{"title":"Completion Barrier Glass Plug with Integrated Bypass Sleeve","authors":"Amier Mousa","doi":"10.2118/211582-ms","DOIUrl":null,"url":null,"abstract":"\n In order to optimize Completion installations by eliminating Intermediate Completion, reducing rig time, and preventing fluid loss, a project was initiated to develop a barrier glass plug with bypass capability. The plug allows self-filling of the tubing while running in hole and circulating of fluid to displace the wellbore. Once the bypass is closed using a pressure key applied from surface, a V0 certified barrier is established.\n A glass plug with an integrated bypass sleeve was developed to allow pumping through the plug. To develop the plug, multiple technologies from existing plugs with proven track record were incorporated. To close the bypass sleeve an Electronic Counter system, known as E-Trigger, was utilized. A pressure key is programmed in the E-Trigger Software. Once the pressure key is applied, the bypass sleeve will close. To open the plug, a Mechanical Balanced Counter System was utilized which requires pressure cycles to activate. Once the Balanced Counter is fully cycled, the glass will break and the plug will open.\n Utilizing barrier glass plug with bypass capabilities in the lower Completion will eliminate the requirement to use an intermediate completion to isolate the well and displace the well to brine. Once the sleeve is closed it will prevent fluid loss to the formation after placement of the filter cake breaker. The plug can then be used to set production packers hydraulically, pressure test production tubing, and allow for the safe installation of Christmas Trees.\n To verify the performance envelope and functionality of the plug, an erosion test was performed where 10 barrels per minute flowrate was achieved for a total volume of 10,000 barrels using water based mud. With the substantial volume pumped, no indication of erosion was seen after the test. The bypass sleeve was then closed and the plug was pressure tested and qualified to ISO 14998 V0.\n The current technologies available in the market does not allow for high flowrate pumping and remote closure of barrier glass plugs after the pumping operation. Therefore, incorporating the barrier glass plug with bypass capabilities in the lower completion will result in significant savings by reducing the completion components in the string and reducing rig time.","PeriodicalId":249690,"journal":{"name":"Day 2 Tue, November 01, 2022","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 01, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/211582-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In order to optimize Completion installations by eliminating Intermediate Completion, reducing rig time, and preventing fluid loss, a project was initiated to develop a barrier glass plug with bypass capability. The plug allows self-filling of the tubing while running in hole and circulating of fluid to displace the wellbore. Once the bypass is closed using a pressure key applied from surface, a V0 certified barrier is established. A glass plug with an integrated bypass sleeve was developed to allow pumping through the plug. To develop the plug, multiple technologies from existing plugs with proven track record were incorporated. To close the bypass sleeve an Electronic Counter system, known as E-Trigger, was utilized. A pressure key is programmed in the E-Trigger Software. Once the pressure key is applied, the bypass sleeve will close. To open the plug, a Mechanical Balanced Counter System was utilized which requires pressure cycles to activate. Once the Balanced Counter is fully cycled, the glass will break and the plug will open. Utilizing barrier glass plug with bypass capabilities in the lower Completion will eliminate the requirement to use an intermediate completion to isolate the well and displace the well to brine. Once the sleeve is closed it will prevent fluid loss to the formation after placement of the filter cake breaker. The plug can then be used to set production packers hydraulically, pressure test production tubing, and allow for the safe installation of Christmas Trees. To verify the performance envelope and functionality of the plug, an erosion test was performed where 10 barrels per minute flowrate was achieved for a total volume of 10,000 barrels using water based mud. With the substantial volume pumped, no indication of erosion was seen after the test. The bypass sleeve was then closed and the plug was pressure tested and qualified to ISO 14998 V0. The current technologies available in the market does not allow for high flowrate pumping and remote closure of barrier glass plugs after the pumping operation. Therefore, incorporating the barrier glass plug with bypass capabilities in the lower completion will result in significant savings by reducing the completion components in the string and reducing rig time.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
带集成旁路套管的完井隔离玻璃桥塞
为了通过消除中间完井、缩短钻机时间和防止流体漏失来优化完井装置,开发了一种具有旁通能力的阻隔玻璃桥塞。该桥塞允许油管在入井过程中自我填充,并允许流体循环取代井筒。一旦在地面使用压力键关闭旁路,就建立了V0认证的屏障。开发了一种带有集成旁路套管的玻璃桥塞,可以通过桥塞进行泵送。为了开发桥塞,采用了现有桥塞的多种技术,并取得了良好的业绩。为了关闭旁路套管,使用了电子计数器系统,即E-Trigger。在E-Trigger软件中编程了一个压力键。一旦施加压力键,旁路套筒将关闭。为了打开桥塞,使用了一个机械平衡计数器系统,该系统需要压力循环来激活。一旦平衡计数器完全循环,玻璃将破裂,塞子将打开。在下部完井中使用具有旁通功能的阻隔玻璃桥塞,可以避免使用中间完井来隔离井并将井置换到盐水中。一旦套筒关闭,它将防止滤饼破碎机放置后流体流失到地层中。然后,该桥塞可用于液压坐封生产封隔器,对生产油管进行压力测试,并确保采油树的安全安装。为了验证桥塞的性能和功能,进行了一次侵蚀测试,使用水基泥浆,总容积为10,000桶,流速达到10桶/分钟。在大量泵送的情况下,测试后没有发现侵蚀的迹象。然后关闭旁路套管,对桥塞进行压力测试,并符合ISO 14998 V0标准。目前市场上可用的技术不允许高流量泵送,也不允许在泵送作业后远程关闭屏障玻璃塞。因此,在下部完井中结合具有旁路功能的阻隔玻璃桥塞,通过减少管柱中的完井部件和缩短钻机时间,可以显著节省成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Advanced Analytics and Diagnostic Rules Automatically Notify Operators About Developing Failures in Rotating and Reciprocating Machines Use of Numerical Simulation Enhanced by Machine Learning Techniques to Optimize Chemical EOR Application Using a Hybrid Off-Grid Semi-Fixed Solar System to Power a Water Pump in a Water Supply Well in Remote Areas Completion Barrier Glass Plug with Integrated Bypass Sleeve Halite Pore Space Plugging Evaluation Based on the Logging Data for the Cambrian Ara Group Intra-Salt Tight Carbonate Reservoirs (South Oman Salt Basin)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1