Risk assessment approach for re-regulated distribution systems

A. Chowdhury, D. Koval
{"title":"Risk assessment approach for re-regulated distribution systems","authors":"A. Chowdhury, D. Koval","doi":"10.1109/IREP.2007.4410528","DOIUrl":null,"url":null,"abstract":"In an attempt to re-regulate the distribution segment of an electric power system, public utility commissions (PUCs) are increasingly adopting a reward/penalty framework in order to guarantee acceptable electric supply reliability. This reward/penalty framework is commonly known as performance based ratemaking (PBR). A PBR framework is introduced to provide distribution utilities with incentives for economic efficiency gains in the competitive generation and transmission markets. A distribution utility's historical reliability performance records could be utilized to create practical PBR mechanisms. This paper presents actual reliability performance history from two different Canadian utilities used to develop PBR frameworks for use in a re-regulated environment. An analysis of financial risk related to historic reliability data is presented by including reliability index probability distributions in a PBR plan. In addition, this paper identifies a number of factors and issues that should be considered in generating a PBR plan for a distribution utility. A brief analysis of cause contributions to reliability indices also is performed and presented in this paper. The historic reliability based PBR framework developed in this paper will find practical applications in the emerging deregulated electricity market.","PeriodicalId":214545,"journal":{"name":"2007 iREP Symposium - Bulk Power System Dynamics and Control - VII. Revitalizing Operational Reliability","volume":"127 28","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-12-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 iREP Symposium - Bulk Power System Dynamics and Control - VII. Revitalizing Operational Reliability","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IREP.2007.4410528","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In an attempt to re-regulate the distribution segment of an electric power system, public utility commissions (PUCs) are increasingly adopting a reward/penalty framework in order to guarantee acceptable electric supply reliability. This reward/penalty framework is commonly known as performance based ratemaking (PBR). A PBR framework is introduced to provide distribution utilities with incentives for economic efficiency gains in the competitive generation and transmission markets. A distribution utility's historical reliability performance records could be utilized to create practical PBR mechanisms. This paper presents actual reliability performance history from two different Canadian utilities used to develop PBR frameworks for use in a re-regulated environment. An analysis of financial risk related to historic reliability data is presented by including reliability index probability distributions in a PBR plan. In addition, this paper identifies a number of factors and issues that should be considered in generating a PBR plan for a distribution utility. A brief analysis of cause contributions to reliability indices also is performed and presented in this paper. The historic reliability based PBR framework developed in this paper will find practical applications in the emerging deregulated electricity market.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
再管制配电系统的风险评估方法
为了重新管制电力系统的分配部分,公用事业委员会越来越多地采用奖罚框架,以保证可接受的电力供应可靠性。这种奖励/惩罚框架通常被称为基于绩效的费率制定(PBR)。引入PBR框架是为了在竞争激烈的发电和输电市场中为配电公司提供经济效率提高的激励。配电设施的历史可靠性性能记录可用于创建实用的PBR机制。本文介绍了两个不同的加拿大公用事业公司的实际可靠性性能历史,用于开发用于重新监管环境的PBR框架。通过在PBR计划中引入可靠性指标概率分布,分析了与历史可靠性数据相关的财务风险。此外,本文还确定了在为配电设施生成PBR计划时应该考虑的许多因素和问题。本文还对可靠性指标的原因贡献进行了简要分析。本文开发的基于历史可靠性的PBR框架将在新兴的放松管制的电力市场中找到实际应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Risk assessment approach for re-regulated distribution systems The economic aspects of operational reliability in electricity markets Optimal Energy Flow of integrated energy systems with hydrogen economy considerations A hybrid on-line slow voltage control scheme for large power systems Satellite based communication network for large scale power system applications
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1