西西伯利亚低渗透气藏TAML-3井多级压裂钻井经验

Philipp Brednev, M. Elesin, Yuriy S. Berezovskiy, D. Metelkin, G. Volkov, M. Firsin, I. Mukminov
{"title":"西西伯利亚低渗透气藏TAML-3井多级压裂钻井经验","authors":"Philipp Brednev, M. Elesin, Yuriy S. Berezovskiy, D. Metelkin, G. Volkov, M. Firsin, I. Mukminov","doi":"10.2118/205905-ms","DOIUrl":null,"url":null,"abstract":"\n This article deals with the issues related to development of petroleum resources of Western Siberia and looks at one of the most promising development targets – reservoirs of the Achimov Formation. In particular, it discusses geological features of the Achimov rocks, and the difficulties faced by oil companies in development of the Achimov reservoirs due to their low economic viability if traditional approaches to well construction are applied. To make development of such reservoirs economical, new and non-trivial solutions need to be looked for. One of the most promising of them is considered to be multi-hole wells the construction of which allows oil companies to improve the Capex to cumulative production ratio. At the pre-FEED stage the project, geological, hydrodynamic and geomechanical models of the reservoir were built, the most efficient borehole parameters and trajectories were defined, and the optimal hydraulic frac design, number of stages and parameters were selected.\n The article describes specifics of the work carried out when preparing for pilot tests of the technology, such as:requirements for defining the well profile and selecting the optimal lifting capacity of the drilling rig,selection of a suitable complexity level for the double-hole well design among those considered which meets the drilling requirements,performance of bench tests to confirm operability of the TAML-3 equipment.\n Further, the article describes results of drilling, completing and commissioning the first double-hole well at the Vyngayakhskoye field, discusses the issues faced when using the completion equipment at the TAML-3 level, and the lessons learned from this project. It also presents results of putting the double-hole well on-stream and compares its production characteristics with those of single-hole horizontal wells drilled within the same well cluster.\n The experience gained has shown that building the discussed type of wells is technically feasible, and there is a wide potential for improving efficiency of this work through respective organizational and technical measures.\n The conclusion to this article describes Gazprom Neft long-term plans to build several new wells of this design, and the technology development options such as increasing the length of horizontal segments for both holes and using high-rate multi-stage hydraulic fracturing.","PeriodicalId":10965,"journal":{"name":"Day 3 Thu, September 23, 2021","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Experience of Drilling TAML-3 Well with Mutistage Fracturing on the Low Permeability Deposits of the West Siberia\",\"authors\":\"Philipp Brednev, M. Elesin, Yuriy S. Berezovskiy, D. Metelkin, G. Volkov, M. Firsin, I. Mukminov\",\"doi\":\"10.2118/205905-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This article deals with the issues related to development of petroleum resources of Western Siberia and looks at one of the most promising development targets – reservoirs of the Achimov Formation. In particular, it discusses geological features of the Achimov rocks, and the difficulties faced by oil companies in development of the Achimov reservoirs due to their low economic viability if traditional approaches to well construction are applied. To make development of such reservoirs economical, new and non-trivial solutions need to be looked for. One of the most promising of them is considered to be multi-hole wells the construction of which allows oil companies to improve the Capex to cumulative production ratio. At the pre-FEED stage the project, geological, hydrodynamic and geomechanical models of the reservoir were built, the most efficient borehole parameters and trajectories were defined, and the optimal hydraulic frac design, number of stages and parameters were selected.\\n The article describes specifics of the work carried out when preparing for pilot tests of the technology, such as:requirements for defining the well profile and selecting the optimal lifting capacity of the drilling rig,selection of a suitable complexity level for the double-hole well design among those considered which meets the drilling requirements,performance of bench tests to confirm operability of the TAML-3 equipment.\\n Further, the article describes results of drilling, completing and commissioning the first double-hole well at the Vyngayakhskoye field, discusses the issues faced when using the completion equipment at the TAML-3 level, and the lessons learned from this project. It also presents results of putting the double-hole well on-stream and compares its production characteristics with those of single-hole horizontal wells drilled within the same well cluster.