{"title":"Security constraints for wind power operation","authors":"E. D. de Oliveira, S. M. Mayrink J, M. L. Rodrigues, B. Dias, L. D. de Oliveira, I. Junior","doi":"10.1109/PTC.2015.7232319","DOIUrl":null,"url":null,"abstract":"This paper presents a model to include a security constraint for wind power plant in a hydrothermal dispatch problem. The proposed Unit Commitment (UC) is an augmented problem to take into account different scenarios of wind speed during the day. The wind farms are represented by a linear model that the generations are considered proportional to the availability of wind. The proposed optimization model uses DC load flow in which transmission system constraints are included. The hydro plants are considered with constant productivity and the times of starting and stopping of thermal generation units are considered as well as ramp deviation. The results using a test system show that the operation of a hydrothermal system is strongly affected by the inclusion of wind farms.","PeriodicalId":193448,"journal":{"name":"2015 IEEE Eindhoven PowerTech","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-09-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Eindhoven PowerTech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.2015.7232319","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

This paper presents a model to include a security constraint for wind power plant in a hydrothermal dispatch problem. The proposed Unit Commitment (UC) is an augmented problem to take into account different scenarios of wind speed during the day. The wind farms are represented by a linear model that the generations are considered proportional to the availability of wind. The proposed optimization model uses DC load flow in which transmission system constraints are included. The hydro plants are considered with constant productivity and the times of starting and stopping of thermal generation units are considered as well as ramp deviation. The results using a test system show that the operation of a hydrothermal system is strongly affected by the inclusion of wind farms.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
风电运行的安全约束
针对热液调度问题,提出了一个包含安全约束的风电场模型。建议的单位承诺(UC)是一个扩展的问题,以考虑白天不同情况下的风速。风力发电场用线性模型表示,代数被认为与风能的可用性成正比。所提出的优化模型采用了考虑输电系统约束的直流潮流。考虑水力发电机组具有恒定的生产能力,并考虑了火力发电机组的启停次数和坡道偏差。测试系统的结果表明,热液系统的运行受到风电场的强烈影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A two-stage random forest method for short-term load forecasting Real-time control of microgrids with explicit power setpoints: Unintentional islanding Warm-commissioning tool of the data chain of digital measurement systems Integration of renewable energy into grid system - the Sabah Green Grid Modeling the PEV traffic pattern in an urban environment with parking lots and charging stations
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1