Calculating hourly cost rates in project-based industries – part 2; cost management

J. Emblemsvåg, G. Cokins
{"title":"Calculating hourly cost rates in project-based industries – part 2; cost management","authors":"J. Emblemsvåg, G. Cokins","doi":"10.19255/JMPM02205","DOIUrl":null,"url":null,"abstract":"Hourly cost rates are crucial project costing due to the substantial proportion of labor cost in projects. Yet, there is little published about calculating hourly cost rates, and it is a contentious topic in corporations. Therefore, an approach is provided in this paper that will improve the calculation of hourly cost rates. It is based on a novel approach to Activity-Based Costing (ABC) and a revised version of the CAM-I Capacity Model which is adopted to project-based industries. Both an example and a case are provided to allow detailed discussions.","PeriodicalId":320094,"journal":{"name":"The Journal of Modern Project Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Modern Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19255/JMPM02205","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Hourly cost rates are crucial project costing due to the substantial proportion of labor cost in projects. Yet, there is little published about calculating hourly cost rates, and it is a contentious topic in corporations. Therefore, an approach is provided in this paper that will improve the calculation of hourly cost rates. It is based on a novel approach to Activity-Based Costing (ABC) and a revised version of the CAM-I Capacity Model which is adopted to project-based industries. Both an example and a case are provided to allow detailed discussions.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
计算基于项目的行业的小时成本率。第2部分成本管理
由于人工成本在项目中所占的比例很大,小时成本率是至关重要的项目成本。然而,关于计算小时成本率的出版物很少,这在企业中是一个有争议的话题。因此,本文提供了一种改进小时成本率计算的方法。它是基于作业成本核算(ABC)的一种新方法和CAM-I能力模型的修订版,该模型被用于基于项目的行业。提供了一个例子和一个案例,以便进行详细的讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Project recovery: Project failures and how to get rid of them Agile Enhancement of Critical PMBoK v6 Processes Whole Life Program Success, Leadership Competencies and Motivation for Learning – UK Defence Case Project Resource Optimization Considering Labor Productivity Factors Service based framework of research projects in higher education institutions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1