A dynamic scheduling parallel test system with CVI

Fan Shuyi, Wang Cheng, Cui Shao Shui
{"title":"A dynamic scheduling parallel test system with CVI","authors":"Fan Shuyi, Wang Cheng, Cui Shao Shui","doi":"10.1109/ICCIAUTOM.2011.6183908","DOIUrl":null,"url":null,"abstract":"This paper develops a practical dynamic scheduling parallel test system with multi-threading technology that CVI supports and appropriate hardware resources. In process of tasks scheduling, it can automatically search for available free test resources dynamically and allocate it to the task that is waiting to be tested. The test result shows this method can make full use of test resources and improves the test efficiency greatly as compared with serial test.","PeriodicalId":177039,"journal":{"name":"2011 2nd International Conference on Control, Instrumentation and Automation (ICCIA)","volume":"12 2","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 2nd International Conference on Control, Instrumentation and Automation (ICCIA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCIAUTOM.2011.6183908","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper develops a practical dynamic scheduling parallel test system with multi-threading technology that CVI supports and appropriate hardware resources. In process of tasks scheduling, it can automatically search for available free test resources dynamically and allocate it to the task that is waiting to be tested. The test result shows this method can make full use of test resources and improves the test efficiency greatly as compared with serial test.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于CVI的动态调度并行测试系统
本文利用CVI支持的多线程技术和适当的硬件资源开发了一个实用的动态调度并行测试系统。在任务调度过程中,可以动态自动搜索可用的空闲测试资源,并将其分配给等待测试的任务。测试结果表明,与串行测试相比,该方法可以充分利用测试资源,大大提高测试效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A dynamic scheduling parallel test system with CVI A research of algorithm based on probability weighted fuzzy association rules Design of assembly line of diesel engine factory based on RFID technology Application of genetic algorithm in computer aided design A new method of parameters determined in image recognition by PCNN
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1