Instrumentation and Monitoring

Xxyyzz, Standard Design
{"title":"Instrumentation and Monitoring","authors":"Xxyyzz, Standard Design","doi":"10.1002/9781119489047.ch24","DOIUrl":null,"url":null,"abstract":"A detailed plan for monitoring possible ground surface movements caused by the microtunneling operations should be prepared. The plan is typically prepared by the engineer in consultation with potentially affected facility owners, as described in Section 13.5. The plan should address the equipment, method, and frequency of survey measurements. The engineer should identify special monitoring requirements. A baseline survey needs to be conducted before the start of construction sufficiently early to establish preexisting conditions. In addition to baseline surveys, before construction the contractor should document existing conditions of potentially affected structures, utilities, and facilities. The documentation of existing conditions establishes a baseline against which damage claims can be evaluated. Before the installation of instrumentation, the contractor should meet with the engineer to discuss frequency and formatting of reports as well as action levels and contingency plans.","PeriodicalId":258678,"journal":{"name":"Aquaculture Engineering","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Aquaculture Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/9781119489047.ch24","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

A detailed plan for monitoring possible ground surface movements caused by the microtunneling operations should be prepared. The plan is typically prepared by the engineer in consultation with potentially affected facility owners, as described in Section 13.5. The plan should address the equipment, method, and frequency of survey measurements. The engineer should identify special monitoring requirements. A baseline survey needs to be conducted before the start of construction sufficiently early to establish preexisting conditions. In addition to baseline surveys, before construction the contractor should document existing conditions of potentially affected structures, utilities, and facilities. The documentation of existing conditions establishes a baseline against which damage claims can be evaluated. Before the installation of instrumentation, the contractor should meet with the engineer to discuss frequency and formatting of reports as well as action levels and contingency plans.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
仪器仪表和监控
应制订详细计划,监测微隧道作业可能造成的地表移动。如第13.5节所述,该计划通常由工程师与可能受影响的设施所有者协商后编制。该计划应说明调查测量的设备、方法和频率。工程师应确定特殊的监测要求。在施工开始之前,需要进行基线调查,以便尽早确定先前存在的条件。除了基线调查外,在施工之前,承包商应记录潜在受影响的结构、公用设施和设施的现有状况。现有情况的文件建立了一个基线,可据此评估损害索赔。在安装仪器之前,承包商应与工程师会面,讨论报告的频率和格式以及行动水平和应急计划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Instrumentation and Monitoring Gas Exchange, Aeration, Oxygenation and CO 2 Removal Index Sea Cages Controlling pH, Alkalinity and Hardness
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1