Stefano Bertazzi, R. Martini, Fabio Corgiolu, Gianfrancesco Licandro, Maurizio Soglio, A. Limone, Francesco Saitta, Marco Ghisio, Vincze Jeno, Alessandro Di Paola
{"title":"Oil & Gas Project: Achieve Power Flexibility Improving Innovation, Integration and Sustainability","authors":"Stefano Bertazzi, R. Martini, Fabio Corgiolu, Gianfrancesco Licandro, Maurizio Soglio, A. Limone, Francesco Saitta, Marco Ghisio, Vincze Jeno, Alessandro Di Paola","doi":"10.1109/MELECON48756.2020.9140541","DOIUrl":null,"url":null,"abstract":"This technical paper presents a case study for both industry and academic areas concerning the application of engineering solutions and smart technologies in a complex project aimed to upgrade power flexibility and to achieve total asset integration between a Refinery Plant and a Combined Cycle Power Plant. With the purpose of sharing peculiar factors related to \"revamping\" project modality, it has been adopted, in this paper, a descriptive approach overlaying the same project management structure actually implemented during the works. At the same time, the most innovative solutions and challenging aspects have been evidenced for all project wbs consisting of: the electrical interconnection between the different High Voltage Substations and Electrical National Grid, the contextual integration of control automation systems and the combustion system upgrade of Gas Turbine including related modifications to balance of plant. In the conclusions main benefits and advantages achieved by the project have been highlighted in a comprehensive overview.","PeriodicalId":268311,"journal":{"name":"2020 IEEE 20th Mediterranean Electrotechnical Conference ( MELECON)","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE 20th Mediterranean Electrotechnical Conference ( MELECON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MELECON48756.2020.9140541","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This technical paper presents a case study for both industry and academic areas concerning the application of engineering solutions and smart technologies in a complex project aimed to upgrade power flexibility and to achieve total asset integration between a Refinery Plant and a Combined Cycle Power Plant. With the purpose of sharing peculiar factors related to "revamping" project modality, it has been adopted, in this paper, a descriptive approach overlaying the same project management structure actually implemented during the works. At the same time, the most innovative solutions and challenging aspects have been evidenced for all project wbs consisting of: the electrical interconnection between the different High Voltage Substations and Electrical National Grid, the contextual integration of control automation systems and the combustion system upgrade of Gas Turbine including related modifications to balance of plant. In the conclusions main benefits and advantages achieved by the project have been highlighted in a comprehensive overview.