{"title":"钢厂的短期(1-15个月)规划和控制","authors":"Jorma Kuutti, Ovako Oy","doi":"10.1016/0377-841X(79)90035-4","DOIUrl":null,"url":null,"abstract":"<div><p>Cyclic, stepvise, on customer orders based production is a normal practice in steel plants. This, however, causes many problems to all planning horizons. In this paper a hierarchic short term planning and control system of a special steel plant is introduced. Corporate planning hierarchy is also described in short.</p></div>","PeriodicalId":100475,"journal":{"name":"Engineering and Process Economics","volume":"4 2","pages":"Pages 235-243"},"PeriodicalIF":0.0000,"publicationDate":"1979-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0377-841X(79)90035-4","citationCount":"1","resultStr":"{\"title\":\"The short term (1–15 months) planning and control of a steel plant\",\"authors\":\"Jorma Kuutti, Ovako Oy\",\"doi\":\"10.1016/0377-841X(79)90035-4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Cyclic, stepvise, on customer orders based production is a normal practice in steel plants. This, however, causes many problems to all planning horizons. In this paper a hierarchic short term planning and control system of a special steel plant is introduced. Corporate planning hierarchy is also described in short.</p></div>\",\"PeriodicalId\":100475,\"journal\":{\"name\":\"Engineering and Process Economics\",\"volume\":\"4 2\",\"pages\":\"Pages 235-243\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1979-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0377-841X(79)90035-4\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering and Process Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0377841X79900354\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering and Process Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0377841X79900354","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The short term (1–15 months) planning and control of a steel plant
Cyclic, stepvise, on customer orders based production is a normal practice in steel plants. This, however, causes many problems to all planning horizons. In this paper a hierarchic short term planning and control system of a special steel plant is introduced. Corporate planning hierarchy is also described in short.