Model of interruptible load contract for minimum compensation cost

Youbing Zhang, Wei Chen, Q. Gao, Zhijian Liu, Yijia Cao
{"title":"Model of interruptible load contract for minimum compensation cost","authors":"Youbing Zhang, Wei Chen, Q. Gao, Zhijian Liu, Yijia Cao","doi":"10.1109/UPEC.2008.4651458","DOIUrl":null,"url":null,"abstract":"Interruptible load (IL) management as an important component of demand-side management in electricity market affects much the safe and economic operation of the power systems. The cost-benefit of interruptible load participants is analyzed in this paper. The discrete customer category is proposed to indicate the expected compensation for the blackout. This paper presents a model of IL contract, in which the objective function is the minimum compensation cost paid by the power company. The benefits of the power company and the customer are both considered as the restrictions of the model. The actual system examples show the validity of the proposed model.","PeriodicalId":287461,"journal":{"name":"2008 43rd International Universities Power Engineering Conference","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 43rd International Universities Power Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2008.4651458","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Interruptible load (IL) management as an important component of demand-side management in electricity market affects much the safe and economic operation of the power systems. The cost-benefit of interruptible load participants is analyzed in this paper. The discrete customer category is proposed to indicate the expected compensation for the blackout. This paper presents a model of IL contract, in which the objective function is the minimum compensation cost paid by the power company. The benefits of the power company and the customer are both considered as the restrictions of the model. The actual system examples show the validity of the proposed model.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
补偿成本最小的可中断负荷契约模型
可中断负荷管理作为电力市场需求侧管理的重要组成部分,直接关系到电力系统的安全经济运行。本文分析了可中断负荷参与者的成本效益。提出了离散客户类别来表示停电的预期补偿。本文提出了以电力公司支付的补偿费用最小为目标函数的电力合同模型。电力公司和用户的利益都是模型的约束条件。系统实例验证了该模型的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Study on model of power grid operation security cost in market environment Hybrid cascaded H- bridge multilevel inverter for fuel cell power conditioning systems Fault ride-through capability improvement of wind farms using doubly fed induction generator Protection, transient stability and fault ride-through issues in distribution networks with dispersed generation An architecture of spatial three dimension visualization information platform for urban power grid
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1