Opening a larger window on network flows to enhance the cross border capacity allocation in bulk interconnected systems

C. Genesi, G. Granelli, P. Marannino, M. Montagna, F. Zanellini
{"title":"Opening a larger window on network flows to enhance the cross border capacity allocation in bulk interconnected systems","authors":"C. Genesi, G. Granelli, P. Marannino, M. Montagna, F. Zanellini","doi":"10.1109/IREP.2007.4410527","DOIUrl":null,"url":null,"abstract":"Based on the analysis of the recent huge blackouts that stroke some countries in the European systems, the authors of the paper emphasize as a right knowledge of the actual cross border transmission capacities (CBTCs) is becoming of primary importance in order to obtain a secure operation of the whole system, independently from the method adopted in its allocation. Among the different methods proposed for the CBTCs allocation the behavior of the so called coordinated auctioning (CA) has been simulated in an automatic procedure applied to the analysis of the UCTE system with reference to scenarios of the years 2005 and 2010. The adopted simulator allows the supervision of the network flows not only in each interconnection line, but also in the first ones living the borders to enter in the national networks. Opening a larger window on the network flows, the simulator is able to put in evidence the role played in the CBTC allocation by the presence of internal bottlenecks. Examples are given showing as limiting the control to the Net Transmission Capacity (NTC) published by each Transmission System Operator (TSO) or extending the supervision only to the lines of the interconnection corridors is not enough to attain the most suitable information for a secure and economic CBTC allocation.","PeriodicalId":214545,"journal":{"name":"2007 iREP Symposium - Bulk Power System Dynamics and Control - VII. Revitalizing Operational Reliability","volume":"131 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-12-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 iREP Symposium - Bulk Power System Dynamics and Control - VII. Revitalizing Operational Reliability","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IREP.2007.4410527","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Based on the analysis of the recent huge blackouts that stroke some countries in the European systems, the authors of the paper emphasize as a right knowledge of the actual cross border transmission capacities (CBTCs) is becoming of primary importance in order to obtain a secure operation of the whole system, independently from the method adopted in its allocation. Among the different methods proposed for the CBTCs allocation the behavior of the so called coordinated auctioning (CA) has been simulated in an automatic procedure applied to the analysis of the UCTE system with reference to scenarios of the years 2005 and 2010. The adopted simulator allows the supervision of the network flows not only in each interconnection line, but also in the first ones living the borders to enter in the national networks. Opening a larger window on the network flows, the simulator is able to put in evidence the role played in the CBTC allocation by the presence of internal bottlenecks. Examples are given showing as limiting the control to the Net Transmission Capacity (NTC) published by each Transmission System Operator (TSO) or extending the supervision only to the lines of the interconnection corridors is not enough to attain the most suitable information for a secure and economic CBTC allocation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
打开更大的网络流量窗口,加强大容量互联系统的跨境容量分配
通过对欧洲一些国家最近发生的大规模停电事件的分析,本文作者强调,为了获得整个系统的安全运行,对实际跨境输电能力(cbtc)的正确认识变得至关重要,而不是采用分配方法。在提出的不同cbtc分配方法中,以2005年和2010年的情景为参考,在UCTE系统分析中模拟了所谓的协调拍卖(CA)行为。所采用的模拟器不仅可以对每条互连线路中的网络流量进行监督,还可以对第一批进入国家网络边界的网络流量进行监督。在网络流上打开一个更大的窗口,模拟器能够通过内部瓶颈的存在来证明CBTC分配中所起的作用。给出的例子表明,将控制限制在每个传输系统运营商(TSO)公布的净传输容量(NTC)或将监管范围仅扩展到互联走廊的线路上,不足以获得最合适的信息,以实现安全和经济的CBTC分配。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Risk assessment approach for re-regulated distribution systems The economic aspects of operational reliability in electricity markets Optimal Energy Flow of integrated energy systems with hydrogen economy considerations A hybrid on-line slow voltage control scheme for large power systems Satellite based communication network for large scale power system applications
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1