基于风险的单点系泊系统完整性管理方法

Biramarta Isnadi, Suhaimi Mahasan, Syahnaz Omar, W. H. Fazli, Yusuf Sahari, Ave Suhendra, Ellis Wong, Aiman Kamaruzaman, R. Khan
{"title":"基于风险的单点系泊系统完整性管理方法","authors":"Biramarta Isnadi, Suhaimi Mahasan, Syahnaz Omar, W. H. Fazli, Yusuf Sahari, Ave Suhendra, Ellis Wong, Aiman Kamaruzaman, R. Khan","doi":"10.4043/31405-ms","DOIUrl":null,"url":null,"abstract":"\n This paper describes the SPM Integrity Management approach using risk based strategies for Single Point Mooring (SPM) throughout its asset life cycle, to ensure that there is a structural integrity management processes are implemented and SPM asset fitness for purpose is always maintained. SPM is one of the most important assets for any oil and gas upstream business, as its primary function is for product export and offloading operations. PETRONAS UPSTREAM currently operate seven (7) Single Point Mooring (SPM) assets for its Malaysia Upstream/ Downstream. To manage the integrity of the SPMs, an Integrity Management system has been developed and includes newer assets and those that are approaching or exceeding design lives.\n To optimize and focus limited resources toward critical activities, a SPM risk-based strategy and methodology for the SPM assets has been developed. The risk based inspection approach is aligned with the Structural Integrity Management (SIM) processes of DATA, EVALUATION, STRATEGY PROGRAM of the API RP2SIM code of practice. A qualitative risk based integrity management has been developed and for its implementation, inspection and maintenance activities shall target high expenditure items. SPM design, characteristic, assessment, and inspection data have been compiled and utilized in the risk based approach development.\n With this risk-based approach, PETRONAS can optimize and significantly reduce its inspection and maintenance activities whilst keeping operational risk levels within acceptable limits. The risk-based approach provides that added advantage to look at inspections and maintenance activities critically and make informed decisions on resourcing and aligning inspection & maintenance campaigns for the future.\n Inspection and maintenance measures also include an anomaly management, RBI, data management and inspections scopes of work which are being digitized and maintained within the Company's Structural Integrity Compliance System (SICS).","PeriodicalId":11011,"journal":{"name":"Day 3 Thu, March 24, 2022","volume":"174 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A Risk Based Approach for the Integrity Management of Single Point Mooring Systems\",\"authors\":\"Biramarta Isnadi, Suhaimi Mahasan, Syahnaz Omar, W. H. Fazli, Yusuf Sahari, Ave Suhendra, Ellis Wong, Aiman Kamaruzaman, R. Khan\",\"doi\":\"10.4043/31405-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper describes the SPM Integrity Management approach using risk based strategies for Single Point Mooring (SPM) throughout its asset life cycle, to ensure that there is a structural integrity management processes are implemented and SPM asset fitness for purpose is always maintained. SPM is one of the most important assets for any oil and gas upstream business, as its primary function is for product export and offloading operations. PETRONAS UPSTREAM currently operate seven (7) Single Point Mooring (SPM) assets for its Malaysia Upstream/ Downstream. To manage the integrity of the SPMs, an Integrity Management system has been developed and includes newer assets and those that are approaching or exceeding design lives.\\n To optimize and focus limited resources toward critical activities, a SPM risk-based strategy and methodology for the SPM assets has been developed. The risk based inspection approach is aligned with the Structural Integrity Management (SIM) processes of DATA, EVALUATION, STRATEGY PROGRAM of the API RP2SIM code of practice. A qualitative risk based integrity management has been developed and for its implementation, inspection and maintenance activities shall target high expenditure items. SPM design, characteristic, assessment, and inspection data have been compiled and utilized in the risk based approach development.