Distribution transformer mid-term heavy load and overload pre-warning based on logistic regression

Ming Li, Qinsheng Zhou
{"title":"Distribution transformer mid-term heavy load and overload pre-warning based on logistic regression","authors":"Ming Li, Qinsheng Zhou","doi":"10.1109/PTC.2015.7232418","DOIUrl":null,"url":null,"abstract":"in areas with rapid economic growth, distribution transformer heavy load and overload occur frequently, which may damage the equipment and even lead to power outages. Therefore, it is critical for the utilities to know which distribution transformers are more likely to have the heavy load /overload conditions in the next year in order to facilitate asset management in distribution network. However, current load forecasting methods are not suitable for handling the large amount of distribution transformers with a high variety of load patterns. Utilizing real data from a utility, a mid-term pre-warning analytics model has been developed to provide the heavy load and overload probabilities in the next year for each distribution transformer in an area. The mid-term pre-warning models have been implemented in a major utility in China.","PeriodicalId":193448,"journal":{"name":"2015 IEEE Eindhoven PowerTech","volume":"133 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-09-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Eindhoven PowerTech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.2015.7232418","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

in areas with rapid economic growth, distribution transformer heavy load and overload occur frequently, which may damage the equipment and even lead to power outages. Therefore, it is critical for the utilities to know which distribution transformers are more likely to have the heavy load /overload conditions in the next year in order to facilitate asset management in distribution network. However, current load forecasting methods are not suitable for handling the large amount of distribution transformers with a high variety of load patterns. Utilizing real data from a utility, a mid-term pre-warning analytics model has been developed to provide the heavy load and overload probabilities in the next year for each distribution transformer in an area. The mid-term pre-warning models have been implemented in a major utility in China.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于logistic回归的配电变压器中期重负荷过载预警
在经济快速增长的地区,配电变压器重载、过载的情况经常发生,可能会损坏设备,甚至导致停电。因此,为了便于配电网的资产管理,了解哪些配电变压器在未来一年内更有可能出现重负荷/过载情况,对于电力公司来说至关重要。然而,现有的负荷预测方法并不适用于负荷模式多变、数量庞大的配电变压器。利用某公用事业公司的实际数据,建立了一个中期预警分析模型,为某地区的每台配电变压器提供了下一年的重负荷和过载概率。中期预警模型已在国内某大型公用事业公司实施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A two-stage random forest method for short-term load forecasting Real-time control of microgrids with explicit power setpoints: Unintentional islanding Warm-commissioning tool of the data chain of digital measurement systems Integration of renewable energy into grid system - the Sabah Green Grid Modeling the PEV traffic pattern in an urban environment with parking lots and charging stations
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1