Integrated Planning of Operating Expenditures (OPEX) - A model to apply best practices when running ERP and DWH systems

Sergi Batalla Martinez, Daniela Wilfinger, Martin Tschandl
{"title":"Integrated Planning of Operating Expenditures (OPEX) - A model to apply best practices when running ERP and DWH systems","authors":"Sergi Batalla Martinez, Daniela Wilfinger, Martin Tschandl","doi":"10.1145/3477911.3477926","DOIUrl":null,"url":null,"abstract":"Controlling departments are confronted with complex and time-consuming OPEX (Operating expenses) planning processes several times a financial year. Medium-sized enterprises and (multinational) corporations usually use Enterprise Resource Planning (ERP) and Data Warehouse (DWH) systems to support, integrate and automate their business processes. ERP and DWH provide a wide range of functionality and features to support planning processes, however since OPEX planning processes are often complex and problematic, it can be challenging to decide which planning activities should be performed in the ERP and which in the DWH system. This paper proposes a model to identify for each one of the main planning activities, when they should be carried out into the ERP system or in DWH according to best practices. First, the OPEX planning process is analyzed in detail, identifying the main phases and activities and revealing inefficiencies. Then, the purposes and best practices related to ERP and DWH systems will be reviewed and outlined. Thereafter, we will formulate our model detailing the best practice for each concerned planning task. The model subsequently developed describes in detail the best practices for each planning task concerned. Finally, this model is applied to a real use case in the context of SAP S/4HANA as ERP system and BW/4HANA as DWH system. This paper is aimed at controllers and their finance and controlling departments, as well as IT-ERP and DWH consultants involved in business planning processes.","PeriodicalId":174824,"journal":{"name":"Proceedings of the 2021 7th International Conference on Computer Technology Applications","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2021 7th International Conference on Computer Technology Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3477911.3477926","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Controlling departments are confronted with complex and time-consuming OPEX (Operating expenses) planning processes several times a financial year. Medium-sized enterprises and (multinational) corporations usually use Enterprise Resource Planning (ERP) and Data Warehouse (DWH) systems to support, integrate and automate their business processes. ERP and DWH provide a wide range of functionality and features to support planning processes, however since OPEX planning processes are often complex and problematic, it can be challenging to decide which planning activities should be performed in the ERP and which in the DWH system. This paper proposes a model to identify for each one of the main planning activities, when they should be carried out into the ERP system or in DWH according to best practices. First, the OPEX planning process is analyzed in detail, identifying the main phases and activities and revealing inefficiencies. Then, the purposes and best practices related to ERP and DWH systems will be reviewed and outlined. Thereafter, we will formulate our model detailing the best practice for each concerned planning task. The model subsequently developed describes in detail the best practices for each planning task concerned. Finally, this model is applied to a real use case in the context of SAP S/4HANA as ERP system and BW/4HANA as DWH system. This paper is aimed at controllers and their finance and controlling departments, as well as IT-ERP and DWH consultants involved in business planning processes.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
运营支出综合规划(OPEX) -在运行ERP和DWH系统时应用最佳实践的模型
在一个财政年度中,控制部门要多次面对复杂而耗时的OPEX(运营费用)计划过程。中型企业和(跨国)公司通常使用企业资源规划(ERP)和数据仓库(DWH)系统来支持、集成和自动化其业务流程。ERP和DWH提供了广泛的功能和特性来支持计划过程,然而,由于OPEX计划过程通常是复杂和有问题的,因此决定哪些计划活动应该在ERP系统中执行,哪些应该在DWH系统中执行是具有挑战性的。本文提出了一个模型来确定每一个主要的规划活动,何时应该根据最佳实践在ERP系统或DWH中进行。首先,详细分析了OPEX计划流程,确定了主要阶段和活动,并揭示了效率低下的地方。然后,将审查和概述与ERP和DWH系统相关的目的和最佳实践。之后,我们会为每一项有关的规划工作制定详细的最佳实践模式。随后开发的模型详细描述了有关的每个规划任务的最佳实践。最后,将该模型应用到SAP S/4HANA作为ERP系统,BW/4HANA作为DWH系统的实际用例中。本文针对财务控制人员及其财务和控制部门,以及参与业务规划过程的IT-ERP和DWH顾问。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Applying Ethereum Smart Contracts to Blockchain-Based Crowdfunding System to Increase Trust and Information Symmetry Video Analytics Architecture with Metadata Event-Engine for Urban Safe Cities Integrated Planning of Operating Expenditures (OPEX) - A model to apply best practices when running ERP and DWH systems Converting Manufacturing Companies into Data-Driven Enterprises: an Evaluation of the Transformation Model Design Workflows and Algorithm Diagrams Interpretation Method in Software Development
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1