{"title":"Moving Trains like Pebbles: A Feasibility Study on Tree Yards","authors":"Issa K. Hanou, M. D. Weerdt, J. Mulderij","doi":"10.1609/icaps.v33i1.27228","DOIUrl":null,"url":null,"abstract":"The Train Unit Shunting Problem concerns the parking of trains outside their scheduled use on so-called shunting yards. This is an NP-hard problem, and the current algorithm used by the Netherlands Railways cannot detect whether an instance is infeasible. So, infeasible instances can cause needlessly long computation times. Therefore, this paper fills the gap by providing novel approaches to determine the feasibility. For this, the Pebble Motion problem is considered which moves pebbles from their starting node to their goal node in the graph, such that no two pebbles occupy a node at the same time. A variant of the Pebble Motion problem is proposed to model the Train Unit Shunting Problem, where train units are represented by pebbles and the arrival and departure of train unit combinations are also included. This paper specifically looks at dead-end track shunting yards, as they can be abstractly represented by trees, such that trains arrive and depart at the root node. Furthermore, trains cannot be reallocated between arrival and departure in the tree, since reallocation in practice is a very costly process as moves need to be performed by a small set of drivers. The conditions for realizing the departure order of trains are studied, and an efficient method to (partially) determine the feasibility of problem instances is given, which can find the minimal number of tracks required to park the trains. Furthermore, a special case with tracks of length two is shown to be polynomially solvable, while another subset of problem instances with tracks of length six or more is demonstrated to be NP-complete.","PeriodicalId":239898,"journal":{"name":"International Conference on Automated Planning and Scheduling","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Automated Planning and Scheduling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1609/icaps.v33i1.27228","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Train Unit Shunting Problem concerns the parking of trains outside their scheduled use on so-called shunting yards. This is an NP-hard problem, and the current algorithm used by the Netherlands Railways cannot detect whether an instance is infeasible. So, infeasible instances can cause needlessly long computation times. Therefore, this paper fills the gap by providing novel approaches to determine the feasibility. For this, the Pebble Motion problem is considered which moves pebbles from their starting node to their goal node in the graph, such that no two pebbles occupy a node at the same time. A variant of the Pebble Motion problem is proposed to model the Train Unit Shunting Problem, where train units are represented by pebbles and the arrival and departure of train unit combinations are also included. This paper specifically looks at dead-end track shunting yards, as they can be abstractly represented by trees, such that trains arrive and depart at the root node. Furthermore, trains cannot be reallocated between arrival and departure in the tree, since reallocation in practice is a very costly process as moves need to be performed by a small set of drivers. The conditions for realizing the departure order of trains are studied, and an efficient method to (partially) determine the feasibility of problem instances is given, which can find the minimal number of tracks required to park the trains. Furthermore, a special case with tracks of length two is shown to be polynomially solvable, while another subset of problem instances with tracks of length six or more is demonstrated to be NP-complete.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
像鹅卵石一样移动的火车:树场的可行性研究
列车单元调车问题涉及在所谓的调车场停放超出预定使用范围的列车。这是一个np困难问题,目前荷兰铁路使用的算法无法检测实例是否不可行的。因此,不可行的实例可能导致不必要的长计算时间。因此,本文通过提供新的方法来确定可行性,填补了这一空白。为此,考虑了Pebble Motion问题,该问题将鹅卵石从图中的起始节点移动到目标节点,这样就不会有两个鹅卵石同时占用一个节点。提出了一种鹅卵石运动问题的变体来模拟列车单元分流问题,其中列车单元由鹅卵石表示,列车单元组合的到达和离开也包括在内。本文专门研究了死角轨道调车场,因为它们可以用树抽象地表示,这样列车就可以在根节点到达和离开。此外,列车不能在树的到站和发站之间重新分配,因为重新分配实际上是一个非常昂贵的过程,因为移动需要由一小部分司机执行。研究了实现列车发车顺序的条件,给出了一种(部分)确定问题实例可行性的有效方法,该方法能找到停放列车所需的最小轨道数。此外,还证明了轨道长度为2的特殊情况是多项式可解的,而轨道长度为6或更多的问题实例的另一个子集是np完全的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Fast and Robust Resource-Constrained Scheduling with Graph Neural Networks Solving the Multi-Choice Two Dimensional Shelf Strip Packing Problem with Time Windows Generalizing Action Justification and Causal Links to Policies Exact Anytime Multi-Agent Path Finding Using Branch-and-Cut-and-Price and Large Neighborhood Search A Constraint Programming Solution to the Guillotine Rectangular Cutting Problem
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1