项目管理中时间成本权衡的在线风险-回报模型

Guan-qun NI , Yin-feng XU , Xiao-wen XU
{"title":"项目管理中时间成本权衡的在线风险-回报模型","authors":"Guan-qun NI ,&nbsp;Yin-feng XU ,&nbsp;Xiao-wen XU","doi":"10.1016/S1874-8651(10)60094-4","DOIUrl":null,"url":null,"abstract":"<div><p>Taking into account the uncertain delay of work on the critical path, the online strategy and competitive analysis are introduced into time-cost optimizing in project management. The competitive ratio of the strategy is given, and the prerushing strategy is proved to be the best determinate one. The relationship between the general strategy and the optimal offline strategy is analyzed, and three properties are discovered. On this basis, this article designs the risk-tolerance strategy and proves its competitive ratio to help the project manager in choosing the optimal strategy according to his own risk tolerance and forecast.</p></div>","PeriodicalId":101206,"journal":{"name":"Systems Engineering - Theory & Practice","volume":"29 12","pages":"Pages 141-146"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/S1874-8651(10)60094-4","citationCount":"4","resultStr":"{\"title\":\"Online Risk-Reward Model for Time-Cost Tradeoff in Project Management\",\"authors\":\"Guan-qun NI ,&nbsp;Yin-feng XU ,&nbsp;Xiao-wen XU\",\"doi\":\"10.1016/S1874-8651(10)60094-4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Taking into account the uncertain delay of work on the critical path, the online strategy and competitive analysis are introduced into time-cost optimizing in project management. The competitive ratio of the strategy is given, and the prerushing strategy is proved to be the best determinate one. The relationship between the general strategy and the optimal offline strategy is analyzed, and three properties are discovered. On this basis, this article designs the risk-tolerance strategy and proves its competitive ratio to help the project manager in choosing the optimal strategy according to his own risk tolerance and forecast.</p></div>\",\"PeriodicalId\":101206,\"journal\":{\"name\":\"Systems Engineering - Theory & Practice\",\"volume\":\"29 12\",\"pages\":\"Pages 141-146\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/S1874-8651(10)60094-4\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Systems Engineering - Theory & Practice\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S1874865110600944\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Systems Engineering - Theory & Practice","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1874865110600944","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

考虑关键路径上工作延迟的不确定性,将在线策略和竞争分析引入到项目管理的时间成本优化中。给出了各策略的竞争比,并证明了预冲策略是最优确定策略。分析了一般策略与最优离线策略之间的关系,发现了三个性质。在此基础上,设计风险承受策略并证明其竞争比,帮助项目经理根据自身的风险承受能力和预测选择最优策略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Online Risk-Reward Model for Time-Cost Tradeoff in Project Management

Taking into account the uncertain delay of work on the critical path, the online strategy and competitive analysis are introduced into time-cost optimizing in project management. The competitive ratio of the strategy is given, and the prerushing strategy is proved to be the best determinate one. The relationship between the general strategy and the optimal offline strategy is analyzed, and three properties are discovered. On this basis, this article designs the risk-tolerance strategy and proves its competitive ratio to help the project manager in choosing the optimal strategy according to his own risk tolerance and forecast.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Information technology and systems Book review editorial Book review editorial A combined forecasting method integrating contextual knowledge Personal Credit Risk Measurement: Bilateral Antibody Artificial Immune Probability Model
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1