大型气田数字化驱动中的大数据IAOM项目管理和工作流程自动化

A. Alsaeedi, M. Elabrashy, M. Alzeyoudi, M. Albadi, Sandeep Soni, Jose Isambertt, Deepak Tripathi, Ankit Shah
{"title":"大型气田数字化驱动中的大数据IAOM项目管理和工作流程自动化","authors":"A. Alsaeedi, M. Elabrashy, M. Alzeyoudi, M. Albadi, Sandeep Soni, Jose Isambertt, Deepak Tripathi, Ankit Shah","doi":"10.2118/207737-ms","DOIUrl":null,"url":null,"abstract":"\n Integrated asset modeling, application of big data, and automation are among the top emerging trends in the oil and gas industry. The value associated with such implementation projects is very closely linked with the efficient use of the project management approach and a robust strategy to handle the technological challenges. This paper puts light on such initiatives implemented in a giant gas field.\n In this giant gas condensate field, a vast amount of data is generated and monitored on a daily basis. The frequent need to deliver the dynamic production target was driving this project implementation so that a value-driven system can be established while achieving the business KPIs. A phased approach was used to target multiple requirements into business deliverables where the early offline phases provided a robust base for full online integration. This project followed the agile approach focusing on getting insights from multiple stakeholders and domain experts and developing a lesson-learnt repository in all the project phases.\n The online integration solution is a critical differentiator in the workforce and process efficiency improvement. The multiple technical solution workflows helped in reducing manual efforts and streamlining the methodology in a standardized fashion. In addition, the standard project management practices, such as initializing the phases in a planned manner, followed by an interactive execution, monitoring, and controlling stages, ensured delivering project outcomes in an efficient way. This implementation also established a robust collaborative team effort to identify various different roles and responsibilities for stakeholders. This helped in the end phase when the project sustainability was essential. A strong team base maintained and updated the integrated system while delivering daily well and facility surveillance objectives and KPIs from users ranging from planning, engineering, operation, and management team. A special focus on IT team involvement throughout the project phase led to a successful data integration and diagnostic, as the core of the solution was a data-driven analytical framework integrated with multiple corporate and real-time data sources. In addition, this solution was equipped with various one-of-its-kind solution features such as business intelligence, advanced surveillance, dynamic-reservoir integration, manage-by-exception workflows, intelligence alerts, along with a strong digital framework and data architecture.\n The unique hybrid and agile project management approach focusing on delivering emerging trends and technologies to end-users in the most efficient way paved the way for achieving asset digitalization and standardization goals.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Big Data IAOM Project Management and Workflow Automation in a Giant Gas Field Digitization Drive\",\"authors\":\"A. Alsaeedi, M. Elabrashy, M. Alzeyoudi, M. Albadi, Sandeep Soni, Jose Isambertt, Deepak Tripathi, Ankit Shah\",\"doi\":\"10.2118/207737-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Integrated asset modeling, application of big data, and automation are among the top emerging trends in the oil and gas industry. The value associated with such implementation projects is very closely linked with the efficient use of the project management approach and a robust strategy to handle the technological challenges. This paper puts light on such initiatives implemented in a giant gas field.\\n In this giant gas condensate field, a vast amount of data is generated and monitored on a daily basis. The frequent need to deliver the dynamic production target was driving this project implementation so that a value-driven system can be established while achieving the business KPIs. A phased approach was used to target multiple requirements into business deliverables where the early offline phases provided a robust base for full online integration. This project followed the agile approach focusing on getting insights from multiple stakeholders and domain experts and developing a lesson-learnt repository in all the project phases.\\n The online integration solution is a critical differentiator in the workforce and process efficiency improvement. The multiple technical solution workflows helped in reducing manual efforts and streamlining the methodology in a standardized fashion. In addition, the standard project management practices, such as initializing the phases in a planned manner, followed by an interactive execution, monitoring, and controlling stages, ensured delivering project outcomes in an efficient way. This implementation also established a robust collaborative team effort to identify various different roles and responsibilities for stakeholders. This helped in the end phase when the project sustainability was essential. A strong team base maintained and updated the integrated system while delivering daily well and facility surveillance objectives and KPIs from users ranging from planning, engineering, operation, and management team. A special focus on IT team involvement throughout the project phase led to a successful data integration and diagnostic, as the core of the solution was a data-driven analytical framework integrated with multiple corporate and real-time data sources. In addition, this solution was equipped with various one-of-its-kind solution features such as business intelligence, advanced surveillance, dynamic-reservoir integration, manage-by-exception workflows, intelligence alerts, along with a strong digital framework and data architecture.