The Project Performance Evaluation of Road Construction Project Using Earned Value Method

CI-TECH Pub Date : 2022-06-06 DOI:10.33005/ci-tech.v3i01.53
Z. R. Kamandang
{"title":"The Project Performance Evaluation of Road Construction Project Using Earned Value Method","authors":"Z. R. Kamandang","doi":"10.33005/ci-tech.v3i01.53","DOIUrl":null,"url":null,"abstract":"\n \n \n \nThe fundamental goal of project management is to finish a facility building project on schedule and within budget while adhering to defined standards and specifications.  No matter how great the construction project plan is, if frequent and timely reviews are not done throughout project execution, neither the project progress nor the plan's efficacy can be evaluated.  The Earned Value Method (EVM) is one of the tools used in project management that integrates scope, cost and time or schedule measures and provide an accurate picture of current project state at the time of control. This research implements the EVM to road construction project to observe the project performance during its execution and to estimate the cost and the duration of the project completion. Based on the calculation, the project team has efficient performance in using their time and cost for week one until week three, but it decreased especially in time of execution (0,864 of SPI value). Further calculations predict the project needs to prepare Rp. 115.935.300,00 to finish with Rp. 264.828.113,00 of total cost while the TE value shows this project will be finished one week behind its initial planning if no corrective action is done. \n \n \n \n","PeriodicalId":265863,"journal":{"name":"CI-TECH","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"CI-TECH","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33005/ci-tech.v3i01.53","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The fundamental goal of project management is to finish a facility building project on schedule and within budget while adhering to defined standards and specifications.  No matter how great the construction project plan is, if frequent and timely reviews are not done throughout project execution, neither the project progress nor the plan's efficacy can be evaluated.  The Earned Value Method (EVM) is one of the tools used in project management that integrates scope, cost and time or schedule measures and provide an accurate picture of current project state at the time of control. This research implements the EVM to road construction project to observe the project performance during its execution and to estimate the cost and the duration of the project completion. Based on the calculation, the project team has efficient performance in using their time and cost for week one until week three, but it decreased especially in time of execution (0,864 of SPI value). Further calculations predict the project needs to prepare Rp. 115.935.300,00 to finish with Rp. 264.828.113,00 of total cost while the TE value shows this project will be finished one week behind its initial planning if no corrective action is done.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于挣值法的道路建设项目绩效评价
项目管理的基本目标是在遵守规定的标准和规范的情况下,按时、在预算范围内完成设施建设项目。无论多么伟大的建设项目计划,如果在整个项目执行过程中没有进行频繁和及时的审查,那么无论是项目进度还是计划的有效性都无法评估。挣值法(EVM)是项目管理中使用的工具之一,它集成了范围、成本和时间或进度度量,并在控制时提供了当前项目状态的准确图像。本研究将EVM应用于道路建设项目,观察项目执行过程中的绩效,估算项目完成成本和工期。根据计算,项目团队在第一周至第三周的时间和成本使用方面表现有效,但在执行时间方面表现尤为明显(SPI值为0.864)。进一步计算预测,该项目需要准备115.935.30万卢比,以总成本264.828.11.3万卢比完成,而TE值显示,如果不采取纠正措施,该项目将比最初计划晚一周完成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
VALUATION OF SAFETY APPLICATION OF LAND TRANSPORTATION ON PORONG ARTERIAL ROAD – PURWOSARI ROADWAY STA 30+00 – STA 61+400 ANALYSIS OF ENVIRONMENTAL NOISE LEVELS IN SONDIR,BORING SOIL WORK AT KADIRI UNIVERSITY The Project Performance Evaluation of Road Construction Project Using Earned Value Method The Effect Of The Use of Aluminum Fiber As A Partial Substitution of Fine Aggregate on The Compressive Strength of Concrete MULTIPLE IMPACT ANALYSIS OF PILING WORK ON HIGH WAY PROJECTS USING THE EVM METHOD
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1