\\n The experience gained has shown that building the discussed type of wells is technically feasible, and there is a wide potential for improving efficiency of this work through respective organizational and technical measures.\\n The conclusion to this article describes Gazprom Neft long-term plans to build several new wells of this design, and the technology development options such as increasing the length of horizontal segments for both holes and using high-rate multi-stage hydraulic fracturing.\",\"PeriodicalId\":10965,\"journal\":{\"name\":\"Day 3 Thu, September 23, 2021\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, September 23, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/205905-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, September 23, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/205905-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文论述了西西伯利亚地区石油资源开发的有关问题,并对最有潜力的开发目标之一——阿奇莫夫组储层进行了探讨。特别是讨论了Achimov岩石的地质特征,以及石油公司在开发Achimov油藏时所面临的困难,因为如果采用传统的建井方法,它们的经济可行性很低。为了使这类油藏的开发更经济,需要寻找新的、不平凡的解决方案。其中最有前途的是多孔井,这种井的建造可以使石油公司提高资本支出与累计产量的比率。在项目预feed阶段,建立了油藏的地质、水动力和地质力学模型,定义了最有效的井眼参数和井眼轨迹,选择了最优水力压裂设计、段数和参数。本文介绍了该技术在准备中试时所做的具体工作,如:确定井型和选择钻机的最佳举升能力的要求,在满足钻井要求的考虑中为双孔井设计选择合适的复杂程度,以及为确认TAML-3设备的可操作性而进行的台架试验的情况。此外,本文还介绍了Vyngayakhskoye油田第一口双孔井的钻井、完井和调试结果,讨论了在TAML-3级别使用完井设备时面临的问题,以及从该项目中吸取的经验教训。文中还介绍了双孔井的投产效果,并将其与同一井群内单孔水平井的生产特征进行了比较。所获得的经验表明,建造上述类型的井在技术上是可行的,并且通过相应的组织和技术措施,有很大的潜力来提高这项工作的效率。本文的结论部分描述了Gazprom Neft的长期计划,即建造几口这种设计的新井,以及增加两个井的水平段长度和使用高速率多级水力压裂等技术开发方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Experience of Drilling TAML-3 Well with Mutistage Fracturing on the Low Permeability Deposits of the West Siberia
This article deals with the issues related to development of petroleum resources of Western Siberia and looks at one of the most promising development targets – reservoirs of the Achimov Formation. In particular, it discusses geological features of the Achimov rocks, and the difficulties faced by oil companies in development of the Achimov reservoirs due to their low economic viability if traditional approaches to well construction are applied. To make development of such reservoirs economical, new and non-trivial solutions need to be looked for. One of the most promising of them is considered to be multi-hole wells the construction of which allows oil companies to improve the Capex to cumulative production ratio. At the pre-FEED stage the project, geological, hydrodynamic and geomechanical models of the reservoir were built, the most efficient borehole parameters and trajectories were defined, and the optimal hydraulic frac design, number of stages and parameters were selected. The article describes specifics of the work carried out when preparing for pilot tests of the technology, such as:requirements for defining the well profile and selecting the optimal lifting capacity of the drilling rig,selection of a suitable complexity level for the double-hole well design among those considered which meets the drilling requirements,performance of bench tests to confirm operability of the TAML-3 equipment. Further, the article describes results of drilling, completing and commissioning the first double-hole well at the Vyngayakhskoye field, discusses the issues faced when using the completion equipment at the TAML-3 level, and the lessons learned from this project. It also presents results of putting the double-hole well on-stream and compares its production characteristics with those of single-hole horizontal wells drilled within the same well cluster. The experience gained has shown that building the discussed type of wells is technically feasible, and there is a wide potential for improving efficiency of this work through respective organizational and technical measures. The conclusion to this article describes Gazprom Neft long-term plans to build several new wells of this design, and the technology development options such as increasing the length of horizontal segments for both holes and using high-rate multi-stage hydraulic fracturing.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Incorporation of Neutrally Buoyant Proppants in Horizontal Unconventional Wells to Increase Propped Fracture Area Results for Substantially Improved Well Productivity and Economics Simplified Solution for Managed Pressure Drilling - System that Drillers Can Operate The Case for Combining Well Intervention Solutions to Optimize Production and Reduce Risk Exposure Application of Digital Well Construction Planning Tool During Well Conceptualization Phase Downhole Heating Technology – New Solution for Paraffinic Wells
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1