Increasing Capacity Impact of Power Source Sinergy on Power Flow Evaluation Based on Auxiliary Generator

Wrenda Wira Pradana
{"title":"Increasing Capacity Impact of Power Source Sinergy on Power Flow Evaluation Based on Auxiliary Generator","authors":"Wrenda Wira Pradana","doi":"10.17977/um049v4i2p20-27","DOIUrl":null,"url":null,"abstract":"Steam power plant PT Sinergy Power Source is one of the private steam power plants that have a capacity of 30 MW and supplies 3 main expenses namely PT Mekabox, PT Sopanusa, and PT Sunpaper. Currently, the total load that must be fulfilled by steam power plant PT SPS for the three factories is 25.33 MW and will continue to grow because of the increase in the production number of each plant. With the increasing amount of production, the amount of load will increase so that additional generator capacity is required. This research aims to determine the analysis of power flow planning and coordination setting system protection against the addition of 30 MW generator capacity. Analyze the power flow using ETAP software with the Adaptive Newton-Rapson method. The results of the study showed after the 30 MW generator was added, the work percentage of generators 1 and 2 was lighter and the value of the power flow is relatively the same if the load value is unchanged. For coordination of protection systems itself has been running correctly to handle disruption.     ","PeriodicalId":285860,"journal":{"name":"Frontier Energy System and Power Engineering","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Frontier Energy System and Power Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17977/um049v4i2p20-27","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Steam power plant PT Sinergy Power Source is one of the private steam power plants that have a capacity of 30 MW and supplies 3 main expenses namely PT Mekabox, PT Sopanusa, and PT Sunpaper. Currently, the total load that must be fulfilled by steam power plant PT SPS for the three factories is 25.33 MW and will continue to grow because of the increase in the production number of each plant. With the increasing amount of production, the amount of load will increase so that additional generator capacity is required. This research aims to determine the analysis of power flow planning and coordination setting system protection against the addition of 30 MW generator capacity. Analyze the power flow using ETAP software with the Adaptive Newton-Rapson method. The results of the study showed after the 30 MW generator was added, the work percentage of generators 1 and 2 was lighter and the value of the power flow is relatively the same if the load value is unchanged. For coordination of protection systems itself has been running correctly to handle disruption.     
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于辅助发电机的增容量电源能量对潮流评价的影响
蒸汽发电厂PT Sinergy power Source是一家私人蒸汽发电厂,容量为30兆瓦,供应3个主要费用,即PT Mekabox, PT Sopanusa和PT Sunpaper。目前,这三个工厂必须由蒸汽发电厂PT SPS完成的总负荷为25.33 MW,并且由于每个工厂的生产数量的增加,该负荷将继续增长。随着发电量的增加,负荷也会增加,因此需要增加发电机的容量。本研究的目的是确定分析潮流规划和协调设定系统保护,以防止增加30mw发电机容量。利用ETAP软件,采用自适应牛顿-拉普森法对潮流进行分析。研究结果表明,在负荷值不变的情况下,增加30 MW发电机后,1号和2号发电机的功占比较轻,潮流值也相对相同。对于协调保护系统本身已经正确运行,以处理中断。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Buck Converter Output Voltage Control System Using Proportional Integral Differential Method on Solar Cell Battery Charging Hybrid Method for Optimization of Permanent Magnet Synchronous Machine (PMSM) Rotation using FA-ANFIS Increasing Capacity Impact of Power Source Sinergy on Power Flow Evaluation Based on Auxiliary Generator Optimization of Permanent Magnet Synchronous Generator Output Power in Wind Power Plants Using the Gray Wolf Optimization Method Stability Simulation of 150 kV Malang Power Grid
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1