{"title":"现代钻完井与新人工举升方法概念的矛盾","authors":"G. Hegazy","doi":"10.2118/207258-ms","DOIUrl":null,"url":null,"abstract":"\n In challenging times of 2020 and inconsistency with the background of a low-oil-price environment, innovative ideas needed to give a second life to all available resources such as unconventional, shallow, depleted, mature, heavy oil and by bypassed oil with a cost-effective manner (usually innovation created to fit needs). U-shaped well a combined with pigging lifting (conceptual study for new artificial lift method) is one of the selected scenarios studied under the objective of innovative, low-cost techniques to overcome many projects challenges.\n U shaped well accompanied with a new pigging artificial lift method are new concept studied in this lab work. Conceptual model presents many benefits of this new application such as solving most of the current wells and production challenges. The study reflects more well control with two paths, better well stimulation, low fracturing pressure and double rates, inject and lift chemical for clean without intervention, double well life \"additional strings\", new recompletions without rig, two horizontal side used for production or injection, step change for reservoir monitoring, improving artificial lift performance and allow creating Pigging lift \"New artificial lift concept\".\n U shaped well accompanied with a new pigging artificial lift method study shows the following progress: 1. Additional down hole barrier from the deepest point and additional open side keep the well under control more over minimize the existing well control killing procedures with low cost and risk in addition to discarding the CT operations for killing or prepare the well for W/O. 2. Decreasing stimulation pressures needs (double injection rates) and overcome the existing accessibility challenges 3. Allowing pull heading stimulation w/less displacement time and high rate and chimerical batch pumping from one side to another increase well life and eliminate PKRs risk as chimerical batches will be pigger, easier and faster. 4. Additional down hole monitoring system allowing uniform stimulation and discarding the CT operations for well stimulation and cleaning, 5. Avoiding post stimulation damage throughout fast clean-up 6. Ability to stimulate from one side with artificial lift from other side Avoiding the corrosion and erosion by faster operations 7. Allow faster plug and perf. multistage fracturing technology and overcome the unconventional well fracturing which required rate and pressure 8. Eliminate rig usage to pull the frac string to run completions 9. Step change for reservoir mentoring without S/D and real-time Logging, Sampling\n The deployment of U Shaped Well allows new artificial lift concept (Pigging lift) to apply. This new approach led to improved wells performance also raising efficiency of the use of the existing resources besides saving time and in return cost. This approach helps in improving well utilization and efficiency levels.","PeriodicalId":10959,"journal":{"name":"Day 3 Wed, November 17, 2021","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Modern Drilling and Completion in Contradiction of New Artificial Lift Method Concept\",\"authors\":\"G. Hegazy\",\"doi\":\"10.2118/207258-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n In challenging times of 2020 and inconsistency with the background of a low-oil-price environment, innovative ideas needed to give a second life to all available resources such as unconventional, shallow, depleted, mature, heavy oil and by bypassed oil with a cost-effective manner (usually innovation created to fit needs). U-shaped well a combined with pigging lifting (conceptual study for new artificial lift method) is one of the selected scenarios studied under the objective of innovative, low-cost techniques to overcome many projects challenges.\\n U shaped well accompanied with a new pigging artificial lift method are new concept studied in this lab work. Conceptual model presents many benefits of this new application such as solving most of the current wells and production challenges. The study reflects more well control with two paths, better well stimulation, low fracturing pressure and double rates, inject and lift chemical for clean without intervention, double well life \\\"additional strings\\\", new recompletions without rig, two horizontal side used for production or injection, step change for reservoir monitoring, improving artificial lift performance and allow creating Pigging lift \\\"New artificial lift concept\\\".\\n U shaped well accompanied with a new pigging artificial lift method study shows the following progress: 1. Additional down hole barrier from the deepest point and additional open side keep the well under control more over minimize the existing well control killing procedures with low cost and risk in addition to discarding the CT operations for killing or prepare the well for W/O. 2. Decreasing stimulation pressures needs (double injection rates) and overcome the existing accessibility challenges 3. Allowing pull heading stimulation w/less displacement time and high rate and chimerical batch pumping from one side to another increase well life and eliminate PKRs risk as chimerical batches will be pigger, easier and faster. 