Martin Schellander, T. Khatib, W. Elmenreich, Dominik Egarter
{"title":"Techno-economical assessment of grid-connected photovoltaic power systems productivity in summer season in Klagenfurt, Austria","authors":"Martin Schellander, T. Khatib, W. Elmenreich, Dominik Egarter","doi":"10.1109/PECON.2014.7062463","DOIUrl":null,"url":null,"abstract":"This paper shows the productivity of grid-connected photovoltaic systems, to plan future investments in the region around Klagenfurt, Austria. To evaluate the usage of grid-connected PV systems, a methodology based on mainly three factors is presented. These factors are yield factor, capacity factor and cost of energy. The analysis is done by a model based on monitored PV data and meteorological data in an interval of 15 minutes. Meteorological data was recorded from May 2013 until July 2014 with a lack of data from September 2013 until January 2014. By analyzing the collected data, it is found that the daily average solar energy in Klagenfurt was 6613Wh/m2 in the time of research. The results of the research show that future investments in grid-connected PV systems in Klagenfurt can be profitable. The yield factor over the time of research (293 days) is 1263.4kWh/kWp, whereas the capacity factor of the proposed system is 17.97%. The cost of energy is found to be 0.2348€/kWh. This is a satisfactory result compared with values of other European counties.","PeriodicalId":126366,"journal":{"name":"2014 IEEE International Conference on Power and Energy (PECon)","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Conference on Power and Energy (PECon)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PECON.2014.7062463","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
This paper shows the productivity of grid-connected photovoltaic systems, to plan future investments in the region around Klagenfurt, Austria. To evaluate the usage of grid-connected PV systems, a methodology based on mainly three factors is presented. These factors are yield factor, capacity factor and cost of energy. The analysis is done by a model based on monitored PV data and meteorological data in an interval of 15 minutes. Meteorological data was recorded from May 2013 until July 2014 with a lack of data from September 2013 until January 2014. By analyzing the collected data, it is found that the daily average solar energy in Klagenfurt was 6613Wh/m2 in the time of research. The results of the research show that future investments in grid-connected PV systems in Klagenfurt can be profitable. The yield factor over the time of research (293 days) is 1263.4kWh/kWp, whereas the capacity factor of the proposed system is 17.97%. The cost of energy is found to be 0.2348€/kWh. This is a satisfactory result compared with values of other European counties.