CAUSES OF DELAY AND SUGGESTED IMPROVEMENT IN INFRASTRUCTURE PROJECT IN INDIA.

{"title":"CAUSES OF DELAY AND SUGGESTED IMPROVEMENT IN INFRASTRUCTURE PROJECT IN INDIA.","authors":"","doi":"10.29121/ijesrt.v10.i1.2021.4","DOIUrl":null,"url":null,"abstract":"These days delay in development are the most significant issue in construction industry in India. It is second biggest industry after agriculture in India for the improvement of an economy. Delay in development projects is considered one of the most common issues causing a large number of negative impacts on the development projects. Construction delays can be minimized just when their cause are distinguished. The goal of this investigation was to identify the major reasons for construction delays. It is consistently helpful that a Project complete on time effectively. Unfortunately because of different reasons, enormous number of development projects fails to follow the arranged schedule and hence delayed in project. This paper presents the reasons for delay occurring on a progressing bridge construction project a case study.","PeriodicalId":320722,"journal":{"name":"January-2021","volume":"110 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"January-2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29121/ijesrt.v10.i1.2021.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

These days delay in development are the most significant issue in construction industry in India. It is second biggest industry after agriculture in India for the improvement of an economy. Delay in development projects is considered one of the most common issues causing a large number of negative impacts on the development projects. Construction delays can be minimized just when their cause are distinguished. The goal of this investigation was to identify the major reasons for construction delays. It is consistently helpful that a Project complete on time effectively. Unfortunately because of different reasons, enormous number of development projects fails to follow the arranged schedule and hence delayed in project. This paper presents the reasons for delay occurring on a progressing bridge construction project a case study.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
印度基础设施项目延误的原因和建议改进。
如今,印度建筑业的最大问题是发展滞后。它是印度仅次于农业的第二大产业。开发项目的延迟被认为是最常见的问题之一,对开发项目造成了大量的负面影响。只有找出原因,才能最大限度地减少施工延误。这项调查的目的是确定施工延误的主要原因。按时有效地完成一个项目总是很有帮助的。不幸的是,由于不同的原因,大量的开发项目未能按照安排的时间表进行,从而导致项目延误。本文以某在建桥梁工程为例,分析了工程延误的原因。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
DETERMINATION OF THE ELECTRONIC ENERGY LEVELS OF A QUANTUM WELL HETEROSTRUTURE Zn(1-x) MgxO/ZnO/Zn1-xMgxO. DEEP LEARNING TECHNIQUE BASED TEXT EMOTION CLASSIFICATION SYSTEM USING GENETIC ALGORITHM TECHNIQUE CAUSES OF DELAY AND SUGGESTED IMPROVEMENT IN INFRASTRUCTURE PROJECT IN INDIA. A SYSTEMATIC AND STRUCTURE CASE STUDY ON IMAGINE TECHNIQUES TO DETECT NOVEL CORONO VIRUS THE EFFECT OF OPHIOCEPHALUS STRIATUS EXTRACT ON SERUM LEPTIN LEVEL OF CANCER CACHEXIA PATIENTS
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1