{"title":"Coordinated auction project in Central Europe","authors":"P. Sole","doi":"10.1109/CIGRE.2005.1532739","DOIUrl":null,"url":null,"abstract":"The demand for capacity reservations at the transmission interconnections between control areas in Central Europe is usually much higher than the capacity available for electricity trading. It is expected, that as a consequence of market opening according to the market liberalisation in Europe, the demand will further increase over time. In the beginning of 90th, before liberalisation of electricity market, there were vertically integrated utilities - monopolies in each of Central European countries. Cross border exchange was mainly between two utilities, and only as an addition to the overall national balance. Utilisation of interconnectors was planned together with system balance planning and there was under normal operation no congestions. Since 2002, demand for cross border capacity exceeded permanently offered capacities. Congestion management methods was gradually developed on different interconnectors depend on the level of electricity market opening in different states. The vast majority of electricity trading in control areas of concerned TSOs is thus based on OTC bilateral contracts. For that reason, explicit auctions was established as the most appropriate market mechanism for cross border capacity allocation. First auctions was organized independently on both sides of the interconnection i.e. two auctions for one interconnection. Soon after, under the pressure from traders side, concerned TSOs established on most of the interconnectors common bilateral auction. Due to the technical constrains in the regional network there are two possible technical limits, which must be taken into account. Either the internal network in one control area is congested as a consequence of the past development. Concerned TSO's in the region agreed to start a common regional auctioning procedure for transmission capacities reservation on all borders between them in the same time and to allocate available capacities on the congested profiles in the way which gives to market players a requested transmission capacity reservation on the indicated border . Auctions for yearly, monthly and daily capacities for the year 2005 was organized followed by monthly auctions. Daily auctions and capacity transfers among market participants are administrated by Internet based system through auction e-portal","PeriodicalId":414346,"journal":{"name":"International Symposium CIGRE/IEEE PES, 2005.","volume":"66 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-11-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium CIGRE/IEEE PES, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIGRE.2005.1532739","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The demand for capacity reservations at the transmission interconnections between control areas in Central Europe is usually much higher than the capacity available for electricity trading. It is expected, that as a consequence of market opening according to the market liberalisation in Europe, the demand will further increase over time. In the beginning of 90th, before liberalisation of electricity market, there were vertically integrated utilities - monopolies in each of Central European countries. Cross border exchange was mainly between two utilities, and only as an addition to the overall national balance. Utilisation of interconnectors was planned together with system balance planning and there was under normal operation no congestions. Since 2002, demand for cross border capacity exceeded permanently offered capacities. Congestion management methods was gradually developed on different interconnectors depend on the level of electricity market opening in different states. The vast majority of electricity trading in control areas of concerned TSOs is thus based on OTC bilateral contracts. For that reason, explicit auctions was established as the most appropriate market mechanism for cross border capacity allocation. First auctions was organized independently on both sides of the interconnection i.e. two auctions for one interconnection. Soon after, under the pressure from traders side, concerned TSOs established on most of the interconnectors common bilateral auction. Due to the technical constrains in the regional network there are two possible technical limits, which must be taken into account. Either the internal network in one control area is congested as a consequence of the past development. Concerned TSO's in the region agreed to start a common regional auctioning procedure for transmission capacities reservation on all borders between them in the same time and to allocate available capacities on the congested profiles in the way which gives to market players a requested transmission capacity reservation on the indicated border . Auctions for yearly, monthly and daily capacities for the year 2005 was organized followed by monthly auctions. Daily auctions and capacity transfers among market participants are administrated by Internet based system through auction e-portal
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
协调中欧拍卖项目
中欧控制区之间输电互连的容量预留需求通常远高于电力交易的可用容量。预计,随着欧洲市场自由化的开放,需求将随着时间的推移进一步增加。90年代初,在电力市场自由化之前,中欧各国都存在垂直整合的公用事业垄断。跨境交换主要是在两家公用事业公司之间进行的,只是作为对国家总体平衡的补充。互连线的使用已与系统平衡规划一起规划,在正常运作下没有拥塞。自2002年以来,对跨境运力的需求超过了永久提供的运力。根据各州电力市场开放程度的不同,在不同的互联网络上逐步发展出拥堵管理方法。因此,在有关电力服务公司的管制区内,绝大多数电力交易都是基于场外交易双边合约。因此,明确拍卖是跨境产能配置最合适的市场机制。第一次拍卖是在互联的双方独立组织的,即一次互联的两次拍卖。不久之后,在贸易商方面的压力下,有关的贸易商组织在大多数互连点上建立了共同的双边拍卖。由于区域网络的技术限制,有两种可能的技术限制,必须加以考虑。一个控制区域的内部网络由于过去的发展而变得拥挤。该地区有关的TSO同意在同一时间启动一个共同的区域拍卖程序,以保留它们之间所有边界的传输容量,并以向市场参与者提供指定边界上请求的传输容量预留的方式,在拥挤的剖面上分配可用容量。2005年的年度、月度和每日容量拍卖在每月拍卖之后举行。日常拍卖和市场参与者之间的容量转移是通过拍卖电子门户网站进行管理的
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Practicability of SPS coordination in market environment for impending UCTE-IPS/UPS interconnection Coordinated auction project in Central Europe Congestion management: The system operators challenge to balance transmission transfer capacity with an acceptable security level Congestion management in Japan Financial impacts of congestion relief measures under different congestion management schemes
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1