\\n With this risk-based approach, PETRONAS can optimize and significantly reduce its inspection and maintenance activities whilst keeping operational risk levels within acceptable limits. The risk-based approach provides that added advantage to look at inspections and maintenance activities critically and make informed decisions on resourcing and aligning inspection & maintenance campaigns for the future.\\n Inspection and maintenance measures also include an anomaly management, RBI, data management and inspections scopes of work which are being digitized and maintained within the Company's Structural Integrity Compliance System (SICS).\",\"PeriodicalId\":11011,\"journal\":{\"name\":\"Day 3 Thu, March 24, 2022\",\"volume\":\"174 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Thu, March 24, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/31405-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Thu, March 24, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/31405-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文介绍了在单点系泊(SPM)的整个资产生命周期中使用基于风险的策略的SPM完整性管理方法,以确保实施结构完整性管理流程,并始终保持SPM资产的适用性。SPM是任何油气上游企业最重要的资产之一,因为它的主要功能是产品出口和卸载作业。PETRONAS UPSTREAM目前在马来西亚的上游/下游运营着7个单点系泊(SPM)资产。为了管理spm的完整性,已经开发了一个完整性管理系统,其中包括较新的资产和那些接近或超过设计寿命的资产。为了优化和集中有限的资源用于关键活动,已经开发了基于SPM风险的SPM资产策略和方法。基于风险的检查方法与API RP2SIM实践规范中的数据、评估、策略程序的结构完整性管理(SIM)过程保持一致。已制定了基于定性风险的完整性管理,为实施该管理,检查和维护活动应针对高支出项目。SPM的设计、特征、评估和检查数据已被汇编并用于基于风险的方法开发。通过这种基于风险的方法,马来西亚国家石油公司可以优化并显着减少其检查和维护活动,同时将操作风险水平保持在可接受的范围内。基于风险的方法提供了额外的优势,可以批判性地看待检查和维护活动,并为未来的资源配置和调整检查和维护活动做出明智的决策。检查和维护措施还包括异常管理、RBI、数据管理和检查工作范围,这些工作正在数字化,并在公司的结构完整性合规系统(SICS)中进行维护。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Risk Based Approach for the Integrity Management of Single Point Mooring Systems
This paper describes the SPM Integrity Management approach using risk based strategies for Single Point Mooring (SPM) throughout its asset life cycle, to ensure that there is a structural integrity management processes are implemented and SPM asset fitness for purpose is always maintained. SPM is one of the most important assets for any oil and gas upstream business, as its primary function is for product export and offloading operations. PETRONAS UPSTREAM currently operate seven (7) Single Point Mooring (SPM) assets for its Malaysia Upstream/ Downstream. To manage the integrity of the SPMs, an Integrity Management system has been developed and includes newer assets and those that are approaching or exceeding design lives. To optimize and focus limited resources toward critical activities, a SPM risk-based strategy and methodology for the SPM assets has been developed. The risk based inspection approach is aligned with the Structural Integrity Management (SIM) processes of DATA, EVALUATION, STRATEGY PROGRAM of the API RP2SIM code of practice. A qualitative risk based integrity management has been developed and for its implementation, inspection and maintenance activities shall target high expenditure items. SPM design, characteristic, assessment, and inspection data have been compiled and utilized in the risk based approach development. With this risk-based approach, PETRONAS can optimize and significantly reduce its inspection and maintenance activities whilst keeping operational risk levels within acceptable limits. The risk-based approach provides that added advantage to look at inspections and maintenance activities critically and make informed decisions on resourcing and aligning inspection & maintenance campaigns for the future. Inspection and maintenance measures also include an anomaly management, RBI, data management and inspections scopes of work which are being digitized and maintained within the Company's Structural Integrity Compliance System (SICS).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Integrated Advance Petrophysical Evaluation for Heterolithic Clastics Reservoir Characterization Optimization in Malay Basin The Transformation Journey and Key Critical Success Factors of Turbomachinery Digital Remote Monitoring Biggest Wells Plug and Abandonment Campaign – Effective Management & Best Practices Implementation Zawtika Deferment Management Enhancement: A Systematic Way to Unlock Gas Potential for Optimized Operations Breakthrough Integration of 3-1/2? Tubing in 8-1/2? Hole Cemented Monobore for Successful Tubing Stem Test TST
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1