{"title":"Analisa Efisiensi Economizer Terhadap Boiler (Gas Dan Solar) Di PT. Spindo III, Tbk","authors":"Finus Ainun, J. Jamaaluddin","doi":"10.21070/jeee-u.v2i2.1697","DOIUrl":null,"url":null,"abstract":"The role of boiler machines at PT. SPINDO in the galvanize pipe production process is very important, where the steam produced by the fire tube boiler machine is directly distributed into the blow system for the cleaning of the remaining galvanic in the pipe and heating the water for pipe washing. To determine the efficiency of the boiler, a direct method is used to analyze the efficiency of boiler machines and indirect methods as a way of calculating the amount of efficiency if an economizer is installed. The efficiency of diesel-fueled boilers using the direct method yields an average yield of 40.7% (forty point seven percent) and 45.84% (forty five point eighty four percent) for gas-fired boilers. However, by using an indirect method, efficiency if installed economizer is obtained at 85.55% (eighty five point fifty five percent) for diesel-fueled boilers with a capacity of 5 tons and 81.76% (eighty one point seventy six percent) of the efficiency of a gas-fired boiler with a capacity of 2 (two) tons. Efficiency improvements can also be done in many ways, including maintenance of a good and scheduled boiler machine for good boiler feed water treatment.","PeriodicalId":320287,"journal":{"name":"JEEE-U (Journal of Electrical and Electronic Engineering-UMSIDA)","volume":"57 9","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JEEE-U (Journal of Electrical and Electronic Engineering-UMSIDA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21070/jeee-u.v2i2.1697","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The role of boiler machines at PT. SPINDO in the galvanize pipe production process is very important, where the steam produced by the fire tube boiler machine is directly distributed into the blow system for the cleaning of the remaining galvanic in the pipe and heating the water for pipe washing. To determine the efficiency of the boiler, a direct method is used to analyze the efficiency of boiler machines and indirect methods as a way of calculating the amount of efficiency if an economizer is installed. The efficiency of diesel-fueled boilers using the direct method yields an average yield of 40.7% (forty point seven percent) and 45.84% (forty five point eighty four percent) for gas-fired boilers. However, by using an indirect method, efficiency if installed economizer is obtained at 85.55% (eighty five point fifty five percent) for diesel-fueled boilers with a capacity of 5 tons and 81.76% (eighty one point seventy six percent) of the efficiency of a gas-fired boiler with a capacity of 2 (two) tons. Efficiency improvements can also be done in many ways, including maintenance of a good and scheduled boiler machine for good boiler feed water treatment.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
分析PT. Spindo III和Tbk的锅炉的经济效率
PT. SPINDO锅炉机在镀锌管生产过程中的作用非常重要,其中火管锅炉机产生的蒸汽直接分配到吹风系统中,用于清洗管道中剩余的电,并加热水进行管道清洗。为了确定锅炉的效率,使用直接法来分析锅炉的效率,如果安装省煤器,则使用间接法来计算效率量。使用直接法的柴油锅炉的效率平均为40.7%(47.7%),燃气锅炉的效率平均为45.84%(45.84%)。然而,采用间接方法,安装省煤器的效率对于容量为5吨的柴油锅炉为85.55%(85.55%),对于容量为2吨的燃气锅炉为81.76%(86.76%)。效率的提高也可以通过很多方式来完成,包括维护一台好的和预定的锅炉机,以进行良好的锅炉给水处理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Leak Monitoring in Split Duct Air Conditioner Based on Internet of Things Design of a Height and Weight Measurement Tool for Toddlers at Spreadsheet-Based Posyandu The Protection Relay Coordination Studies (Over Current Relays and Ground Fault Relays) On The Power Plant Electrical System, PT. Rekind Daya Mamuju By Using The ETAP 12.6 Program Design of Atmega2560 Charge Controller Battery Using Static Bicycle Sistem Monitoring Dan Kontrol Motor Listrik Industri Menggunakan Internet Of Things (IoT)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1