir Abri, A. Al Hadhrami, Abdulbaqi Al Kindi, John White, Azlan Asidin
{"title":"通过新技术试验MFC工具,沥青质管理显著减少生产延迟","authors":"T. Narwal, Kamlesh Kumar, Z. Alias, P. Agrawal, Zahir Abri, A. Al Hadhrami, Abdulbaqi Al Kindi, John White, Azlan Asidin","doi":"10.2118/208012-ms","DOIUrl":null,"url":null,"abstract":"\n In Southern Oman, PDO is producing from several high pressure (500-1000 bar), deep (3-5 km) and sour fields (1-10 mol % H2S). Over time, wells from one field (S A3) started having asphaltene deposition in the wellbore. Recently, the impact on production became severe resulting in high deferment, increased HSE exposure with plugging and high intervention costs.\n Asset team kicked off an asphaltene management project to tackle this problem, with one initiative being a field trial of a new technology, Magnetic Fluid Conditioner (MFC) to avoid/delay asphaltene plugging in the wellbore. This paper discusses the asphaltene management strategy and field trial results from this new tool deployed to prevent/delay asphaltene deposition.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":"12 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Asphaltene Management Leading to Significant Reduction of Production Deferment Through New Technology Trial MFC Tool\",\"authors\":\"T. Narwal, Kamlesh Kumar, Z. Alias, P. Agrawal, Zahir Abri, A. Al Hadhrami, Abdulbaqi Al Kindi, John White, Azlan Asidin\",\"doi\":\"10.2118/208012-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n In Southern Oman, PDO is producing from several high pressure (500-1000 bar), deep (3-5 km) and sour fields (1-10 mol % H2S). Over time, wells from one field (S A3) started having asphaltene deposition in the wellbore. Recently, the impact on production became severe resulting in high deferment, increased HSE exposure with plugging and high intervention costs.\\n Asset team kicked off an asphaltene management project to tackle this problem, with one initiative being a field trial of a new technology, Magnetic Fluid Conditioner (MFC) to avoid/delay asphaltene plugging in the wellbore. This paper discusses the asphaltene management strategy and field trial results from this new tool deployed to prevent/delay asphaltene deposition.\",\"PeriodicalId\":10959,\"journal\":{\"name\":\"Day 3 Wed, November 17, 2021\",\"volume\":\"12 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, November 17, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/208012-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, November 17, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/208012-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在阿曼南部,PDO正在几个高压(500-1000 bar)、深层(3-5公里)和含硫油田(1-10 mol % H2S)进行生产。随着时间的推移,一个油田(sa3)的油井开始在井筒中沉积沥青质。最近,对生产的影响变得严重,导致高延迟,堵塞增加了HSE风险和高干预成本。为了解决这一问题,资产团队启动了一项沥青质管理项目,其中一项举措是对一项新技术进行现场试验,该技术名为磁流体调节剂(MFC),可避免/延迟沥青质堵塞井筒。本文讨论了沥青质管理策略以及该新工具用于防止/延迟沥青质沉积的现场试验结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Asphaltene Management Leading to Significant Reduction of Production Deferment Through New Technology Trial MFC Tool
In Southern Oman, PDO is producing from several high pressure (500-1000 bar), deep (3-5 km) and sour fields (1-10 mol % H2S). Over time, wells from one field (S A3) started having asphaltene deposition in the wellbore. Recently, the impact on production became severe resulting in high deferment, increased HSE exposure with plugging and high intervention costs. Asset team kicked off an asphaltene management project to tackle this problem, with one initiative being a field trial of a new technology, Magnetic Fluid Conditioner (MFC) to avoid/delay asphaltene plugging in the wellbore. This paper discusses the asphaltene management strategy and field trial results from this new tool deployed to prevent/delay asphaltene deposition.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Assessment of Unconventional Resources Opportunities in the Middle East Tethyan Petroleum System in a Transfer Learning Context Block 61 Drilling Fluids Optimization Journey High Resolution Reservoir Simulator Driven Custom Scripts as the Enabler for Solving Reservoir to Surface Network Coupling Challenges Pre-Engineered Standardized Turbomachinery Solutions: A Strategic Approach to Lean Project Management Using Active and Passive Near-Field Hydrophones to Image the Near-Surface in Ultra-Shallow Waters Offshore Abu Dhabi
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1