{"title":"具有移动工艺和联合补料的经济批调度问题的数学模型","authors":"D. Gong, Jhin-Yong Lin, Gary C. Lin, Wen-Na Ma","doi":"10.1109/IEEM.2013.6962605","DOIUrl":null,"url":null,"abstract":"This paper focuses on developing a mathematical model for solving the Economic Lot Scheduling Problem (ELSP) under an imperfect (shifting) process that includes joint material replenishment, in-production screening process, imperfect rework process, scraps and shortage. The Common Cycle (CC) approach is applied for the problem formulation. Although this paper only demonstrates the first step, further research works will be on conducting effective problem solving procedures.","PeriodicalId":6454,"journal":{"name":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"28 1","pages":"1219-1222"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A mathematical model on an economic lot scheduling problem with shifting process and joint material replenishment\",\"authors\":\"D. Gong, Jhin-Yong Lin, Gary C. Lin, Wen-Na Ma\",\"doi\":\"10.1109/IEEM.2013.6962605\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper focuses on developing a mathematical model for solving the Economic Lot Scheduling Problem (ELSP) under an imperfect (shifting) process that includes joint material replenishment, in-production screening process, imperfect rework process, scraps and shortage. The Common Cycle (CC) approach is applied for the problem formulation. Although this paper only demonstrates the first step, further research works will be on conducting effective problem solving procedures.\",\"PeriodicalId\":6454,\"journal\":{\"name\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"volume\":\"28 1\",\"pages\":\"1219-1222\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE International Conference on Industrial Engineering and Engineering Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2013.6962605\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2013.6962605","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A mathematical model on an economic lot scheduling problem with shifting process and joint material replenishment
This paper focuses on developing a mathematical model for solving the Economic Lot Scheduling Problem (ELSP) under an imperfect (shifting) process that includes joint material replenishment, in-production screening process, imperfect rework process, scraps and shortage. The Common Cycle (CC) approach is applied for the problem formulation. Although this paper only demonstrates the first step, further research works will be on conducting effective problem solving procedures.