{"title":"为什么联邦电力管理委员会第1000号命令中关于区域间电力传输发展的愿景没有实现","authors":"R. Schulte, Fredric C. Fletcher","doi":"10.1016/j.tej.2020.106773","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":22425,"journal":{"name":"The Electricity Journal","volume":"1991 1","pages":"106773 - 106773"},"PeriodicalIF":0.0000,"publicationDate":"2020-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Why the vision of interregional electric transmission development in FERC Order 1000 is not happening\",\"authors\":\"R. Schulte, Fredric C. Fletcher\",\"doi\":\"10.1016/j.tej.2020.106773\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":22425,\"journal\":{\"name\":\"The Electricity Journal\",\"volume\":\"1991 1\",\"pages\":\"106773 - 106773\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-04-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Electricity Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1016/j.tej.2020.106773\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Electricity Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1016/j.tej.2020.106773","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}