{"title":"Reliability test design of a membrane air-water heat exchanger","authors":"J. Pulido","doi":"10.1109/RAM.2017.7889735","DOIUrl":null,"url":null,"abstract":"In today's global environment, accelerated life testing is becoming a competitive advantage when time spent from conceptual stage to the final product development needs to be minimized (project costs and development time) in order to be successful. Using accelerated life testing techniques for mechanical and structural applications have strong challenges when defining the loading but also the fatigue life to represent actual field performance. Such common problems as well as some helpful strategies using accelerated life testing are presented for faster planning of accelerated life testing (ALT). Examples from the refrigeration industry are used to demonstrate the utility of this strategy. In conclusion the test and analysis were effectively used to increase the degree of reliability improvements and to reduce the total number of test hours resulting in a shorter design cycle.","PeriodicalId":138871,"journal":{"name":"2017 Annual Reliability and Maintainability Symposium (RAMS)","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 Annual Reliability and Maintainability Symposium (RAMS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAM.2017.7889735","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
In today's global environment, accelerated life testing is becoming a competitive advantage when time spent from conceptual stage to the final product development needs to be minimized (project costs and development time) in order to be successful. Using accelerated life testing techniques for mechanical and structural applications have strong challenges when defining the loading but also the fatigue life to represent actual field performance. Such common problems as well as some helpful strategies using accelerated life testing are presented for faster planning of accelerated life testing (ALT). Examples from the refrigeration industry are used to demonstrate the utility of this strategy. In conclusion the test and analysis were effectively used to increase the degree of reliability improvements and to reduce the total number of test hours resulting in a shorter design cycle.