{"title":"装配生产中预定时间系统MTM-1与BasicMOST的比较","authors":"M. Bureš, P. Pivodová","doi":"10.1109/IEEM.2013.6962471","DOIUrl":null,"url":null,"abstract":"This paper focuses on predetermined time systems and their mutual comparison. For comparison of the methods experimental research and conditions of real assembly production were used. The main goal of the paper is demonstration of reliability, mutual accuracy and deviations of individual methods. A hypothesis needed for verification was stated, that individual methods should have accuracy deviation between 5% to 10%. Findings about time demands for analysis when using chosen methods was a partial goal of our research. For mutual comparison MTM-1 and BasicMOST methods were selected.","PeriodicalId":6454,"journal":{"name":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"4 1","pages":"546-550"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Comparison of the predetermined time systems MTM-1 and BasicMOST in assembly production\",\"authors\":\"M. Bureš, P. Pivodová\",\"doi\":\"10.1109/IEEM.2013.6962471\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper focuses on predetermined time systems and their mutual comparison. For comparison of the methods experimental research and conditions of real assembly production were used. The main goal of the paper is demonstration of reliability, mutual accuracy and deviations of individual methods. A hypothesis needed for verification was stated, that individual methods should have accuracy deviation between 5% to 10%. Findings about time demands for analysis when using chosen methods was a partial goal of our research. For mutual comparison MTM-1 and BasicMOST methods were selected.\",\"PeriodicalId\":6454,\"journal\":{\"name\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"volume\":\"4 1\",\"pages\":\"546-550\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2013.6962471\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2013.6962471","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Comparison of the predetermined time systems MTM-1 and BasicMOST in assembly production
This paper focuses on predetermined time systems and their mutual comparison. For comparison of the methods experimental research and conditions of real assembly production were used. The main goal of the paper is demonstration of reliability, mutual accuracy and deviations of individual methods. A hypothesis needed for verification was stated, that individual methods should have accuracy deviation between 5% to 10%. Findings about time demands for analysis when using chosen methods was a partial goal of our research. For mutual comparison MTM-1 and BasicMOST methods were selected.