Yenny A. Aguirre A., Mauricio Montoya P., Juan E. Pareja P., Edison A. Usma R., Andres Ortega G., Andres C. Jiménez G.
{"title":"首都圈主要经济部门中型企业生产物流流程优化现状的结构分析","authors":"Yenny A. Aguirre A., Mauricio Montoya P., Juan E. Pareja P., Edison A. Usma R., Andres Ortega G., Andres C. Jiménez G.","doi":"10.1007/978-3-030-49370-7_2","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":18000,"journal":{"name":"Lecture Notes on Multidisciplinary Industrial Engineering","volume":"25 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Structuring of the Current Status of the Optimization of Production and Logistics Processes in Medium-Sized Companies in the Main Economic Sectors of the Metropolitan Area\",\"authors\":\"Yenny A. Aguirre A., Mauricio Montoya P., Juan E. Pareja P., Edison A. Usma R., Andres Ortega G., Andres C. Jiménez G.\",\"doi\":\"10.1007/978-3-030-49370-7_2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":18000,\"journal\":{\"name\":\"Lecture Notes on Multidisciplinary Industrial Engineering\",\"volume\":\"25 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Lecture Notes on Multidisciplinary Industrial Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1007/978-3-030-49370-7_2\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Lecture Notes on Multidisciplinary Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-3-030-49370-7_2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Structuring of the Current Status of the Optimization of Production and Logistics Processes in Medium-Sized Companies in the Main Economic Sectors of the Metropolitan Area