{"title":"产量最大化的截止品位优化","authors":"A. Khodayari, A. Jafarnejad","doi":"10.22059/IJMGE.2012.51325","DOIUrl":null,"url":null,"abstract":"In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. Different goals may be used for determining optimum cut-off grade. One of these goals may be maximizing the output rate (amount of product per year), which is very important, especially from marketing and market share points of view. Objective of this research is determining the optimum cut-off grade of processing plant in order to maximize output rate. For performing this optimization, an Operations Research (OR) model has been developed. The object function of this model is output rate that must be maximized. This model has two operational constraints namely mining and processing restrictions. For solving the model a heuristic method has been developed. Results of research show that the optimum cut-off grade for satisfying pre-stated goal is the balancing grade of mining and processing operations, and maximum production rate is a function of the maximum capacity of processing plant and average grade of ore that according to the above optimum cut-off grade must be sent to the plant.","PeriodicalId":36564,"journal":{"name":"International Journal of Mining and Geo-Engineering","volume":"14 1","pages":"157-162"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"Cut-off Grade Optimization for Maximizing the Output Rate\",\"authors\":\"A. Khodayari, A. Jafarnejad\",\"doi\":\"10.22059/IJMGE.2012.51325\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. Different goals may be used for determining optimum cut-off grade. One of these goals may be maximizing the output rate (amount of product per year), which is very important, especially from marketing and market share points of view. Objective of this research is determining the optimum cut-off grade of processing plant in order to maximize output rate. For performing this optimization, an Operations Research (OR) model has been developed. The object function of this model is output rate that must be maximized. This model has two operational constraints namely mining and processing restrictions. For solving the model a heuristic method has been developed. Results of research show that the optimum cut-off grade for satisfying pre-stated goal is the balancing grade of mining and processing operations, and maximum production rate is a function of the maximum capacity of processing plant and average grade of ore that according to the above optimum cut-off grade must be sent to the plant.\",\"PeriodicalId\":36564,\"journal\":{\"name\":\"International Journal of Mining and Geo-Engineering\",\"volume\":\"14 1\",\"pages\":\"157-162\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Mining and Geo-Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22059/IJMGE.2012.51325\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mining and Geo-Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22059/IJMGE.2012.51325","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 12

摘要

在露天矿开采中,在完成最终矿坑界限的设计后,在生产计划阶段必须做出的第一个决定是确定加工厂的截止品位。因为这个成绩有重要影响操作,选择最优边际品位是相当重要的。不同的目标可用于确定最佳截止品位。其中一个目标可能是最大限度地提高产出率(每年的产品数量),这是非常重要的,特别是从营销和市场份额的角度来看。本研究的目的是确定加工厂的最佳截止品位,以最大限度地提高产量。为了执行这种优化,开发了一个运筹学(OR)模型。该模型的目标函数是必须最大化的输出速率。该模型有两个操作约束,即挖掘约束和处理约束。为了求解该模型,提出了一种启发式方法。研究结果表明,满足预定目标的最佳截止品位是采选作业的平衡品位,最大产量是选矿厂最大生产能力与根据上述最佳截止品位必须送至选矿厂的矿石平均品位的函数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Cut-off Grade Optimization for Maximizing the Output Rate
In the open-pit mining, one of the first decisions that must be made in production planning stage, after completing the design of final pit limits, is determining of the processing plant cut-off grade. Since this grade has an essential effect on operations, choosing the optimum cut-off grade is of considerable importance. Different goals may be used for determining optimum cut-off grade. One of these goals may be maximizing the output rate (amount of product per year), which is very important, especially from marketing and market share points of view. Objective of this research is determining the optimum cut-off grade of processing plant in order to maximize output rate. For performing this optimization, an Operations Research (OR) model has been developed. The object function of this model is output rate that must be maximized. This model has two operational constraints namely mining and processing restrictions. For solving the model a heuristic method has been developed. Results of research show that the optimum cut-off grade for satisfying pre-stated goal is the balancing grade of mining and processing operations, and maximum production rate is a function of the maximum capacity of processing plant and average grade of ore that according to the above optimum cut-off grade must be sent to the plant.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Mining and Geo-Engineering
International Journal of Mining and Geo-Engineering Earth and Planetary Sciences-Geotechnical Engineering and Engineering Geology
CiteScore
0.80
自引率
0.00%
发文量
0
审稿时长
12 weeks
期刊最新文献
Categorical fracture orientation modeling: applied to an Iranian oil field Applying an integrated fuzzy gray MCDM approach: A case study on mineral processing plant site selection DEM Analysis of Backfilled Walls Subjected to Active Translation Mode Preliminary Beneficiation and Washability Studies on Ghouzlou's Low-Ash Coal Sample Combined application of computational fluid dynamics (CFD) and design of experiments (DOE) to hydrodynamic simulation of a coal classifier
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1