E. Samuel, N. Nopsiri, Lee Chan Fong, Alxner Kalalo, Nicholas Moses, Agus Jayadi, Ding Yi, A. Nordin, Melissa Teoh
{"title":"Advancement of Open Hole Gravel Pack and Zonal Isolation with Selective Intelligent Completion in Deepwater Malaysia","authors":"E. Samuel, N. Nopsiri, Lee Chan Fong, Alxner Kalalo, Nicholas Moses, Agus Jayadi, Ding Yi, A. Nordin, Melissa Teoh","doi":"10.2523/iptc-22882-ms","DOIUrl":null,"url":null,"abstract":"\n As fields mature, the drilling and completion design and execution for infill development becomes challenging. In a deepwater environment, one of the strategies to address this challenge is to optimize subsea facilities by targeting several reservoir packages in a single wellbore. However, this technique comes with technical challenges because penetrating different zones requires active reservoir management, an allowance for zonal isolation, and an adequate response to potential crossflow. A smart completion architecture should overcome these constraints and reduce overall capital expenditure while maximizing production. Furthermore, for wells requiring sand control, the completion solution must ensure a reliable and proven approach that minimizes the potential completion failures introduced by unsuccessful sand retention. This paper presents the completion strategy implemented in an intelligent well completed in the Malaysian deepwater Block K, during the field development of Siakap North Petai (SNP) Phase 2 and executed in Q1 2022.","PeriodicalId":153269,"journal":{"name":"Day 2 Thu, March 02, 2023","volume":"19 4","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Thu, March 02, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-22882-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
As fields mature, the drilling and completion design and execution for infill development becomes challenging. In a deepwater environment, one of the strategies to address this challenge is to optimize subsea facilities by targeting several reservoir packages in a single wellbore. However, this technique comes with technical challenges because penetrating different zones requires active reservoir management, an allowance for zonal isolation, and an adequate response to potential crossflow. A smart completion architecture should overcome these constraints and reduce overall capital expenditure while maximizing production. Furthermore, for wells requiring sand control, the completion solution must ensure a reliable and proven approach that minimizes the potential completion failures introduced by unsuccessful sand retention. This paper presents the completion strategy implemented in an intelligent well completed in the Malaysian deepwater Block K, during the field development of Siakap North Petai (SNP) Phase 2 and executed in Q1 2022.
随着油田的成熟,钻井和完井的设计和执行变得具有挑战性。在深水环境中,解决这一挑战的策略之一是通过在单个井眼中定位多个储层包来优化水下设施。然而,该技术面临着技术挑战,因为穿透不同的层需要积极的油藏管理,考虑层间隔离,以及对潜在的交叉流的充分响应。智能完井架构应该克服这些限制,在最大限度地提高产量的同时减少总体资本支出。此外,对于需要防砂的井,完井解决方案必须确保可靠且经过验证的方法,以最大限度地减少因留砂失败而导致的完井失败。本文介绍了马来西亚深水区块K在Siakap North Petai (SNP)第二期油田开发期间实施的智能井完井策略,该井于2022年第一季度执行。