\\n The unique hybrid and agile project management approach focusing on delivering emerging trends and technologies to end-users in the most efficient way paved the way for achieving asset digitalization and standardization goals.\",\"PeriodicalId\":10959,\"journal\":{\"name\":\"Day 3 Wed, November 17, 2021\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, November 17, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/207737-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, November 17, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207737-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

集成资产建模、大数据应用和自动化是油气行业的主要新兴趋势。与这些执行项目有关的价值与项目管理方法的有效使用和处理技术挑战的有力战略密切相关。本文介绍了在一个巨大的天然气田实施的这些举措。在这个巨大的凝析气田,每天都会产生大量的数据并进行监测。交付动态生产目标的频繁需求推动了该项目的实现,以便在实现业务kpi的同时建立价值驱动的系统。分阶段的方法用于将多个需求定位到业务交付物中,其中早期的离线阶段为完全在线集成提供了坚实的基础。该项目遵循敏捷方法,专注于从多个涉众和领域专家那里获得见解,并在所有项目阶段开发经验教训存储库。在线集成解决方案是劳动力和流程效率改进方面的关键区别。多个技术解决方案工作流有助于减少手工工作,并以标准化的方式简化方法。此外,标准的项目管理实践,例如以计划的方式初始化阶段,然后是交互式执行、监视和控制阶段,确保以有效的方式交付项目结果。此实现还建立了一个健壮的协作团队,以确定涉众的各种不同角色和责任。这在项目可持续性至关重要的最后阶段起到了帮助作用。强大的团队基础维护和更新集成系统,同时提供日常井和设施监控目标和kpi,来自规划、工程、运营和管理团队的用户。在整个项目阶段对IT团队参与的特别关注导致了成功的数据集成和诊断,因为解决方案的核心是一个数据驱动的分析框架,该框架集成了多个企业和实时数据源。此外,该解决方案还配备了各种独一无二的解决方案功能,如商业智能、高级监控、动态油藏集成、异常管理工作流、智能警报,以及强大的数字框架和数据架构。独特的混合和敏捷项目管理方法专注于以最有效的方式向最终用户交付新兴趋势和技术,为实现资产数字化和标准化目标铺平了道路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Big Data IAOM Project Management and Workflow Automation in a Giant Gas Field Digitization Drive
Integrated asset modeling, application of big data, and automation are among the top emerging trends in the oil and gas industry. The value associated with such implementation projects is very closely linked with the efficient use of the project management approach and a robust strategy to handle the technological challenges. This paper puts light on such initiatives implemented in a giant gas field. In this giant gas condensate field, a vast amount of data is generated and monitored on a daily basis. The frequent need to deliver the dynamic production target was driving this project implementation so that a value-driven system can be established while achieving the business KPIs. A phased approach was used to target multiple requirements into business deliverables where the early offline phases provided a robust base for full online integration. This project followed the agile approach focusing on getting insights from multiple stakeholders and domain experts and developing a lesson-learnt repository in all the project phases. The online integration solution is a critical differentiator in the workforce and process efficiency improvement. The multiple technical solution workflows helped in reducing manual efforts and streamlining the methodology in a standardized fashion. In addition, the standard project management practices, such as initializing the phases in a planned manner, followed by an interactive execution, monitoring, and controlling stages, ensured delivering project outcomes in an efficient way. This implementation also established a robust collaborative team effort to identify various different roles and responsibilities for stakeholders. This helped in the end phase when the project sustainability was essential. A strong team base maintained and updated the integrated system while delivering daily well and facility surveillance objectives and KPIs from users ranging from planning, engineering, operation, and management team. A special focus on IT team involvement throughout the project phase led to a successful data integration and diagnostic, as the core of the solution was a data-driven analytical framework integrated with multiple corporate and real-time data sources. In addition, this solution was equipped with various one-of-its-kind solution features such as business intelligence, advanced surveillance, dynamic-reservoir integration, manage-by-exception workflows, intelligence alerts, along with a strong digital framework and data architecture. The unique hybrid and agile project management approach focusing on delivering emerging trends and technologies to end-users in the most efficient way paved the way for achieving asset digitalization and standardization goals.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Assessment of Unconventional Resources Opportunities in the Middle East Tethyan Petroleum System in a Transfer Learning Context Block 61 Drilling Fluids Optimization Journey High Resolution Reservoir Simulator Driven Custom Scripts as the Enabler for Solving Reservoir to Surface Network Coupling Challenges Pre-Engineered Standardized Turbomachinery Solutions: A Strategic Approach to Lean Project Management Using Active and Passive Near-Field Hydrophones to Image the Near-Surface in Ultra-Shallow Waters Offshore Abu Dhabi
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1