Electromagnetic compatibility design management challenges on Downtown Line (DTL) project

M. Chu, Boon Toon Loi
{"title":"Electromagnetic compatibility design management challenges on Downtown Line (DTL) project","authors":"M. Chu, Boon Toon Loi","doi":"10.1109/APEMC.2012.6238020","DOIUrl":null,"url":null,"abstract":"As modern railways deploy more complex and sensitive equipment, railway systems are increasingly vulnerable to electromagnetic interference. Effective Electromagnetic Compatibility (EMC) management is an important integral part of project management in ensuring successful delivery of railway projects. This paper highlights some challenges faced by Land Transport Authority (LTA) in the management of EMC during the DTL project design stage. To effectively address and resolve these challenges, strategy and methodology for future new projects design stage EMC management are revised and adopted.","PeriodicalId":300639,"journal":{"name":"2012 Asia-Pacific Symposium on Electromagnetic Compatibility","volume":"75 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 Asia-Pacific Symposium on Electromagnetic Compatibility","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APEMC.2012.6238020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

As modern railways deploy more complex and sensitive equipment, railway systems are increasingly vulnerable to electromagnetic interference. Effective Electromagnetic Compatibility (EMC) management is an important integral part of project management in ensuring successful delivery of railway projects. This paper highlights some challenges faced by Land Transport Authority (LTA) in the management of EMC during the DTL project design stage. To effectively address and resolve these challenges, strategy and methodology for future new projects design stage EMC management are revised and adopted.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
市区线(DTL)项目电磁兼容设计管理挑战
随着现代铁路部署越来越复杂和敏感的设备,铁路系统越来越容易受到电磁干扰。有效的电磁兼容性管理是保证铁路项目顺利交付的重要组成部分。本文重点介绍了陆路交通管理局(LTA)在DTL项目设计阶段在EMC管理方面面临的一些挑战。为了有效地应对和解决这些挑战,对未来新项目设计阶段的EMC管理策略和方法进行了修订和采用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Investigation of EFT test setup for rack mounted equipment by numerical simulations Signal integrity aware TSV positioning Virtual ground fence: A methodology for GHz power filtering on printed circuit boards EMI shielding evaluations of carbon nanotube based coatings and applications A reconfigurable beam shape patch array antenna (RBS-PA) for WiMAX and WiFi applications
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1