ROAD PLANNING ON SEGMENT INARI – BOFUWER (STA. 61 + 500 – 68 + 200) KAIMANA REGENCY WEST PAPUA PROVINCE

CI-TECH Pub Date : 2021-11-20 DOI:10.33005/ci-tech.v2i2.46
Femmy Kindanti, I. Sholichin
{"title":"ROAD PLANNING ON SEGMENT INARI – BOFUWER (STA. 61 + 500 – 68 + 200) KAIMANA REGENCY WEST PAPUA PROVINCE","authors":"Femmy Kindanti, I. Sholichin","doi":"10.33005/ci-tech.v2i2.46","DOIUrl":null,"url":null,"abstract":"West Papua Province is a new province with a relatively low economic level due to inadequate road access. Many areas are isolated, which hampers the distribution of goods and services. One isolated area is the Kaimana Regency with Fakfak Regency. Therefore, to open regional isolation and improve the local community's economy, it is necessary to plan a road in the Inari – Bofuwer segment as an infrastructure that can connect the two areas.Road planning consists of geometric road planning based on Tata Cara Perencanaan Geometrik Jalan Antar Kota No. 38 Tahun 1997, road pavement thickness planning using the 2017 Bina Marga method, and road drainage planning based on Perencanaan Sistem Drainase Jalan Tahun 2006.The geometric design of the road for horizontal alignment obtained 13 Spiral-Circle-Spiral bends and 5 Spiral-Spiral bends. In contrast, the vertical alignment consists of 13 concave curves and 13 convex curves. The road pavement uses Burda or Burtu with a thickness of LPA Class A 250 mm, LPA Class B 110 mm, and a soil stabilization layer 150 mm. The planned road drainage channel is in the form of a trapezoid with a width of 0,4 – 0,6 meters and a height of 0,85 – 1,15 meters.","PeriodicalId":265863,"journal":{"name":"CI-TECH","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"CI-TECH","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33005/ci-tech.v2i2.46","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

West Papua Province is a new province with a relatively low economic level due to inadequate road access. Many areas are isolated, which hampers the distribution of goods and services. One isolated area is the Kaimana Regency with Fakfak Regency. Therefore, to open regional isolation and improve the local community's economy, it is necessary to plan a road in the Inari – Bofuwer segment as an infrastructure that can connect the two areas.Road planning consists of geometric road planning based on Tata Cara Perencanaan Geometrik Jalan Antar Kota No. 38 Tahun 1997, road pavement thickness planning using the 2017 Bina Marga method, and road drainage planning based on Perencanaan Sistem Drainase Jalan Tahun 2006.The geometric design of the road for horizontal alignment obtained 13 Spiral-Circle-Spiral bends and 5 Spiral-Spiral bends. In contrast, the vertical alignment consists of 13 concave curves and 13 convex curves. The road pavement uses Burda or Burtu with a thickness of LPA Class A 250 mm, LPA Class B 110 mm, and a soil stabilization layer 150 mm. The planned road drainage channel is in the form of a trapezoid with a width of 0,4 – 0,6 meters and a height of 0,85 – 1,15 meters.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
i - i段道路规划- bower (sta)。61 + 500 - 68 + 200)凯马纳摄政西巴布亚省
西巴布亚省是一个新省,由于道路不足,经济水平相对较低。许多地区是孤立的,这阻碍了货物和服务的分配。一个孤立的地区是凯马纳摄政和法克法克摄政。因此,为了打破区域隔离,改善当地社区的经济,有必要在伊纳里-鲍弗尔段规划一条道路,作为连接两个地区的基础设施。道路规划包括基于1997年塔塔卡拉perencananan Geometrik Jalan Antar Kota No. 38 Tahun的几何道路规划,使用2017年Bina Marga方法的道路路面厚度规划,以及基于perencananan system Drainase Jalan Tahun 2006的道路排水规划。水平走向道路的几何设计得到13个螺旋-圆-螺旋弯道和5个螺旋-螺旋弯道。相比之下,垂直对齐由13条凹曲线和13条凸曲线组成。路面采用Burda或Burtu, LPA a级厚度为250毫米,LPA B级厚度为110毫米,土壤稳定层为150毫米。规划的道路排水通道呈梯形,宽度为0,4 - 0,6米,高度为0,85 - 1,15米。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
VALUATION OF SAFETY APPLICATION OF LAND TRANSPORTATION ON PORONG ARTERIAL ROAD – PURWOSARI ROADWAY STA 30+00 – STA 61+400 ANALYSIS OF ENVIRONMENTAL NOISE LEVELS IN SONDIR,BORING SOIL WORK AT KADIRI UNIVERSITY The Project Performance Evaluation of Road Construction Project Using Earned Value Method The Effect Of The Use of Aluminum Fiber As A Partial Substitution of Fine Aggregate on The Compressive Strength of Concrete MULTIPLE IMPACT ANALYSIS OF PILING WORK ON HIGH WAY PROJECTS USING THE EVM METHOD
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1