4. Additional down hole monitoring system allowing uniform stimulation and discarding the CT operations for well stimulation and cleaning, 5. Avoiding post stimulation damage throughout fast clean-up 6. Ability to stimulate from one side with artificial lift from other side Avoiding the corrosion and erosion by faster operations 7. Allow faster plug and perf. multistage fracturing technology and overcome the unconventional well fracturing which required rate and pressure 8. Eliminate rig usage to pull the frac string to run completions 9. Step change for reservoir mentoring without S/D and real-time Logging, Sampling\\n The deployment of U Shaped Well allows new artificial lift concept (Pigging lift) to apply. This new approach led to improved wells performance also raising efficiency of the use of the existing resources besides saving time and in return cost. This approach helps in improving well utilization and efficiency levels.\",\"PeriodicalId\":10959,\"journal\":{\"name\":\"Day 3 Wed, November 17, 2021\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, November 17, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/207258-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, November 17, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207258-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在2020年充满挑战的时期,与低油价环境的背景不一致,需要创新的想法,以具有成本效益的方式为所有可用资源(如非常规、浅层、枯竭、成熟、重油和旁路油)提供第二次生命(通常是为了满足需求而创造的创新)。u型井与清管举升相结合(新型人工举升方法的概念研究)是研究的目标之一,其目标是创新、低成本的技术,以克服许多项目挑战。U型井配合人工举升清管新方法是本实验室研究的新概念。概念模型展示了这种新应用的许多优点,例如解决了大多数当前的井和生产挑战。该研究反映了通过两条路径实现更好的井控、更好的增产、更低的压裂压力和两倍的产量、无需干预即可进行清洁的注入和举升化学物质、延长井寿命的“额外管柱”、无需钻机的新完井、用于生产或注入的两个水平侧、用于油藏监测的阶梯变化、提高人工举升性能,并允许创建清管举升“新的人工举升概念”。U形井伴随人工举升清管新方法的研究取得了以下进展:除了放弃连续油管压井作业或为W/O做准备外,还可以在最深点和额外的开放侧增加井下屏障,使井处于控制之下,从而最大限度地减少现有的井控压井程序,降低成本和风险。2. 降低增产压力需求(双倍注入速率),克服现有的可达性挑战。采用拉拔式增产作业,减少了驱油时间,提高了速度,从一边到另一边的化学批量泵送增加了井的寿命,消除了pkr风险,因为化学批次将更容易、更快捷。4. 额外的井下监测系统,可以实现均匀增产,而无需进行连续油管增产和清洁作业。在快速清理过程中避免增产后的损害。能够从一侧进行增产,从另一侧进行人工举升,避免了快速作业带来的腐蚀和侵蚀。允许更快的桥塞和射孔。多级压裂技术,克服了非常规压裂对速率和压力的要求。避免使用钻机拉起压裂管柱进行完井作业。U形井的部署使新的人工举升概念(清管举升)得以应用。这种新方法不仅改善了油井性能,还提高了现有资源的使用效率,节省了时间和回采成本。这种方法有助于提高井的利用率和效率水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Modern Drilling and Completion in Contradiction of New Artificial Lift Method Concept
In challenging times of 2020 and inconsistency with the background of a low-oil-price environment, innovative ideas needed to give a second life to all available resources such as unconventional, shallow, depleted, mature, heavy oil and by bypassed oil with a cost-effective manner (usually innovation created to fit needs). U-shaped well a combined with pigging lifting (conceptual study for new artificial lift method) is one of the selected scenarios studied under the objective of innovative, low-cost techniques to overcome many projects challenges. U shaped well accompanied with a new pigging artificial lift method are new concept studied in this lab work. Conceptual model presents many benefits of this new application such as solving most of the current wells and production challenges. The study reflects more well control with two paths, better well stimulation, low fracturing pressure and double rates, inject and lift chemical for clean without intervention, double well life "additional strings", new recompletions without rig, two horizontal side used for production or injection, step change for reservoir monitoring, improving artificial lift performance and allow creating Pigging lift "New artificial lift concept". U shaped well accompanied with a new pigging artificial lift method study shows the following progress: 1. Additional down hole barrier from the deepest point and additional open side keep the well under control more over minimize the existing well control killing procedures with low cost and risk in addition to discarding the CT operations for killing or prepare the well for W/O. 2. Decreasing stimulation pressures needs (double injection rates) and overcome the existing accessibility challenges 3. Allowing pull heading stimulation w/less displacement time and high rate and chimerical batch pumping from one side to another increase well life and eliminate PKRs risk as chimerical batches will be pigger, easier and faster. 4. Additional down hole monitoring system allowing uniform stimulation and discarding the CT operations for well stimulation and cleaning, 5. Avoiding post stimulation damage throughout fast clean-up 6. Ability to stimulate from one side with artificial lift from other side Avoiding the corrosion and erosion by faster operations 7. Allow faster plug and perf. multistage fracturing technology and overcome the unconventional well fracturing which required rate and pressure 8. Eliminate rig usage to pull the frac string to run completions 9. Step change for reservoir mentoring without S/D and real-time Logging, Sampling The deployment of U Shaped Well allows new artificial lift concept (Pigging lift) to apply. This new approach led to improved wells performance also raising efficiency of the use of the existing resources besides saving time and in return cost. This approach helps in improving well utilization and efficiency levels.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Assessment of Unconventional Resources Opportunities in the Middle East Tethyan Petroleum System in a Transfer Learning Context Block 61 Drilling Fluids Optimization Journey High Resolution Reservoir Simulator Driven Custom Scripts as the Enabler for Solving Reservoir to Surface Network Coupling Challenges Pre-Engineered Standardized Turbomachinery Solutions: A Strategic Approach to Lean Project Management Using Active and Passive Near-Field Hydrophones to Image the Near-Surface in Ultra-Shallow Waters Offshore Abu Dhabi
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1