Case study of unforeseen negative impacts of a TQM program

B. Moore
{"title":"Case study of unforeseen negative impacts of a TQM program","authors":"B. Moore","doi":"10.1109/IEMC.1994.379949","DOIUrl":null,"url":null,"abstract":"Presented is a case study of some of the adverse impacts of formalization of a total quality management (TQM) program in a medium sized business. A brief description of the company culture before and after implementation of the TQM program is provided. The informal quality processes and employee attitudes are characterized followed by a depiction of the TQM formalization efforts and its impacts: both positive and negative. Since the negative results outweighed the positive in this example, the company shall be referred to as Company Z.<<ETX>>","PeriodicalId":200747,"journal":{"name":"Proceedings of 1994 IEEE International Engineering Management Conference - IEMC '94","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-10-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 1994 IEEE International Engineering Management Conference - IEMC '94","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMC.1994.379949","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Presented is a case study of some of the adverse impacts of formalization of a total quality management (TQM) program in a medium sized business. A brief description of the company culture before and after implementation of the TQM program is provided. The informal quality processes and employee attitudes are characterized followed by a depiction of the TQM formalization efforts and its impacts: both positive and negative. Since the negative results outweighed the positive in this example, the company shall be referred to as Company Z.<>
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
全面质量管理计划不可预见的负面影响的案例研究
本文介绍了一个中型企业全面质量管理(TQM)计划形式化的一些不利影响的案例研究。简要介绍了实施TQM计划前后的公司文化。非正式质量过程和员工态度的特征,随后描述了TQM形式化的努力及其影响:积极的和消极的。由于在本例中,负面结果大于正面结果,因此将该公司称为z公司
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Application of technology transfer to SME Transferring software engineering methods to VLSI-design: a statistical approach Saaty's AHP with inner dependent hierarchy and the choice of key industries An analytic approach to the analysis and selection of transport services Case study of unforeseen negative impacts of a TQM program
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1